Table/Structure Field list used by SAP ABAP Program RCNSTRUCR (Kennzahl-Attribute)
SAP ABAP Program
RCNSTRUCR (Kennzahl-Attribute) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
![]() |
![]() |
|||
1 | ![]() |
RCJ_EV - EV_ACT_CORR1 | Budgeted cost of work performed, adjusted | |
2 | ![]() |
RCJ_EV - EV_ACT_CORR1_OC | Budgeted cost of work performed, adjusted | |
3 | ![]() |
RCJ_EV - EV_ACT_ORG1 | Budgeted cost of work performed | |
4 | ![]() |
RCJ_EV - EV_ACT_ORG1_OC | Budgeted cost of work performed | |
5 | ![]() |
RCJ_EV - EV_ACT_QUAN_CORR1 | Budgeted cost of work performed, adjusted quantity | |
6 | ![]() |
RCJ_EV - EV_ACT_QUAN_CORR1_UNIT | BCWP, Adjusted Quantity (Unit) | |
7 | ![]() |
RCJ_EV - EV_ACT_QUAN_ORG1 | Budgeted cost of work performed, quantity | |
8 | ![]() |
RCJ_EV - EV_ACT_QUAN_ORG1_UNIT | BCWP, Unit of Measure | |
9 | ![]() |
RCJ_EV - EV_COST_INDX_CORR | Cost Index Based on EV_ACT_CORR1 | |
10 | ![]() |
RCJ_EV - EV_COST_INDX_ORG | Cost Index Based on EV_ACT_ORG1 | |
11 | ![]() |
RCJ_EV - EV_COST_VAR_CORR | Cost Variance Based on EV_ACT_CORR1 | |
12 | ![]() |
RCJ_EV - EV_COST_VAR_CORR_OC | Schedule Variance Based on EV_ACT_CORR1 | |
13 | ![]() |
RCJ_EV - EV_COST_VAR_ORG | Cost Variance Based on EV_ACT_ORG1 | |
14 | ![]() |
RCJ_EV - EV_COST_VAR_ORG_OC | Cost Variance Based on EV_ACT_ORG1 | |
15 | ![]() |
RCJ_EV - EV_PLAN_ORG1 | Budgeted cost of work scheduled | |
16 | ![]() |
RCJ_EV - EV_PLAN_ORG1_OC | Budgeted cost of work scheduled | |
17 | ![]() |
RCJ_EV - EV_PLAN_QUAN_ORG1 | Budgeted cost of work scheduled, quantity | |
18 | ![]() |
RCJ_EV - EV_PLAN_QUAN_ORG1_UNIT | BCWS, Unit of Measure | |
19 | ![]() |
RCJ_EV - EV_SCHED_INDX_CORR | Date Index Based on POC_ACT_CORR_AGG1 | |
20 | ![]() |
RCJ_EV - EV_SCHED_INDX_ORG | Date Index Based on POC_ACT_ORG_AGG1 | |
21 | ![]() |
RCJ_EV - EV_SCHED_VAR_CORR | Schedule Variance Based on EV_ACT_CORR1 | |
22 | ![]() |
RCJ_EV - EV_SCHED_VAR_CORR_OC | Cost Variance Based on EV_ACT_CORR1 | |
23 | ![]() |
RCJ_EV - EV_SCHED_VAR_ORG | Schedule Variance Based on EV_ACT_ORG1 | |
24 | ![]() |
RCJ_EV - EV_SCHED_VAR_ORG_OC | Schedule Variance Based on EV_ACT_ORG1 | |
25 | ![]() |
RCJ_EV - POC_ACT_CORR_AGG1 | Adjusted aggregated actual POC | |
26 | ![]() |
RCJ_EV - POC_ACT_CORR_NAGG1 | Adjusted non-aggregated actual percentage of completion | |
27 | ![]() |
RCJ_EV - POC_ACT_ORG_AGG1 | Aggregated actual POC | |
28 | ![]() |
RCJ_EV - POC_ACT_ORG_NAGG1 | Non-aggregated actual percentage of completion | |
29 | ![]() |
RCJ_EV - POC_PLAN_ORG_AGG1 | Aggregate planned percentage of completion | |
30 | ![]() |
RCJ_EV - POC_PLAN_ORG_NAGG1 | Non-aggregated planned percentage of completion | |
31 | ![]() |
RCJ_EVDEGREE - POC_ACT_CORR_AGG1 | Adjusted aggregated actual POC | |
32 | ![]() |
RCJ_EVDEGREE - POC_ACT_CORR_NAGG1 | Adjusted non-aggregated actual percentage of completion | |
33 | ![]() |
RCJ_EVDEGREE - POC_ACT_ORG_AGG1 | Aggregated actual POC | |
34 | ![]() |
RCJ_EVDEGREE - POC_ACT_ORG_NAGG1 | Non-aggregated actual percentage of completion | |
