Basic Data
Data Element | LIFKZ |
Short Description | Automatic Schedule Lines (Scheduling Agreements) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | LIFKZ | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | CREATE_SCHED_LINES | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Sched.line |
Medium | 15 | Schedule lines |
Long | 25 | Schedule lines |
Heading | 2 | SL |
Documentation
Definition
Indicator controls whether, during the planning run, the system
- never creates schedule lines,
- only creates schedule lines in the opening period, or
- whether it creates schedule lines in the planning horizon.
Supplementary Documentation - LIFKZ 0001
Use
If you set an indicator here, then this entry is valid for total planning. This indicator has precedence over the entry in the initial screen of total planning.
If you do not set an indicator here, then the entry in the initial screen is valid for total planning.
Procedure
Examples
Dependencies
Supplementary Documentation - LIFKZ 0002
Use
Procedure
Examples
Dependencies
The creation indicators you enter for scheduling agreements in the initial screen of the planning run is only valid for a material, if:
- the SAP system finds no creation indicator via the MRP group, or
- if the creation indicator has not been set for the plant you want to plan.
If creation indicators have already been maintained for scheduling agreements in Customizing for MRP, the following is valid: If the creation indicators have been maintained per plant, this value overrules any entry in the initial screen of the total planning run.
- If a material has been assigned an MRP group which contains a creation indicator, the system will use the creation indicator recorded in the MRP group for the planning run. The indicator per plant and the entry in the initial screen of the planning run are then ignored.
- If no indicator has been maintained per plant, and no MRP group with creation indicator has been assigned to the material, then the system uses the entry in the initial screen of the planning run.
Supplementary Documentation - LIFKZ 0003
Use
Procedure
Examples
Dependencies
The system always uses the creation indicator that you maintain in the initial screen of the planning run. The creation indicator that is maintained in the MRP group is not taken into account.
History
Last changed by/on | SAP | 19990629 |