SAP ABAP Data Element BANER (Creation Indicator for Purchase Requisitions)
Hierarchy
☛
SAP_ABA (Software Component) Cross-Application Component
⤷ CA-GTF-TS (Application Component) Technical Application Support
⤷ BMG (Package) Material Master: Componentization Interfaces
⤷ CA-GTF-TS (Application Component) Technical Application Support
⤷ BMG (Package) Material Master: Componentization Interfaces
Basic Data
Data Element | BANER |
Short Description | Creation Indicator for Purchase Requisitions |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | BANER | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | CREATE_PURREQ | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Purch.req. |
Medium | 15 | Create pur.req. |
Long | 25 | Create purchase req. |
Heading | 2 | PR |
Documentation
Definition
For materials procured externally, this indicator controls whether the system:
- creates purchase requisitions for the total planning horizon,
- creates planned orders for the total planning horizon which are manually converted into purchase requisitions at a later date,
- creates purchase requisitions within the opening period and planned orders outside the opening period.
Supplementary Documentation - BANER 0001
Use
Procedure
Examples
Dependencies
The creation indicator for purchase requisitions that you enter in the initial screen of the planning run is only valid if the SAP system cannot find a creation indicator via the MRP group.
If an MRP group with a creation indicator has been assigned to the material, then this material will be planned with the indicator recorded in the MRP group.
Supplementary Documentation - BANER 0002
Use
Procedure
Examples
Dependencies
In the single-item planning run, the system always uses the creation indicator specified in the initial screen of the planning run. The creation indicator maintained in the MRP group is not taken into account.