Table/Structure Field list used by SAP ABAP Program RMCSS281 (Business Information Warehouse Fortschreibung für LIS Info-Strukturen)
SAP ABAP Program RMCSS281 (Business Information Warehouse Fortschreibung für LIS Info-Strukturen) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
1 | Table/Structure Field | EMARA - MEINS | Base Unit of Measure | |
2 | Table/Structure Field | MARA - MEINS | Base Unit of Measure | |
3 | Table/Structure Field | MCAFKO - AUFNR | Order Number | |
4 | Table/Structure Field | MCAFKO - BUKRS | Company Code | |
5 | Table/Structure Field | MCAFKO - FTRMI | Actual release date | |
6 | Table/Structure Field | MCAFKOB - AUFNR | Order Number | |
7 | Table/Structure Field | MCAFKOB - BUKRS | Company Code | |
8 | Table/Structure Field | MCAFKOB - FTRMI | Actual release date | |
9 | Table/Structure Field | MCAFKOB - SUPKZ | Statistics update indicator (post in/post out) | |
10 | Table/Structure Field | MCAFPO - KDAUF | Sales order number | |
11 | Table/Structure Field | MCAFPO - MATNR | Material Number | |
12 | Table/Structure Field | MCAFPO - PWERK | Planning plant for the order | |
13 | Table/Structure Field | MCAFPOB - KDAUF | Sales order number | |
14 | Table/Structure Field | MCAFPOB - MATNR | Material Number | |
15 | Table/Structure Field | MCAFPOB - PWERK | Planning plant for the order | |
16 | Table/Structure Field | MCAFVG - ABRUE | Scheduled teardown time | |
17 | Table/Structure Field | MCAFVG - ARBPL | Work center | |
18 | Table/Structure Field | MCAFVG - ARUZE | Unit of measure for teardown | |
19 | Table/Structure Field | MCAFVG - ASVRG | Operation scrap | |
20 | Table/Structure Field | MCAFVG - BEARZ | Scheduled processing time | |
21 | Table/Structure Field | MCAFVG - BEAZE | Unit of measure for processing time | |
22 | Table/Structure Field | MCAFVG - BUDAT | Posting date of last confirmation | |
23 | Table/Structure Field | MCAFVG - DFZEH | Unit of measure for execution time | |
24 | Table/Structure Field | MCAFVG - FSAVD | Earliest scheduled start: Execution (date) | |
25 | Table/Structure Field | MCAFVG - FSEDD | Earliest scheduled finish: Execution (date) | |
26 | Table/Structure Field | MCAFVG - GMNGA | Total Delivered Lot Size | |
27 | Table/Structure Field | MCAFVG - IADD | Actual input date | |
28 | Table/Structure Field | MCAFVG - IEAVD | Actual finish of operation (date) | |
29 | Table/Structure Field | MCAFVG - IEDD | Actual finish: Execution (date) | |
30 | Table/Structure Field | MCAFVG - ISAVD | Actual operation start (date) | |
31 | Table/Structure Field | MCAFVG - ISDD | Actual start: Execution (date) | |
32 | Table/Structure Field | MCAFVG - I_DFZ | Actual execution time | |
33 | Table/Structure Field | MCAFVG - KABRS | Scheduled cap. requirements for the op. segment teardown | |
34 | Table/Structure Field | MCAFVG - KALID | Factory Calendar | |
35 | Table/Structure Field | MCAFVG - KBEAS | Scheduled cap. requirements for the op. segment "processing" | |
36 | Table/Structure Field | MCAFVG - KEINH | Unit of of measure for displaying capacity requirements | |
37 | Table/Structure Field | MCAFVG - KRUES | Scheduled cap. requirements for the op. segment "setup" | |
38 | Table/Structure Field | MCAFVG - LIEGZ | Wait time used for scheduling | |
39 | Table/Structure Field | MCAFVG - LIGZE | Unit of measure for wait time | |
40 | Table/Structure Field | MCAFVG - LMNGA | Total quantity confirmed | |
41 | Table/Structure Field | MCAFVG - MEINH | Unit of measure for activity | |
