Data Element list used by SAP ABAP Table CM61M (MRP Control Indicator -Material Level-)
SAP ABAP Table CM61M (MRP Control Indicator -Material Level-) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
1 | Data Element | A1BED | Dependent reservation - standard orders | |
2 | Data Element | A2BED | Dependent reservation - plant maintenance orders and network | |
3 | Data Element | AGRES | Aggregated dependent requirements | |
4 | Data Element | AHDIS | MRP relevancy for dependent requirements | |
5 | Data Element | ANDEC | No. of decimal places to which rounding should be performed | |
6 | Data Element | ANDIS | Number of Days After Which the Material Must Be Planned | |
7 | Data Element | BANER | Creation Indicator for Purchase Requisitions | |
8 | Data Element | BBBED | Material staging reqmts (subcontr. reqmts) MRP element BB | |
9 | Data Element | BBSRT_LB | MRP: Document type purchase requisition for subcontracting | |
10 | Data Element | BBSRT_NB | MRP:doc.type purchase requisitions for standard purchase ord | |
11 | Data Element | BBSRT_UL | MRP: purchase requisition for stock transfer - document type | |
12 | Data Element | BESAL | Determine Explosion Date for BOM and Routing | |
13 | Data Element | CHAR1 | Single-Character Flag | |
14 | Data Element | CHAR1 | Single-Character Flag | |
15 | Data Element | CHAR1 | Single-Character Flag | |
16 | Data Element | DISER | Creation Indicator for MRP Lists | |
17 | Data Element | EXSGT | Do Not Explode Bulk Material Items | |
18 | Data Element | FIXTR | End of planning time fence (date) | |
19 | Data Element | FKOBS | ATP check by full confirmation logic | |
20 | Data Element | FXART | Firming Type of the Planning Result | |
21 | Data Element | FXHOR | Planning time fence | |
22 | Data Element | GRREL | Relevant for requirements grouping for project stock | |
23 | Data Element | GTERM | Scheduling according to purchasing info record or agreement | |
24 | Data Element | ICBED | Reorder point planning with external requirements | |
25 | Data Element | KZBED | Indicator for Requirements Grouping | |
26 | Data Element | KZDRB | Indicator: direct procurement/production MRP | |
27 | Data Element | KZREG | Indicator: plan material regularly | |
28 | Data Element | LIFKZ | Automatic Schedule Lines (Scheduling Agreements) | |
29 | Data Element | MD_FABKL_COV | Material-Specific Calendar (Range of Coverage) | |
30 | Data Element | MD_MES_CNF_DIF | Reduction from Confirmation of Different Planned Orders | |
31 | Data Element | MD_SCFLG | Indicator: General Subcontracting Logic | |
32 | Data Element | MD_UMLDB | Indicator for Stock Transfer with MRP Areas | |
33 | Data Element | MENGU | Quantity Updating in Material Master Record | |
34 | Data Element | MFDAT | Set manual firming date: Date to set | |
35 | Data Element | MFHKZ | Planning time fence set manually (MFXDT) | |
36 | Data Element | MFNAM | Set manual firming date: User | |
37 | Data Element | MFXDT | Manual firming date | |
38 | Data Element | MFXKZ | Indicator: MFXDT changed | |
39 | Data Element | NODUM | No requirements for phantom assembly | |
40 | Data Element | OPFDT | Date of firm planned order last copied from MRP | |
41 | Data Element | OPFKZ | Indicator:OPFDT changed | |
42 | Data Element | OSELT | Above selection date | |
43 | Data Element | PLAHZ | Planning horizon | |
44 | Data Element | PLIFZ | Planned delivery time in days | |
45 | Data Element | PLNKZ | Planning Indicator | |
46 | Data Element | PLSEL | Issue Storage Location Selection | |
47 | Data Element | PLTER | End of planning horizon | |
48 | Data Element | PRREG | Checking rule for the availability check | |
49 | Data Element | PSTMP | Last Change to Planned Order: Time Stamp | |
50 | Data Element | RESHZ | Roll forward period for the master plan | |
51 | Data Element | RESPL | Indicator: delete firm planned orders | |
52 | Data Element | RESVP | Period of adjustment for planned independent requirements | |
53 | Data Element | RHDAT | Next planning date for time-phased planning | |
54 | Data Element | RHEND | End of the requirements period for time-phased MRP | |
55 | Data Element | RSTER | End of roll forward period | |
56 | Data Element | RVPKZ | Adjustment of Planned Independent Requirements | |
57 | Data Element | RVPTR | End of adjustment period for planned independent reqmts | |
58 | Data Element | RW1DT | Planning horizon for range of coverage 01 | |
59 | Data Element | RW1TG | Target Range of Coverage in Period 01 | |
60 | Data Element | RW1TG | Target Range of Coverage in Period 01 | |
61 | Data Element | RW1TG | Target Range of Coverage in Period 01 | |
62 | Data Element | RW1TG | Target Range of Coverage in Period 01 | |
63 | Data Element | RW1TG | Target Range of Coverage in Period 01 | |
64 | Data Element | RW1TG | Target Range of Coverage in Period 01 | |
65 | Data Element | RW1TG | Target Range of Coverage in Period 01 | |
66 | Data Element | RW2DT | Planning horizon for range of coverage 02 | |
67 | Data Element | RW2TG | Target Range of Coverage in Period 02 | |
68 | Data Element | RW3TG | Target Range of Coverage in the Rest of the Period | |
69 | Data Element | RWANZ | Number of periods for determining the average | |
70 | Data Element | RWART | Period length type for calculating the average | |
71 | Data Element | RWFLG | Calculate safety stock based on range of coverage | |
72 | Data Element | RWNTG | Number of days per range of coverage period | |
73 | Data Element | RWPER | Period for Calculating the Dynamic Safety Stock | |
74 | Data Element | RYBED | Time-phased planning with requirements (MRP) | |
75 | Data Element | SBDIS | Share of safety stock which can be used for planning | |
76 | Data Element | STDPD | Configurable material | |
77 | Data Element | SUMAU | Total sales order requirements | |
78 | Data Element | U1BED | Release for stock transfer order | |
79 | Data Element | U2BED | Delivery schedule for a stock transfer requisition | |
80 | Data Element | U4BED | Delivery schedule for stock transport scheduling agreement | |
81 | Data Element | UMTER | End of rescheduling horizon (date) | |
82 | Data Element | UMTHZ | Rescheduling horizon | |
83 | Data Element | USEQU | Quota arrangement usage | |
84 | Data Element | VERTR | Start date of order proposals allowed in the past | |
85 | Data Element | VINT1 | Consumption period: backward | |
86 | Data Element | VINT2 | Consumption period: forward | |
87 | Data Element | VRMOD | Consumption mode | |
88 | Data Element | VWVER | Tolerance value for displacement in the future | |
89 | Data Element | VWVOR | Tolerance value for bringing forward receipt elements | |
90 | Data Element | WERTU | Value Updating in Material Master Record | |
91 | Data Element | WZTER | End of replenishment lead time | |
92 | Data Element | WZTER | End of replenishment lead time | |
93 | Data Element | XFAT1 | Firm Only Schedule Lines Transmitted to Vendor by Purchasing | |
94 | Data Element | XVPLB | Planning Variant |