Where Used List (Table) for SAP ABAP Data Element QKZVERF (Procedure for Calculating Quality Score)
SAP ABAP Data Element
QKZVERF (Procedure for Calculating Quality Score) is used by
| # | Object Type | Object Name | Object Description | Package | Structure Package | Software Component |
|---|---|---|---|---|---|---|
| 1 | BAPI1001004_QMAT - QUAL_SCORE_PROCEDURE | Insp. Setup for Material (QMAT) ALE Distribution with BAPI | ||||
| 2 | BAPI2045D_IL0 - QUAL_SCORE_PROCEDURE | General Data for Inspection Lot | ||||
| 3 | BAPIQMAT - QKZVERF | BAPI Parameter for QMAT Distribution | ||||
| 4 | DQMAT - QKZVERF | Shortened QMAT Structure for Change Documents | ||||
| 5 | MCPLOS - QKZVERF | Communication R/2 - R/3 link for inspection lot | ||||
| 6 | MCQALS - QKZVERF | Insp.lot: interface to QIS | ||||
| 7 | MCQALSB - QKZVERF | QIS: communication structure for insp.lot | ||||
| 8 | OLR3_R3_TS_INSP_LOT_DATA - QKZVERF | Fields for Inspection Lot | ||||
| 9 | OLR3_R3_TS_PO_DATA - QKZVERF | Fields for Purchase Order | ||||
| 10 | OLR3_R3_TS_REQ_DATA - QKZVERF | Fields for Puchase Requisition for External Activity | ||||
| 11 | OPS_RQEEAS20_STR_PDF - QKZVERF | Inspection Instruction | ||||
| 12 | OPS_RQEEAS20_TSTR2_PDF - QKZVERF | Inspection Instruction | ||||
| 13 | OPS_RQGAAM31_QALS_S - QKZVERF | Inspection_lot_record | ||||
| 14 | QALS - QKZVERF | Inspection lot record | ||||
| 15 | QALSVB - QKZVERF | QALS structure and update indicator | ||||
| 16 | QMAT - QKZVERF | Inspection type - material parameters | ||||
| 17 | QMAT_D01 - QKZVERF | Fields to be printed in the QA08 | ||||
| 18 | QSQMAT - QKZVERF | QMAT change documents : Copy from XDQMAT due to syntax check | ||||
| 19 | RMQAM - QKZVERF | Screen fields for maintaining the material assignment | ||||
| 20 | TQ06 - QKZVERF | Procedure for Calculating the Quality Score | ||||
| 21 | TQ06T - QKZVERF | Language-specific texts for Table TQ06 | ||||
| 22 | TQ34 - QKZVERF | Default values for inspection type | ||||
| 23 | WPQMAT - QKZVERF | Extended QMAT Structure (Engineering Change Management) | ||||
| 24 | XDQMAT - QKZVERF | Structure for Change Document: Generated by RSSCD000 |