42 | Table/Structure Field | MCAFVG - MGVRG | Operation quantity | |
43 | Table/Structure Field | MCAFVG - RSTZE | Unit of measure for setup time | |
44 | Table/Structure Field | MCAFVG - RUEST | Scheduled setup time | |
45 | Table/Structure Field | MCAFVG - SSADD | Latest target input date | |
46 | Table/Structure Field | MCAFVG - SSAVD | Latest scheduled start: Execution (date) | |
47 | Table/Structure Field | MCAFVG - SSEDD | Latest scheduled finish: Execution (date) | |
48 | Table/Structure Field | MCAFVG - S_DFZ | Target execution time | |
49 | Table/Structure Field | MCAFVG - TRANZ | Move time used for scheduling | |
50 | Table/Structure Field | MCAFVG - TRAZE | Unit of measure for move time | |
51 | Table/Structure Field | MCAFVG - UVORN | Suboperation | |
52 | Table/Structure Field | MCAFVG - VORNR | Operation/Activity Number | |
53 | Table/Structure Field | MCAFVG - V_LIEGZ | Wait time used for scheduling | |
54 | Table/Structure Field | MCAFVG - WARTZ | Queue time used for scheduling | |
55 | Table/Structure Field | MCAFVG - WERKS | Plant | |
56 | Table/Structure Field | MCAFVG - WRTZE | Unit of measure for queue time | |
57 | Table/Structure Field | MCAFVG - XMNGA | Total scrap quantity confirmed | |
58 | Table/Structure Field | MCAFVGB - ABRUE | Scheduled teardown time | |
59 | Table/Structure Field | MCAFVGB - ARBPL | Work center | |
60 | Table/Structure Field | MCAFVGB - ARUZE | Unit of measure for teardown | |
61 | Table/Structure Field | MCAFVGB - ASVRG | Operation scrap | |
62 | Table/Structure Field | MCAFVGB - BEARZ | Scheduled processing time | |
63 | Table/Structure Field | MCAFVGB - BEAZE | Unit of measure for processing time | |
64 | Table/Structure Field | MCAFVGB - BUDAT | Posting date of last confirmation | |
65 | Table/Structure Field | MCAFVGB - DFZEH | Unit of measure for execution time | |
66 | Table/Structure Field | MCAFVGB - FSAVD | Earliest scheduled start: Execution (date) | |
67 | Table/Structure Field | MCAFVGB - FSEDD | Earliest scheduled finish: Execution (date) | |
68 | Table/Structure Field | MCAFVGB - GMNGA | Total Delivered Lot Size | |
69 | Table/Structure Field | MCAFVGB - IADD | Actual input date | |
70 | Table/Structure Field | MCAFVGB - IEAVD | Actual finish of operation (date) | |
71 | Table/Structure Field | MCAFVGB - IEDD | Actual finish: Execution (date) | |
72 | Table/Structure Field | MCAFVGB - ISAVD | Actual operation start (date) | |
73 | Table/Structure Field | MCAFVGB - ISDD | Actual start: Execution (date) | |
74 | Table/Structure Field | MCAFVGB - I_DFZ | Actual execution time | |
75 | Table/Structure Field | MCAFVGB - KABRS | Scheduled cap. requirements for the op. segment teardown | |
76 | Table/Structure Field | MCAFVGB - KALID | Factory Calendar | |
77 | Table/Structure Field | MCAFVGB - KBEAS | Scheduled cap. requirements for the op. segment "processing" | |
78 | Table/Structure Field | MCAFVGB - KEINH | Unit of of measure for displaying capacity requirements | |
79 | Table/Structure Field | MCAFVGB - KRUES | Scheduled cap. requirements for the op. segment "setup" | |
80 | Table/Structure Field | MCAFVGB - LIEGZ | Wait time used for scheduling | |
81 | Table/Structure Field | MCAFVGB - LIGZE | Unit of measure for wait time | |
82 | Table/Structure Field | MCAFVGB - LMNGA | Total quantity confirmed | |
83 | Table/Structure Field | MCAFVGB - MEINH | Unit of measure for activity | |
84 | Table/Structure Field | MCAFVGB - MGVRG | Operation quantity | |
85 | Table/Structure Field | MCAFVGB - RSTZE | Unit of measure for setup time | |