35 | ![]() |
RCJ_EVDEGREE - POC_PLAN_ORG_AGG1 | Aggregate planned percentage of completion | |
36 | ![]() |
RCJ_EVDEGREE - POC_PLAN_ORG_NAGG1 | Non-aggregated planned percentage of completion | |
37 | ![]() |
RCJ_EVQUANT - EV_ACT_QUAN_CORR1 | Budgeted cost of work performed, adjusted quantity | |
38 | ![]() |
RCJ_EVQUANT - EV_ACT_QUAN_CORR1_UNIT | BCWP, Adjusted Quantity (Unit) | |
39 | ![]() |
RCJ_EVQUANT - EV_ACT_QUAN_ORG1 | Budgeted cost of work performed, quantity | |
40 | ![]() |
RCJ_EVQUANT - EV_ACT_QUAN_ORG1_UNIT | BCWP, Unit of Measure | |
41 | ![]() |
RCJ_EVQUANT - EV_PLAN_QUAN_ORG1 | Budgeted cost of work scheduled, quantity | |
42 | ![]() |
RCJ_EVQUANT - EV_PLAN_QUAN_ORG1_UNIT | BCWS, Unit of Measure | |
43 | ![]() |
RCJ_EVVALUE - EV_ACT_CORR1 | Budgeted cost of work performed, adjusted | |
44 | ![]() |
RCJ_EVVALUE - EV_ACT_ORG1 | Budgeted cost of work performed | |
45 | ![]() |
RCJ_EVVALUE - EV_PLAN_ORG1 | Budgeted cost of work scheduled | |
46 | ![]() |
RCJ_EVVALUE_OC - EV_ACT_CORR1_OC | Budgeted cost of work performed, adjusted | |
47 | ![]() |
RCJ_EVVALUE_OC - EV_ACT_ORG1_OC | Budgeted cost of work performed | |
48 | ![]() |
RCJ_EVVALUE_OC - EV_PLAN_ORG1_OC | Budgeted cost of work scheduled | |
49 | ![]() |
RCJ_EV_APPEND - EV_ACT_CORR1_OC | Budgeted cost of work performed, adjusted | |
50 | ![]() |
RCJ_EV_APPEND - EV_ACT_ORG1_OC | Budgeted cost of work performed | |
51 | ![]() |
RCJ_EV_APPEND - EV_COST_VAR_CORR_OC | Schedule Variance Based on EV_ACT_CORR1 | |
52 | ![]() |
RCJ_EV_APPEND - EV_COST_VAR_ORG_OC | Cost Variance Based on EV_ACT_ORG1 | |
53 | ![]() |
RCJ_EV_APPEND - EV_PLAN_ORG1_OC | Budgeted cost of work scheduled | |
54 | ![]() |
RCJ_EV_APPEND - EV_SCHED_VAR_CORR_OC | Cost Variance Based on EV_ACT_CORR1 | |
55 | ![]() |
RCJ_EV_APPEND - EV_SCHED_VAR_ORG_OC | Schedule Variance Based on EV_ACT_ORG1 | |
56 | ![]() |
RCJ_EV_OC - EV_ACT_CORR1_OC | Budgeted cost of work performed, adjusted | |
57 | ![]() |
RCJ_EV_OC - EV_ACT_ORG1_OC | Budgeted cost of work performed | |
58 | ![]() |
RCJ_EV_OC - EV_COST_VAR_CORR_OC | Schedule Variance Based on EV_ACT_CORR1 | |
59 | ![]() |
RCJ_EV_OC - EV_COST_VAR_ORG_OC | Cost Variance Based on EV_ACT_ORG1 | |
60 | ![]() |
RCJ_EV_OC - EV_PLAN_ORG1_OC | Budgeted cost of work scheduled | |
61 | ![]() |
RCJ_EV_OC - EV_SCHED_VAR_CORR_OC | Cost Variance Based on EV_ACT_CORR1 | |
62 | ![]() |
RCJ_EV_OC - EV_SCHED_VAR_ORG_OC | Schedule Variance Based on EV_ACT_ORG1 | |
63 | ![]() |
RCJ_RPSCO_LIS - AUFERLPLAN | Current order revenue plan | |
64 | ![]() |
RCJ_RPSCO_LIS - AUFERLPLAN_OC | Current Order Revenue Plan in Object Currency | |
65 | ![]() |
RCJ_RPSCO_LIS - AUFERLPLN2 | Order revenue plan (version 2) | |
66 | ![]() |
RCJ_RPSCO_LIS - AUFERLPLN2_OC | Order Revenue Plan (Version 2) in Object Currency | |
67 | ![]() |
RCJ_RPSCO_LIS - AUFKSTPLAN | Current order cost plan | |
68 | ![]() |
RCJ_RPSCO_LIS - AUFKSTPLAN_OC | Current Order Cost Plan in Object Currency | |
69 | ![]() |
RCJ_RPSCO_LIS - AUFKSTPLN2 | Order cost plan (version 2) | |
