SAP ABAP Data Element PLIFZ (Planned delivery time in days)
Hierarchy
☛
SAP_ABA (Software Component) Cross-Application Component
⤷ CA-GTF-TS (Application Component) Technical Application Support
⤷ BMG (Package) Material Master: Componentization Interfaces
⤷ CA-GTF-TS (Application Component) Technical Application Support
⤷ BMG (Package) Material Master: Componentization Interfaces
Basic Data
Data Element | PLIFZ |
Short Description | Planned delivery time in days |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DEC3 | |
Data Type | DEC | Counter or amount field with comma and sign |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | PLND_DELRY | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Plnd dely |
Medium | 15 | Plnd dely time |
Long | 20 | Plnd delivery time |
Heading | 3 | PDT |
Documentation
Definition
Number of calendar days needed to obtain the material or service if it is procured externally.
Use
Procedure
If you have different vendors for a material, you must specify an average value. The same applies if you order the material from a fixed vendor that has varying delivery times.
Examples
Dependencies
If you use the SAP Retail System, the planned delivery time can be suggested from the vendor sub-range in the vendor master record.
Supplementary Documentation - PLIFZ 0002
Use
The planned delivery time is needed for planning material requirements and for scheduling.
Procedure
Enter the number of days taken by the vendor to supply the material.
Dependencies
This value is suggested when a purchase order item or an outline agreement item is created.
History
Last changed by/on | SAP | 19981210 |
SAP Release Created in |