86 | Table/Structure Field | MCAFVGB - RUEST | Scheduled setup time | |
87 | Table/Structure Field | MCAFVGB - SSADD | Latest target input date | |
88 | Table/Structure Field | MCAFVGB - SSAVD | Latest scheduled start: Execution (date) | |
89 | Table/Structure Field | MCAFVGB - SSEDD | Latest scheduled finish: Execution (date) | |
90 | Table/Structure Field | MCAFVGB - SUPKZ | Statistics update indicator (post in/post out) | |
91 | Table/Structure Field | MCAFVGB - S_DFZ | Target execution time | |
92 | Table/Structure Field | MCAFVGB - TRANZ | Move time used for scheduling | |
93 | Table/Structure Field | MCAFVGB - TRAZE | Unit of measure for move time | |
94 | Table/Structure Field | MCAFVGB - UVORN | Suboperation | |
95 | Table/Structure Field | MCAFVGB - VORNR | Operation/Activity Number | |
96 | Table/Structure Field | MCAFVGB - V_LIEGZ | Wait time used for scheduling | |
97 | Table/Structure Field | MCAFVGB - WARTZ | Queue time used for scheduling | |
98 | Table/Structure Field | MCAFVGB - WERKS | Plant | |
99 | Table/Structure Field | MCAFVGB - WRTZE | Unit of measure for queue time | |
100 | Table/Structure Field | MCAFVGB - XMNGA | Total scrap quantity confirmed | |
101 | Table/Structure Field | MCCONTROL - LOGGING | Indicator for logging of LIS updates | |
102 | Table/Structure Field | MCCONTROL - VRSIO | Version number in the information structure | |
103 | Table/Structure Field | MCCONTROL - ZEITP | Event for which updating should take place | |
104 | Table/Structure Field | MCLOGGING - DATA | Statistics data: logging | |
105 | Table/Structure Field | MCLOGGING - DATE | Statistical data: logging | |
106 | Table/Structure Field | MCLOGGING - EXREQR | LIS: Exit updating because of condition | |
107 | Table/Structure Field | MCLOGGING - EXZERO | LIS: Exit because value to be updated = 0 | |
108 | Table/Structure Field | MCLOGGING - KEY | Statistical key: logging | |
109 | Table/Structure Field | MCLOGGING - UNIT | Unit/currency | |
110 | Table/Structure Field | MCSUPKZ - SUPKZ | Statistics update indicator (post in/post out) | |
111 | Table/Structure Field | MCVBAKB - SUPKZ | Statistics update indicator (post in/post out) | |
112 | Table/Structure Field | S281 - ABRUE | Scheduled teardown time | |
113 | Table/Structure Field | S281 - ANZFA | Number of production orders | |
114 | Table/Structure Field | S281 - ARBPL | Work center | |
115 | Table/Structure Field | S281 - ARUZE | Unit of measure for teardown | |
116 | Table/Structure Field | S281 - ASVRG | Operation scrap | |
117 | Table/Structure Field | S281 - AUFNR | Order Number | |
118 | Table/Structure Field | S281 - A_TAB | Deviation in scheduled output date | |
119 | Table/Structure Field | S281 - A_TABN | Date Variance of Issue, Negative | |
120 | Table/Structure Field | S281 - A_TABP | Date Variance of Issue, Positive | |
121 | Table/Structure Field | S281 - BEARZ | Scheduled processing time | |
122 | Table/Structure Field | S281 - BEAZE | Unit of measure for processing time | |
123 | Table/Structure Field | S281 - DFZEH | Unit of measure for execution time | |
124 | Table/Structure Field | S281 - FSAVD | Earliest scheduled start: Execution (date) | |
125 | Table/Structure Field | S281 - FSEDD | Earliest scheduled finish: Execution (date) | |
126 | Table/Structure Field | S281 - FTRMI | Actual release date | |
127 | Table/Structure Field | S281 - GMNGA | Total Delivered Lot Size | |
128 | Table/Structure Field | S281 - IADD | Actual input date | |