70 | ![]() |
RCJ_RPSCO_LIS - AUFKSTPLN2_OC | Order Cost Plan (Version 2) in Object Currency | |
71 | ![]() |
RCJ_RPSCO_LIS - AUFTRANF | Residual order plan | |
72 | ![]() |
RCJ_RPSCO_LIS - AUFTRANF_OC | Residual Order Plan in Object Currency | |
73 | ![]() |
RCJ_RPSCO_LIS - BUDGET | Budget of a Measure (App. Request Variant Was Replaced) | |
74 | ![]() |
RCJ_RPSCO_LIS - BUDGET_OC | Appropriation Budget (Appr.Request Variant Replaced) in OC | |
75 | ![]() |
RCJ_RPSCO_LIS - DEBFINPLN | Current cash budget, debit side | |
76 | ![]() |
RCJ_RPSCO_LIS - DEBFINPLN_OC | Current Debit Side Cash Budget in Object Currency | |
77 | ![]() |
RCJ_RPSCO_LIS - DZHLNG | Total debit side payments (down payments and payments) | |
78 | ![]() |
RCJ_RPSCO_LIS - DZHLNG_OC | Total Customer Payments (Down Payments and Payments) OC | |
79 | ![]() |
RCJ_RPSCO_LIS - FESTPROBL | Fixed price commitment | |
80 | ![]() |
RCJ_RPSCO_LIS - FESTPROBL_OC | Fixed Price Commitment in Object Currency | |
81 | ![]() |
RCJ_RPSCO_LIS - FREIGABE | Release | |
82 | ![]() |
RCJ_RPSCO_LIS - FREIGABE_OC | Release in Object Currency | |
83 | ![]() |
RCJ_RPSCO_LIS - ISTERLOESE | Actual revenues | |
84 | ![]() |
RCJ_RPSCO_LIS - ISTERLOESE_OC | Actual Revenues in Object Currency | |
85 | ![]() |
RCJ_RPSCO_LIS - ISTKOSTEN | Actual costs | |
86 | ![]() |
RCJ_RPSCO_LIS - ISTKOSTEN_OC | Act. Costs in Object Currency | |
87 | ![]() |
RCJ_RPSCO_LIS - KREDFINPLN | Current financial budget, credit side | |
88 | ![]() |
RCJ_RPSCO_LIS - KREDFINPLN_OC | Current Credit Side Cash Budget in Object Currency | |
89 | ![]() |
RCJ_RPSCO_LIS - KSTOBLGES | Total cost commitment | |
90 | ![]() |
RCJ_RPSCO_LIS - KSTOBLGES_OC | Total Cost Commitment in Object Currency | |
91 | ![]() |
RCJ_RPSCO_LIS - KZHLNG | Total credit side payments (down payments and payments) | |
92 | ![]() |
RCJ_RPSCO_LIS - KZHLNG_OC | Total Vendor Payments (Down Payments and Payments) OC | |
93 | ![]() |
RCJ_RPSCO_LIS - PROERLPLAN | Current project revenue plan | |
94 | ![]() |
RCJ_RPSCO_LIS - PROERLPLAN_OC | Current Project Revenue Plan in Object Currency | |
95 | ![]() |
RCJ_RPSCO_LIS - PROERLPLN2 | Project revenue plan (version 2) | |
96 | ![]() |
RCJ_RPSCO_LIS - PROERLPLN2_OC | Project Revenue Plan (Version 2) in Object Currency | |
97 | ![]() |
RCJ_RPSCO_LIS - PROKSTPLAN | Current project cost plan | |
98 | ![]() |
RCJ_RPSCO_LIS - PROKSTPLAN_OC | Current Project Cost Plan in Object Currency | |
99 | ![]() |
RCJ_RPSCO_LIS - PROKSTPLN2 | Project cost plan (version 2) | |
100 | ![]() |
RCJ_RPSCO_LIS - PROKSTPLN2_OC | Project Cost Plan (Version 2) in Object Currency | |
101 | ![]() |
RCJ_RPSCO_LIS_APPEND - AUFERLPLAN_OC | Current Order Revenue Plan in Object Currency | |
102 | ![]() |
RCJ_RPSCO_LIS_APPEND - AUFERLPLN2_OC | Order Revenue Plan (Version 2) in Object Currency | |
103 | ![]() |
RCJ_RPSCO_LIS_APPEND - AUFKSTPLAN_OC | Current Order Cost Plan in Object Currency | |
104 | ![]() |
RCJ_RPSCO_LIS_APPEND - AUFKSTPLN2_OC | Order Cost Plan (Version 2) in Object Currency | |
