Data Element list used by SAP ABAP Table TCY08 (Option profiles)
SAP ABAP Table
TCY08 (Option profiles) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
![]() |
![]() |
|||
1 | ![]() |
CR_HNAME | Name of hierarchy | |
2 | ![]() |
CR_VERTL | Distribution of capacity requirements (Planned/prod.order) | |
3 | ![]() |
CR_VERTLN | Distr.cap.reqmts (plant maint.,process order, network) | |
4 | ![]() |
CY_ANVER | Cumulate available capacity using work center hierarchy | |
5 | ![]() |
CY_DATEF | Start date for output of capacity evaluations | |
6 | ![]() |
CY_DATET | Finish date for output of capacity evaluations | |
7 | ![]() |
CY_DCNTB | Offset (in days) of end date for lists to current date | |
8 | ![]() |
CY_DCNTV | Offset (in days) of start date for lists to current date | |
9 | ![]() |
CY_KEINH | Unit of of measure for displaying capacity requirements | |
10 | ![]() |
CY_POOLKAP | Indicator: Cumulated view of the rqmts of pooled capacity | |
11 | ![]() |
CY_RDATE | Date of backlog dispatching | |
12 | ![]() |
CY_RDATETY | Type of date specification | |
13 | ![]() |
CY_SBART | Requirements category (scheduled or remaining) | |
14 | ![]() |
CY_TTARBPL | Switch: Branch to work center - change or display | |
15 | ![]() |
CY_TTFAUFT | Indicator: Branch to production order - change or display | |
16 | ![]() |
CY_TTPAUFT | Indicator: Branch to planned order display or maintenance | |
17 | ![]() |
CY_UNITSRC | Origin of unit of measure for available cap. and cap.reqmts | |
18 | ![]() |
CY_ZAPER | Type of date specification | |
19 | ![]() |
DAPED | Duration of a period (units as specified in period type) | |
20 | ![]() |
DAPER | Unit in which the period duration is specified (day, week..) | |
21 | ![]() |
DARPROF_ID | ID of a user-spec. profile in the table for option profiles | |
22 | ![]() |
DAVAP | Distribution according to key in work center or operation | |
23 | ![]() |
HIEAUF | Explode hierarchy | |
24 | ![]() |
HIEVER | Cumulate capacity requirements using work center hierarchy | |
25 | ![]() |
KUMULD | Indicator, whether cumulated display is desired | |
26 | ![]() |
MANDT | Client | |
27 | ![]() |
MAXBELA | Maximum load that will be displayed | |
28 | ![]() |
MINBELA | Minimum load that will be displayed | |
29 | ![]() |
MRPPP | PPC planning calendar | |
30 | ![]() |
RDATUM_CNT | Offset (in days) of dispatch date for backlog to curr. date | |
31 | ![]() |
WERKS_D | Plant | |
32 | ![]() |
WERKS_D | Plant |