129 | Table/Structure Field | S281 - IEAVD | Actual finish of operation (date) | |
130 | Table/Structure Field | S281 - IEDD | Actual finish: Execution (date) | |
131 | Table/Structure Field | S281 - ISAVD | Actual operation start (date) | |
132 | Table/Structure Field | S281 - ISDD | Actual start: Execution (date) | |
133 | Table/Structure Field | S281 - I_DFZ | Actual execution time | |
134 | Table/Structure Field | S281 - I_DLZ | Actual lead time | |
135 | Table/Structure Field | S281 - KABRS | Scheduled cap. requirements for the op. segment teardown | |
136 | Table/Structure Field | S281 - KBEAS | Scheduled cap. requirements for the op. segment "processing" | |
137 | Table/Structure Field | S281 - KDAUF | Sales order number | |
138 | Table/Structure Field | S281 - KEINH | Unit of of measure for displaying capacity requirements | |
139 | Table/Structure Field | S281 - KRUES | Scheduled cap. requirements for the op. segment "setup" | |
140 | Table/Structure Field | S281 - LIEGZ | Wait time used for scheduling | |
141 | Table/Structure Field | S281 - LIGZE | Unit of measure for wait time | |
142 | Table/Structure Field | S281 - LMNGA | Total quantity confirmed | |
143 | Table/Structure Field | S281 - MANDT | Client | |
144 | Table/Structure Field | S281 - MATNR | Material Number | |
145 | Table/Structure Field | S281 - MCFSAVD | Earliest Scheduled Start: Execution (Date) | |
146 | Table/Structure Field | S281 - MCFSEDD | Earliest Scheduled Finish: Execution (Date) | |
147 | Table/Structure Field | S281 - MCIADD | Actual input date | |
148 | Table/Structure Field | S281 - MCIEAVD | Actual Finish of Operation (Date) | |
149 | Table/Structure Field | S281 - MCIEDD | Actual End: Execution (Date) | |
150 | Table/Structure Field | S281 - MCISAVD | Actual operation start (date) | |
151 | Table/Structure Field | S281 - MCISDD | Actual Start: Execution (Date) | |
152 | Table/Structure Field | S281 - MCSSADD | Latest target input date | |
153 | Table/Structure Field | S281 - MCSSAVD | Latest Scheduled Start: Execution (Date) | |
154 | Table/Structure Field | S281 - MCSSEDD | Latest Scheduled Finish: Execution (Date) | |
155 | Table/Structure Field | S281 - MEINH | Unit of measure for activity | |
156 | Table/Structure Field | S281 - MGVRG | Operation quantity | |
157 | Table/Structure Field | S281 - PERIV | Fiscal Year Variant | |
158 | Table/Structure Field | S281 - PWERK | Planning plant for the order | |
159 | Table/Structure Field | S281 - RSTZE | Unit of measure for setup time | |
160 | Table/Structure Field | S281 - RUEST | Scheduled setup time | |
161 | Table/Structure Field | S281 - R_TAB | Relative schedule deviation | |
162 | Table/Structure Field | S281 - R_TABN | Relative Schedule Deviation Negative | |
163 | Table/Structure Field | S281 - R_TABP | Relative Schedule Deviation Positive | |
164 | Table/Structure Field | S281 - SPBUP | Period to analyze - posting period | |
165 | Table/Structure Field | S281 - SPMON | Period to analyze - month | |
166 | Table/Structure Field | S281 - SPTAG | Period to analyze - current date | |
167 | Table/Structure Field | S281 - SPWOC | Period to analyze - week | |
168 | Table/Structure Field | S281 - SSADD | Latest target input date | |
169 | Table/Structure Field | S281 - SSAVD | Latest scheduled start: Execution (date) | |
170 | Table/Structure Field | S281 - SSEDD | Latest scheduled finish: Execution (date) | |
171 | Table/Structure Field | S281 - SSOUR | Statistic(s) origin | |
172 | Table/Structure Field | S281 - S_DFZ | Target execution time | |