105 | ![]() |
RCJ_RPSCO_LIS_APPEND - AUFTRANF_OC | Residual Order Plan in Object Currency | |
106 | ![]() |
RCJ_RPSCO_LIS_APPEND - BUDGET_OC | Appropriation Budget (Appr.Request Variant Replaced) in OC | |
107 | ![]() |
RCJ_RPSCO_LIS_APPEND - DEBFINPLN_OC | Current Debit Side Cash Budget in Object Currency | |
108 | ![]() |
RCJ_RPSCO_LIS_APPEND - DZHLNG_OC | Total Customer Payments (Down Payments and Payments) OC | |
109 | ![]() |
RCJ_RPSCO_LIS_APPEND - FESTPROBL_OC | Fixed Price Commitment in Object Currency | |
110 | ![]() |
RCJ_RPSCO_LIS_APPEND - FREIGABE_OC | Release in Object Currency | |
111 | ![]() |
RCJ_RPSCO_LIS_APPEND - ISTERLOESE_OC | Actual Revenues in Object Currency | |
112 | ![]() |
RCJ_RPSCO_LIS_APPEND - ISTKOSTEN_OC | Act. Costs in Object Currency | |
113 | ![]() |
RCJ_RPSCO_LIS_APPEND - KREDFINPLN_OC | Current Credit Side Cash Budget in Object Currency | |
114 | ![]() |
RCJ_RPSCO_LIS_APPEND - KSTOBLGES_OC | Total Cost Commitment in Object Currency | |
115 | ![]() |
RCJ_RPSCO_LIS_APPEND - KZHLNG_OC | Total Vendor Payments (Down Payments and Payments) OC | |
116 | ![]() |
RCJ_RPSCO_LIS_APPEND - PROERLPLAN_OC | Current Project Revenue Plan in Object Currency | |
117 | ![]() |
RCJ_RPSCO_LIS_APPEND - PROERLPLN2_OC | Project Revenue Plan (Version 2) in Object Currency | |
118 | ![]() |
RCJ_RPSCO_LIS_APPEND - PROKSTPLAN_OC | Current Project Cost Plan in Object Currency | |
119 | ![]() |
RCJ_RPSCO_LIS_APPEND - PROKSTPLN2_OC | Project Cost Plan (Version 2) in Object Currency | |
120 | ![]() |
RCJ_RPSCO_LIS_OC - AUFERLPLAN_OC | Current Order Revenue Plan in Object Currency | |
121 | ![]() |
RCJ_RPSCO_LIS_OC - AUFERLPLN2_OC | Order Revenue Plan (Version 2) in Object Currency | |
122 | ![]() |
RCJ_RPSCO_LIS_OC - AUFKSTPLAN_OC | Current Order Cost Plan in Object Currency | |
123 | ![]() |
RCJ_RPSCO_LIS_OC - AUFKSTPLN2_OC | Order Cost Plan (Version 2) in Object Currency | |
124 | ![]() |
RCJ_RPSCO_LIS_OC - AUFTRANF_OC | Residual Order Plan in Object Currency | |
125 | ![]() |
RCJ_RPSCO_LIS_OC - BUDGET_OC | Appropriation Budget (Appr.Request Variant Replaced) in OC | |
126 | ![]() |
RCJ_RPSCO_LIS_OC - DEBFINPLN_OC | Current Debit Side Cash Budget in Object Currency | |
127 | ![]() |
RCJ_RPSCO_LIS_OC - DZHLNG_OC | Total Customer Payments (Down Payments and Payments) OC | |
128 | ![]() |
RCJ_RPSCO_LIS_OC - FESTPROBL_OC | Fixed Price Commitment in Object Currency | |
129 | ![]() |
RCJ_RPSCO_LIS_OC - FREIGABE_OC | Release in Object Currency | |
130 | ![]() |
RCJ_RPSCO_LIS_OC - ISTERLOESE_OC | Actual Revenues in Object Currency | |
131 | ![]() |
RCJ_RPSCO_LIS_OC - ISTKOSTEN_OC | Act. Costs in Object Currency | |
132 | ![]() |
RCJ_RPSCO_LIS_OC - KREDFINPLN_OC | Current Credit Side Cash Budget in Object Currency | |
133 | ![]() |
RCJ_RPSCO_LIS_OC - KSTOBLGES_OC | Total Cost Commitment in Object Currency | |
134 | ![]() |
RCJ_RPSCO_LIS_OC - KZHLNG_OC | Total Vendor Payments (Down Payments and Payments) OC | |
135 | ![]() |
RCJ_RPSCO_LIS_OC - PROERLPLAN_OC | Current Project Revenue Plan in Object Currency | |
