Where Used List (Table) for SAP ABAP Table OIJLOCMAT (OIL-TSW: Location Rundown/Planning material table)
SAP ABAP Table
OIJLOCMAT (OIL-TSW: Location Rundown/Planning material table) is used by
| # | Object Type | Object Name | Object Description | Package | Structure Package | Software Component |
|---|---|---|---|---|---|---|
| 1 | BAPITSWLOCMAT03 | TSW Location Rundowndata for Material | ||||
| 2 | BAPITSWLOCMAT03 | TSW Location Rundowndata for Material | ||||
| 3 | BAPITSWLOCMAT04 | TSW Location Planningparameters for Material | ||||
| 4 | BAPITSWLOCMAT04 | TSW Location Planningparameters for Material | ||||
| 5 | BAPITSWLOCMAT05 | TSW Location Safetystock planning settings | ||||
| 6 | BAPITSWLOCMAT05 | TSW Location Safetystock planning settings | ||||
| 7 | BAPITSWLOCMAT06 | TSW Location Supply Constraints | ||||
| 8 | BAPITSWLOCMAT06 | TSW Location Supply Constraints | ||||
| 9 | BAPITSWLOCMAT07 | TSW Location Inventory levels | ||||
| 10 | BAPITSWLOCMAT07 | TSW Location Inventory levels | ||||
| 11 | BAPITSWLOCMAT08 | TSW Location Supply Source Defaults | ||||
| 12 | BAPITSWLOCMAT08 | TSW Location Supply Source Defaults | ||||
| 13 | OIJBERMAT | Assignment of material to berths | ||||
| 14 | OIJBRDH | RD header f.batch:Don't use(obsolete) & don't delete(XPRA) | ||||
| 15 | OIJCOV | OIL-TSW: Safety stock coverage period profile | ||||
| 16 | OIJLOCMAT | OIL-TSW: Location Rundown/Planning material table | ||||
| 17 | OIJRDH | Rundown header: Don't use (obsolete) & don't delete (XPRA) | ||||
| 18 | OIJTGTCOV | OIL-TSW: Target stock coverage period profile | ||||
| 19 | OIJTSMAT | OIL-TSW: TS Rundown/Planning material table | ||||
| 20 | OIJ_LMTIMECON | OILTSW: Time dependent constraints by location & material | ||||
| 21 | OIJ_RDHEAD | Stock Projection header | ||||
| 22 | OIJ_TGTSFTTIME | Time dependent target and safety levels | ||||
| 23 | ROIJLOCMAT | OIL-TSW: Structure for int. table OIJLOCMAT_TAB | ||||
| 24 | ROIJLOCMAT_LIST | OIL TSW: Field catalogue structure for report ROIJLOC_LIST | ||||
| 25 | ROIJRDHM | Rundown header material structure | ||||
| 26 | ROIJRDLOCSEL | OIL-TSW: Rundown location selection structure | ||||
| 27 | ROIJSSC_ALV1 | Structre For ROIJSSC | ||||
| 28 | ROIJTCONS_OUT | TSW ALV output struc. for time dependent planning constraint | ||||
| 29 | ROIJTGTSFTTIME | Structure for ALV of calculated target and safety stock | ||||
| 30 | VOIJLOCMAT | Change Document Structure; Generated by RSSCD000 |