173 | Table/Structure Field | S281 - S_DLZ | Target lead time | |
174 | Table/Structure Field | S281 - TRANZ | Move time used for scheduling | |
175 | Table/Structure Field | S281 - TRAZE | Unit of measure for move time | |
176 | Table/Structure Field | S281 - UVORN | Suboperation | |
177 | Table/Structure Field | S281 - VORNR | Operation/Activity Number | |
178 | Table/Structure Field | S281 - VRSIO | Version number in the information structure | |
179 | Table/Structure Field | S281 - WARTZ | Queue time used for scheduling | |
180 | Table/Structure Field | S281 - WERKS | Plant | |
181 | Table/Structure Field | S281 - WRTZE | Unit of measure for queue time | |
182 | Table/Structure Field | S281 - XMNGA | Total scrap quantity confirmed | |
183 | Table/Structure Field | S281 - Z_TAB | Deviation from scheduled input date | |
184 | Table/Structure Field | S281 - Z_TABN | Schedule Deviation Input Negative | |
185 | Table/Structure Field | S281 - Z_TABP | Schedule Deviation Input Positive | |
186 | Table/Structure Field | S281BIW1 - ABRUE | Scheduled teardown time | |
187 | Table/Structure Field | S281BIW1 - ANZFA | Number of production orders | |
188 | Table/Structure Field | S281BIW1 - ARBPL | Work center | |
189 | Table/Structure Field | S281BIW1 - ARUZE | Unit of measure for teardown | |
190 | Table/Structure Field | S281BIW1 - ASVRG | Operation scrap | |
191 | Table/Structure Field | S281BIW1 - AUFNR | Order Number | |
192 | Table/Structure Field | S281BIW1 - A_TAB | Deviation in scheduled output date | |
193 | Table/Structure Field | S281BIW1 - A_TABN | Date Variance of Issue, Negative | |
194 | Table/Structure Field | S281BIW1 - A_TABP | Date Variance of Issue, Positive | |
195 | Table/Structure Field | S281BIW1 - BEARZ | Scheduled processing time | |
196 | Table/Structure Field | S281BIW1 - BEAZE | Unit of measure for processing time | |
197 | Table/Structure Field | S281BIW1 - DFZEH | Unit of measure for execution time | |
198 | Table/Structure Field | S281BIW1 - FSAVD | Earliest scheduled start: Execution (date) | |
199 | Table/Structure Field | S281BIW1 - FSEDD | Earliest scheduled finish: Execution (date) | |
200 | Table/Structure Field | S281BIW1 - FTRMI | Actual release date | |
201 | Table/Structure Field | S281BIW1 - GMNGA | Total Delivered Lot Size | |
202 | Table/Structure Field | S281BIW1 - IADD | Actual input date | |
203 | Table/Structure Field | S281BIW1 - IEAVD | Actual finish of operation (date) | |
204 | Table/Structure Field | S281BIW1 - IEDD | Actual finish: Execution (date) | |
205 | Table/Structure Field | S281BIW1 - ISAVD | Actual operation start (date) | |
206 | Table/Structure Field | S281BIW1 - ISDD | Actual start: Execution (date) | |
207 | Table/Structure Field | S281BIW1 - I_DFZ | Actual execution time | |
208 | Table/Structure Field | S281BIW1 - I_DLZ | Actual lead time | |
209 | Table/Structure Field | S281BIW1 - KABRS | Scheduled cap. requirements for the op. segment teardown | |
210 | Table/Structure Field | S281BIW1 - KBEAS | Scheduled cap. requirements for the op. segment "processing" | |
211 | Table/Structure Field | S281BIW1 - KDAUF | Sales order number | |
212 | Table/Structure Field | S281BIW1 - KEINH | Unit of of measure for displaying capacity requirements | |
213 | Table/Structure Field | S281BIW1 - KRUES | Scheduled cap. requirements for the op. segment "setup" | |
214 | Table/Structure Field | S281BIW1 - LIEGZ | Wait time used for scheduling | |