136 | ![]() |
RCJ_RPSCO_LIS_OC - PROERLPLN2_OC | Project Revenue Plan (Version 2) in Object Currency | |
137 | ![]() |
RCJ_RPSCO_LIS_OC - PROKSTPLAN_OC | Current Project Cost Plan in Object Currency | |
138 | ![]() |
RCJ_RPSCO_LIS_OC - PROKSTPLN2_OC | Project Cost Plan (Version 2) in Object Currency | |
139 | ![]() |
RPSCO_LISC - AUFERLPLAN | Current order revenue plan | |
140 | ![]() |
RPSCO_LISC - AUFERLPLAN_OC | Current Order Revenue Plan in Object Currency | |
141 | ![]() |
RPSCO_LISC - AUFERLPLN2 | Order revenue plan (version 2) | |
142 | ![]() |
RPSCO_LISC - AUFERLPLN2_OC | Order Revenue Plan (Version 2) in Object Currency | |
143 | ![]() |
RPSCO_LISC - AUFKSTPLAN | Current order cost plan | |
144 | ![]() |
RPSCO_LISC - AUFKSTPLAN_OC | Current Order Cost Plan in Object Currency | |
145 | ![]() |
RPSCO_LISC - AUFKSTPLN2 | Order cost plan (version 2) | |
146 | ![]() |
RPSCO_LISC - AUFKSTPLN2_OC | Order Cost Plan (Version 2) in Object Currency | |
147 | ![]() |
RPSCO_LISC - AUFTRANF | Residual order plan | |
148 | ![]() |
RPSCO_LISC - AUFTRANF_OC | Residual Order Plan in Object Currency | |
149 | ![]() |
RPSCO_LISC - BUDGET | Budget of a Measure (App. Request Variant Was Replaced) | |
150 | ![]() |
RPSCO_LISC - BUDGET_OC | Appropriation Budget (Appr.Request Variant Replaced) in OC | |
151 | ![]() |
RPSCO_LISC - DEBFINPLN | Current cash budget, debit side | |
152 | ![]() |
RPSCO_LISC - DEBFINPLN_OC | Current Debit Side Cash Budget in Object Currency | |
153 | ![]() |
RPSCO_LISC - DZHLNG | Total debit side payments (down payments and payments) | |
154 | ![]() |
RPSCO_LISC - DZHLNG_OC | Total Customer Payments (Down Payments and Payments) OC | |
155 | ![]() |
RPSCO_LISC - EV_ACT_CORR1 | Budgeted cost of work performed, adjusted | |
156 | ![]() |
RPSCO_LISC - EV_ACT_CORR1_OC | Budgeted cost of work performed, adjusted | |
157 | ![]() |
RPSCO_LISC - EV_ACT_ORG1 | Budgeted cost of work performed | |
158 | ![]() |
RPSCO_LISC - EV_ACT_ORG1_OC | Budgeted cost of work performed | |
159 | ![]() |
RPSCO_LISC - EV_ACT_QUAN_CORR1 | Budgeted cost of work performed, adjusted quantity | |
160 | ![]() |
RPSCO_LISC - EV_ACT_QUAN_CORR1_UNIT | BCWP, Adjusted Quantity (Unit) | |
161 | ![]() |
RPSCO_LISC - EV_ACT_QUAN_ORG1 | Budgeted cost of work performed, quantity | |
162 | ![]() |
RPSCO_LISC - EV_ACT_QUAN_ORG1_UNIT | BCWP, Unit of Measure | |
163 | ![]() |
RPSCO_LISC - EV_COST_INDX_CORR | Cost Index Based on EV_ACT_CORR1 | |
164 | ![]() |
RPSCO_LISC - EV_COST_INDX_ORG | Cost Index Based on EV_ACT_ORG1 | |
165 | ![]() |
RPSCO_LISC - EV_COST_VAR_CORR | Cost Variance Based on EV_ACT_CORR1 | |
166 | ![]() |
RPSCO_LISC - EV_COST_VAR_CORR_OC | Schedule Variance Based on EV_ACT_CORR1 | |
167 | ![]() |
RPSCO_LISC - EV_COST_VAR_ORG | Cost Variance Based on EV_ACT_ORG1 | |
168 | ![]() |
RPSCO_LISC - EV_COST_VAR_ORG_OC | Cost Variance Based on EV_ACT_ORG1 | |
169 | ![]() |
RPSCO_LISC - EV_PLAN_ORG1 | Budgeted cost of work scheduled | |
170 | ![]() |
RPSCO_LISC - EV_PLAN_ORG1_OC | Budgeted cost of work scheduled | |
