Data Element list used by SAP ABAP View V_TCY08 (Option Profile)
SAP ABAP View
V_TCY08 (Option Profile) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | CR_HNAME | Name of hierarchy | ||
| 2 | CR_VERTL | Distribution of capacity requirements (Planned/prod.order) | ||
| 3 | CR_VERTLN | Distr.cap.reqmts (plant maint.,process order, network) | ||
| 4 | CY_ANVER | Cumulate available capacity using work center hierarchy | ||
| 5 | CY_DATEF | Start date for output of capacity evaluations | ||
| 6 | CY_DATET | Finish date for output of capacity evaluations | ||
| 7 | CY_DCNTB | Offset (in days) of end date for lists to current date | ||
| 8 | CY_DCNTV | Offset (in days) of start date for lists to current date | ||
| 9 | CY_KEINH | Unit of of measure for displaying capacity requirements | ||
| 10 | CY_RDATE | Date of backlog dispatching | ||
| 11 | CY_RDATETY | Type of date specification | ||
| 12 | CY_SBART | Requirements category (scheduled or remaining) | ||
| 13 | CY_TTARBPL | Switch: Branch to work center - change or display | ||
| 14 | CY_TTFAUFT | Indicator: Branch to production order - change or display | ||
| 15 | CY_TTPAUFT | Indicator: Branch to planned order display or maintenance | ||
| 16 | CY_UNITSRC | Origin of unit of measure for available cap. and cap.reqmts | ||
| 17 | CY_ZAPER | Type of date specification | ||
| 18 | DAPED | Duration of a period (units as specified in period type) | ||
| 19 | DAPER | Unit in which the period duration is specified (day, week..) | ||
| 20 | DARPROF_ID | ID of a user-spec. profile in the table for option profiles | ||
| 21 | DARPTXT | Description of an option profile | ||
| 22 | DAVAP | Distribution according to key in work center or operation | ||
| 23 | HIEVER | Cumulate capacity requirements using work center hierarchy | ||
| 24 | KUMULD | Indicator, whether cumulated display is desired | ||
| 25 | MANDT | Client | ||
| 26 | MAXBELA | Maximum load that will be displayed | ||
| 27 | MINBELA | Minimum load that will be displayed | ||
| 28 | MRPPP | PPC planning calendar | ||
| 29 | RDATUM_CNT | Offset (in days) of dispatch date for backlog to curr. date | ||
| 30 | WERKS_D | Plant | ||
| 31 | WERKS_D | Plant |