215 | Table/Structure Field | S281BIW1 - LIGZE | Unit of measure for wait time | |
216 | Table/Structure Field | S281BIW1 - LMNGA | Total quantity confirmed | |
217 | Table/Structure Field | S281BIW1 - MATNR | Material Number | |
218 | Table/Structure Field | S281BIW1 - MCFSAVD | Earliest Scheduled Start: Execution (Date) | |
219 | Table/Structure Field | S281BIW1 - MCFSEDD | Earliest Scheduled Finish: Execution (Date) | |
220 | Table/Structure Field | S281BIW1 - MCIADD | Actual input date | |
221 | Table/Structure Field | S281BIW1 - MCIEAVD | Actual Finish of Operation (Date) | |
222 | Table/Structure Field | S281BIW1 - MCIEDD | Actual End: Execution (Date) | |
223 | Table/Structure Field | S281BIW1 - MCISAVD | Actual operation start (date) | |
224 | Table/Structure Field | S281BIW1 - MCISDD | Actual Start: Execution (Date) | |
225 | Table/Structure Field | S281BIW1 - MCSSADD | Latest target input date | |
226 | Table/Structure Field | S281BIW1 - MCSSAVD | Latest Scheduled Start: Execution (Date) | |
227 | Table/Structure Field | S281BIW1 - MCSSEDD | Latest Scheduled Finish: Execution (Date) | |
228 | Table/Structure Field | S281BIW1 - MEINH | Unit of measure for activity | |
229 | Table/Structure Field | S281BIW1 - MGVRG | Operation quantity | |
230 | Table/Structure Field | S281BIW1 - PWERK | Planning plant for the order | |
231 | Table/Structure Field | S281BIW1 - RSTZE | Unit of measure for setup time | |
232 | Table/Structure Field | S281BIW1 - RUEST | Scheduled setup time | |
233 | Table/Structure Field | S281BIW1 - R_TAB | Relative schedule deviation | |
234 | Table/Structure Field | S281BIW1 - R_TABN | Relative Schedule Deviation Negative | |
235 | Table/Structure Field | S281BIW1 - R_TABP | Relative Schedule Deviation Positive | |
236 | Table/Structure Field | S281BIW1 - SPBUP | Period to analyze - posting period | |
237 | Table/Structure Field | S281BIW1 - SPMON | Period to analyze - month | |
238 | Table/Structure Field | S281BIW1 - SPTAG | Period to analyze - current date | |
239 | Table/Structure Field | S281BIW1 - SPWOC | Period to analyze - week | |
240 | Table/Structure Field | S281BIW1 - SSADD | Latest target input date | |
241 | Table/Structure Field | S281BIW1 - SSAVD | Latest scheduled start: Execution (date) | |
242 | Table/Structure Field | S281BIW1 - SSEDD | Latest scheduled finish: Execution (date) | |
243 | Table/Structure Field | S281BIW1 - SSOUR | Statistic(s) origin | |
244 | Table/Structure Field | S281BIW1 - S_DFZ | Target execution time | |
245 | Table/Structure Field | S281BIW1 - S_DLZ | Target lead time | |
246 | Table/Structure Field | S281BIW1 - TRANZ | Move time used for scheduling | |
247 | Table/Structure Field | S281BIW1 - TRAZE | Unit of measure for move time | |
248 | Table/Structure Field | S281BIW1 - UVORN | Suboperation | |
249 | Table/Structure Field | S281BIW1 - VORNR | Operation/Activity Number | |
250 | Table/Structure Field | S281BIW1 - VRSIO | Version number in the information structure | |
251 | Table/Structure Field | S281BIW1 - WARTZ | Queue time used for scheduling | |
252 | Table/Structure Field | S281BIW1 - WERKS | Plant | |
253 | Table/Structure Field | S281BIW1 - WRTZE | Unit of measure for queue time | |
254 | Table/Structure Field | S281BIW1 - XMNGA | Total scrap quantity confirmed | |
255 | Table/Structure Field | S281BIW1 - Z_TAB | Deviation from scheduled input date | |
256 | Table/Structure Field | S281BIW1 - Z_TABN | Schedule Deviation Input Negative | |
257 | Table/Structure Field | S281BIW1 - Z_TABP | Schedule Deviation Input Positive | |