171 | ![]() |
RPSCO_LISC - EV_PLAN_QUAN_ORG1 | Budgeted cost of work scheduled, quantity | |
172 | ![]() |
RPSCO_LISC - EV_PLAN_QUAN_ORG1_UNIT | BCWS, Unit of Measure | |
173 | ![]() |
RPSCO_LISC - EV_SCHED_INDX_CORR | Date Index Based on POC_ACT_CORR_AGG1 | |
174 | ![]() |
RPSCO_LISC - EV_SCHED_INDX_ORG | Date Index Based on POC_ACT_ORG_AGG1 | |
175 | ![]() |
RPSCO_LISC - EV_SCHED_VAR_CORR | Schedule Variance Based on EV_ACT_CORR1 | |
176 | ![]() |
RPSCO_LISC - EV_SCHED_VAR_CORR_OC | Cost Variance Based on EV_ACT_CORR1 | |
177 | ![]() |
RPSCO_LISC - EV_SCHED_VAR_ORG | Schedule Variance Based on EV_ACT_ORG1 | |
178 | ![]() |
RPSCO_LISC - EV_SCHED_VAR_ORG_OC | Schedule Variance Based on EV_ACT_ORG1 | |
179 | ![]() |
RPSCO_LISC - FESTPROBL | Fixed price commitment | |
180 | ![]() |
RPSCO_LISC - FESTPROBL_OC | Fixed Price Commitment in Object Currency | |
181 | ![]() |
RPSCO_LISC - FREIGABE | Release | |
182 | ![]() |
RPSCO_LISC - FREIGABE_OC | Release in Object Currency | |
183 | ![]() |
RPSCO_LISC - ISTERLOESE | Actual revenues | |
184 | ![]() |
RPSCO_LISC - ISTERLOESE_OC | Actual Revenues in Object Currency | |
185 | ![]() |
RPSCO_LISC - ISTKOSTEN | Actual costs | |
186 | ![]() |
RPSCO_LISC - ISTKOSTEN_OC | Act. Costs in Object Currency | |
187 | ![]() |
RPSCO_LISC - KREDFINPLN | Current financial budget, credit side | |
188 | ![]() |
RPSCO_LISC - KREDFINPLN_OC | Current Credit Side Cash Budget in Object Currency | |
189 | ![]() |
RPSCO_LISC - KSTOBLGES | Total cost commitment | |
190 | ![]() |
RPSCO_LISC - KSTOBLGES_OC | Total Cost Commitment in Object Currency | |
191 | ![]() |
RPSCO_LISC - KZHLNG | Total credit side payments (down payments and payments) | |
192 | ![]() |
RPSCO_LISC - KZHLNG_OC | Total Vendor Payments (Down Payments and Payments) OC | |
193 | ![]() |
RPSCO_LISC - POC_ACT_CORR_AGG1 | Adjusted aggregated actual POC | |
194 | ![]() |
RPSCO_LISC - POC_ACT_CORR_NAGG1 | Adjusted non-aggregated actual percentage of completion | |
195 | ![]() |
RPSCO_LISC - POC_ACT_ORG_AGG1 | Aggregated actual POC | |
196 | ![]() |
RPSCO_LISC - POC_ACT_ORG_NAGG1 | Non-aggregated actual percentage of completion | |
197 | ![]() |
RPSCO_LISC - POC_PLAN_ORG_AGG1 | Aggregate planned percentage of completion | |
198 | ![]() |
RPSCO_LISC - POC_PLAN_ORG_NAGG1 | Non-aggregated planned percentage of completion | |
199 | ![]() |
RPSCO_LISC - PROERLPLAN | Current project revenue plan | |
200 | ![]() |
RPSCO_LISC - PROERLPLAN_OC | Current Project Revenue Plan in Object Currency | |
201 | ![]() |
RPSCO_LISC - PROERLPLN2 | Project revenue plan (version 2) | |
202 | ![]() |
RPSCO_LISC - PROERLPLN2_OC | Project Revenue Plan (Version 2) in Object Currency | |
203 | ![]() |
RPSCO_LISC - PROKSTPLAN | Current project cost plan | |
204 | ![]() |
RPSCO_LISC - PROKSTPLAN_OC | Current Project Cost Plan in Object Currency | |
205 | ![]() |
RPSCO_LISC - PROKSTPLN2 | Project cost plan (version 2) | |
206 | ![]() |
RPSCO_LISC - PROKSTPLN2_OC | Project Cost Plan (Version 2) in Object Currency | |