258 | Table/Structure Field | S281BIW2 - ABRUE | Scheduled teardown time | |
259 | Table/Structure Field | S281BIW2 - ANZFA | Number of production orders | |
260 | Table/Structure Field | S281BIW2 - ARBPL | Work center | |
261 | Table/Structure Field | S281BIW2 - ARUZE | Unit of measure for teardown | |
262 | Table/Structure Field | S281BIW2 - ASVRG | Operation scrap | |
263 | Table/Structure Field | S281BIW2 - AUFNR | Order Number | |
264 | Table/Structure Field | S281BIW2 - A_TAB | Deviation in scheduled output date | |
265 | Table/Structure Field | S281BIW2 - A_TABN | Date Variance of Issue, Negative | |
266 | Table/Structure Field | S281BIW2 - A_TABP | Date Variance of Issue, Positive | |
267 | Table/Structure Field | S281BIW2 - BEARZ | Scheduled processing time | |
268 | Table/Structure Field | S281BIW2 - BEAZE | Unit of measure for processing time | |
269 | Table/Structure Field | S281BIW2 - DFZEH | Unit of measure for execution time | |
270 | Table/Structure Field | S281BIW2 - FSAVD | Earliest scheduled start: Execution (date) | |
271 | Table/Structure Field | S281BIW2 - FSEDD | Earliest scheduled finish: Execution (date) | |
272 | Table/Structure Field | S281BIW2 - FTRMI | Actual release date | |
273 | Table/Structure Field | S281BIW2 - GMNGA | Total Delivered Lot Size | |
274 | Table/Structure Field | S281BIW2 - IADD | Actual input date | |
275 | Table/Structure Field | S281BIW2 - IEAVD | Actual finish of operation (date) | |
276 | Table/Structure Field | S281BIW2 - IEDD | Actual finish: Execution (date) | |
277 | Table/Structure Field | S281BIW2 - ISAVD | Actual operation start (date) | |
278 | Table/Structure Field | S281BIW2 - ISDD | Actual start: Execution (date) | |
279 | Table/Structure Field | S281BIW2 - I_DFZ | Actual execution time | |
280 | Table/Structure Field | S281BIW2 - I_DLZ | Actual lead time | |
281 | Table/Structure Field | S281BIW2 - KABRS | Scheduled cap. requirements for the op. segment teardown | |
282 | Table/Structure Field | S281BIW2 - KBEAS | Scheduled cap. requirements for the op. segment "processing" | |
283 | Table/Structure Field | S281BIW2 - KDAUF | Sales order number | |
284 | Table/Structure Field | S281BIW2 - KEINH | Unit of of measure for displaying capacity requirements | |
285 | Table/Structure Field | S281BIW2 - KRUES | Scheduled cap. requirements for the op. segment "setup" | |
286 | Table/Structure Field | S281BIW2 - LIEGZ | Wait time used for scheduling | |
287 | Table/Structure Field | S281BIW2 - LIGZE | Unit of measure for wait time | |
288 | Table/Structure Field | S281BIW2 - LMNGA | Total quantity confirmed | |
289 | Table/Structure Field | S281BIW2 - MATNR | Material Number | |
290 | Table/Structure Field | S281BIW2 - MCFSAVD | Earliest Scheduled Start: Execution (Date) | |
291 | Table/Structure Field | S281BIW2 - MCFSEDD | Earliest Scheduled Finish: Execution (Date) | |
292 | Table/Structure Field | S281BIW2 - MCIADD | Actual input date | |
293 | Table/Structure Field | S281BIW2 - MCIEAVD | Actual Finish of Operation (Date) | |
294 | Table/Structure Field | S281BIW2 - MCIEDD | Actual End: Execution (Date) | |
295 | Table/Structure Field | S281BIW2 - MCISAVD | Actual operation start (date) | |
296 | Table/Structure Field | S281BIW2 - MCISDD | Actual Start: Execution (Date) | |
297 | Table/Structure Field | S281BIW2 - MCSSADD | Latest target input date | |
298 | Table/Structure Field | S281BIW2 - MCSSAVD | Latest Scheduled Start: Execution (Date) | |