207 | ![]() |
STRUCR - ABARBA | Percent of completion for work | |
208 | ![]() |
STRUCR - ABARBD | Processing % of duration | |
209 | ![]() |
STRUCR - AENNR | Change Number | |
210 | ![]() |
STRUCR - ARBPL | Work center | |
211 | ![]() |
STRUCR - ARNUMMER | Archiving Session Number | |
212 | ![]() |
STRUCR - AUFERLPLAN | Current order revenue plan | |
213 | ![]() |
STRUCR - AUFERLPLAN_OC | Current Order Revenue Plan in Object Currency | |
214 | ![]() |
STRUCR - AUFERLPLN2 | Order revenue plan (version 2) | |
215 | ![]() |
STRUCR - AUFERLPLN2_OC | Order Revenue Plan (Version 2) in Object Currency | |
216 | ![]() |
STRUCR - AUFKSTPLAN | Current order cost plan | |
217 | ![]() |
STRUCR - AUFKSTPLAN_OC | Current Order Cost Plan in Object Currency | |
218 | ![]() |
STRUCR - AUFKSTPLN2 | Order cost plan (version 2) | |
219 | ![]() |
STRUCR - AUFKSTPLN2_OC | Order Cost Plan (Version 2) in Object Currency | |
220 | ![]() |
STRUCR - AUFTRANF | Residual order plan | |
221 | ![]() |
STRUCR - AUFTRANF_OC | Residual Order Plan in Object Currency | |
222 | ![]() |
STRUCR - BUDGET | Budget of a Measure (App. Request Variant Was Replaced) | |
223 | ![]() |
STRUCR - BUDGET_OC | Appropriation Budget (Appr.Request Variant Replaced) in OC | |
224 | ![]() |
STRUCR - BUKRS | Company Code | |
225 | ![]() |
STRUCR - DATFS | Earliest start date | |
226 | ![]() |
STRUCR - DATSE | Latest finish date | |
227 | ![]() |
STRUCR - DEBFINPLN | Current cash budget, debit side | |
228 | ![]() |
STRUCR - DEBFINPLN_OC | Current Debit Side Cash Budget in Object Currency | |
229 | ![]() |
STRUCR - DZHLNG | Total debit side payments (down payments and payments) | |
230 | ![]() |
STRUCR - DZHLNG_OC | Total Customer Payments (Down Payments and Payments) OC | |
231 | ![]() |
STRUCR - EARBEH | Unit for work | |
232 | ![]() |
STRUCR - EARBEI | Work | |
233 | ![]() |
STRUCR - ECKEN | Finish date (from basic dates) | |
234 | ![]() |
STRUCR - ECKST | Basic start date | |
235 | ![]() |
STRUCR - EDAUEH | Actual duration unit | |
236 | ![]() |
STRUCR - EDAUER | Duration | |
237 | ![]() |
STRUCR - EVGEW | Aggregation weight for POC (PS progress) | |
238 | ![]() |
STRUCR - EVMET_A1 | Measurement method in PS progress analysis (actual) | |
239 | ![]() |
STRUCR - EVMET_P1 | Measurement method for PS progress analysis (plan) | |
240 | ![]() |
STRUCR - EV_ACT_CORR1 | Budgeted cost of work performed, adjusted | |
241 | ![]() |
STRUCR - EV_ACT_CORR1_OC | Budgeted cost of work performed, adjusted | |
242 | ![]() |
STRUCR - EV_ACT_ORG1 | Budgeted cost of work performed | |
243 | ![]() |
STRUCR - EV_ACT_ORG1_OC | Budgeted cost of work performed | |
244 | ![]() |
STRUCR - EV_ACT_QUAN_CORR1 | Budgeted cost of work performed, adjusted quantity | |
245 | ![]() |
STRUCR - EV_ACT_QUAN_CORR1_UNIT | BCWP, Adjusted Quantity (Unit) | |
246 | ![]() |
STRUCR - EV_ACT_QUAN_ORG1 | Budgeted cost of work performed, quantity | |
247 | ![]() |
STRUCR - EV_ACT_QUAN_ORG1_UNIT | BCWP, Unit of Measure | |
248 | ![]() |
STRUCR - EV_COST_INDX_CORR | Cost Index Based on EV_ACT_CORR1 | |