299 | Table/Structure Field | S281BIW2 - MCSSEDD | Latest Scheduled Finish: Execution (Date) | |
300 | Table/Structure Field | S281BIW2 - MEINH | Unit of measure for activity | |
301 | Table/Structure Field | S281BIW2 - MGVRG | Operation quantity | |
302 | Table/Structure Field | S281BIW2 - PWERK | Planning plant for the order | |
303 | Table/Structure Field | S281BIW2 - RSTZE | Unit of measure for setup time | |
304 | Table/Structure Field | S281BIW2 - RUEST | Scheduled setup time | |
305 | Table/Structure Field | S281BIW2 - R_TAB | Relative schedule deviation | |
306 | Table/Structure Field | S281BIW2 - R_TABN | Relative Schedule Deviation Negative | |
307 | Table/Structure Field | S281BIW2 - R_TABP | Relative Schedule Deviation Positive | |
308 | Table/Structure Field | S281BIW2 - SPBUP | Period to analyze - posting period | |
309 | Table/Structure Field | S281BIW2 - SPMON | Period to analyze - month | |
310 | Table/Structure Field | S281BIW2 - SPTAG | Period to analyze - current date | |
311 | Table/Structure Field | S281BIW2 - SPWOC | Period to analyze - week | |
312 | Table/Structure Field | S281BIW2 - SSADD | Latest target input date | |
313 | Table/Structure Field | S281BIW2 - SSAVD | Latest scheduled start: Execution (date) | |
314 | Table/Structure Field | S281BIW2 - SSEDD | Latest scheduled finish: Execution (date) | |
315 | Table/Structure Field | S281BIW2 - SSOUR | Statistic(s) origin | |
316 | Table/Structure Field | S281BIW2 - S_DFZ | Target execution time | |
317 | Table/Structure Field | S281BIW2 - S_DLZ | Target lead time | |
318 | Table/Structure Field | S281BIW2 - TRANZ | Move time used for scheduling | |
319 | Table/Structure Field | S281BIW2 - TRAZE | Unit of measure for move time | |
320 | Table/Structure Field | S281BIW2 - UVORN | Suboperation | |
321 | Table/Structure Field | S281BIW2 - VORNR | Operation/Activity Number | |
322 | Table/Structure Field | S281BIW2 - VRSIO | Version number in the information structure | |
323 | Table/Structure Field | S281BIW2 - WARTZ | Queue time used for scheduling | |
324 | Table/Structure Field | S281BIW2 - WERKS | Plant | |
325 | Table/Structure Field | S281BIW2 - WRTZE | Unit of measure for queue time | |
326 | Table/Structure Field | S281BIW2 - XMNGA | Total scrap quantity confirmed | |
327 | Table/Structure Field | S281BIW2 - Z_TAB | Deviation from scheduled input date | |
328 | Table/Structure Field | S281BIW2 - Z_TABN | Schedule Deviation Input Negative | |
329 | Table/Structure Field | S281BIW2 - Z_TABP | Schedule Deviation Input Positive | |
330 | Table/Structure Field | SCAL - FACDATE | Factory calendar: Factory date | |
331 | Table/Structure Field | SYST - MANDT | ABAP System Field: Client ID of Current User | |
332 | Table/Structure Field | SYST - TABIX | ABAP System Field: Row Index of Internal Tables | |
333 | Table/Structure Field | T001W - FABKL | Factory calendar key | |
334 | Table/Structure Field | T001W - WERKS | Plant | |
335 | Table/Structure Field | T006 - DIMID | Dimension key | |
336 | Table/Structure Field | TMC1 - GSTRU | Generated DDIC table for LIS, conditions, messages | |
337 | Table/Structure Field | TMC4 - MCINF | Name of information structure | |
338 | Table/Structure Field | TMC5 - ZEITP | Event for which updating should take place | |
339 | Table/Structure Field | TMCBIW - ACTIVE | Indicator: BIW updating active | |
340 | Table/Structure Field | TMCBIW - MCINF | Name of information structure | |
341 | Table/Structure Field | TMCBIW - STATUS | Status of BIW updating |