249 | ![]() |
STRUCR - EV_COST_INDX_ORG | Cost Index Based on EV_ACT_ORG1 | |
250 | ![]() |
STRUCR - EV_COST_VAR_CORR | Cost Variance Based on EV_ACT_CORR1 | |
251 | ![]() |
STRUCR - EV_COST_VAR_CORR_OC | Schedule Variance Based on EV_ACT_CORR1 | |
252 | ![]() |
STRUCR - EV_COST_VAR_ORG | Cost Variance Based on EV_ACT_ORG1 | |
253 | ![]() |
STRUCR - EV_COST_VAR_ORG_OC | Cost Variance Based on EV_ACT_ORG1 | |
254 | ![]() |
STRUCR - EV_PLAN_ORG1 | Budgeted cost of work scheduled | |
255 | ![]() |
STRUCR - EV_PLAN_ORG1_OC | Budgeted cost of work scheduled | |
256 | ![]() |
STRUCR - EV_PLAN_QUAN_ORG1 | Budgeted cost of work scheduled, quantity | |
257 | ![]() |
STRUCR - EV_PLAN_QUAN_ORG1_UNIT | BCWS, Unit of Measure | |
258 | ![]() |
STRUCR - EV_SCHED_INDX_CORR | Date Index Based on POC_ACT_CORR_AGG1 | |
259 | ![]() |
STRUCR - EV_SCHED_INDX_ORG | Date Index Based on POC_ACT_ORG_AGG1 | |
260 | ![]() |
STRUCR - EV_SCHED_VAR_CORR | Schedule Variance Based on EV_ACT_CORR1 | |
261 | ![]() |
STRUCR - EV_SCHED_VAR_CORR_OC | Cost Variance Based on EV_ACT_CORR1 | |
262 | ![]() |
STRUCR - EV_SCHED_VAR_ORG | Schedule Variance Based on EV_ACT_ORG1 | |
263 | ![]() |
STRUCR - EV_SCHED_VAR_ORG_OC | Schedule Variance Based on EV_ACT_ORG1 | |
264 | ![]() |
STRUCR - FESTPROBL | Fixed price commitment | |
265 | ![]() |
STRUCR - FESTPROBL_OC | Fixed Price Commitment in Object Currency | |
266 | ![]() |
STRUCR - FREIGABE | Release | |
267 | ![]() |
STRUCR - FREIGABE_OC | Release in Object Currency | |
268 | ![]() |
STRUCR - FRUEHER | Actual start is before earliest scheduled start | |
269 | ![]() |
STRUCR - GSBER | Business Area | |
270 | ![]() |
STRUCR - IARBEH | Unit for work | |
271 | ![]() |
STRUCR - IARBEI | Actual work | |
272 | ![]() |
STRUCR - IDAUEH | Actual duration unit | |
273 | ![]() |
STRUCR - IDAUER | Actual duration | |
274 | ![]() |
STRUCR - ISTEN | Actual finish date | |
275 | ![]() |
STRUCR - ISTERLOESE | Actual revenues | |
276 | ![]() |
STRUCR - ISTERLOESE_OC | Actual Revenues in Object Currency | |
277 | ![]() |
STRUCR - ISTKOSTEN | Actual costs | |
278 | ![]() |
STRUCR - ISTKOSTEN_OC | Act. Costs in Object Currency | |
279 | ![]() |
STRUCR - ISTST | Actual start date | |
280 | ![]() |
STRUCR - KALID | Factory Calendar | |
281 | ![]() |
STRUCR - KOKRS | Controlling Area | |
282 | ![]() |
STRUCR - KREDFINPLN | Current financial budget, credit side | |
283 | ![]() |
STRUCR - KREDFINPLN_OC | Current Credit Side Cash Budget in Object Currency | |
284 | ![]() |
STRUCR - KSTOBLGES | Total cost commitment | |
285 | ![]() |
STRUCR - KSTOBLGES_OC | Total Cost Commitment in Object Currency | |
286 | ![]() |
STRUCR - KURZTEXT | Short text/description of the object | |
287 | ![]() |
STRUCR - KZHLNG | Total credit side payments (down payments and payments) | |
288 | ![]() |
STRUCR - KZHLNG_OC | Total Vendor Payments (Down Payments and Payments) OC | |
289 | ![]() |
STRUCR - MEINH | Unit of Measure for Display | |
290 | ![]() |
STRUCR - OBJEKTID | ID/Object key | |
291 | ![]() |
STRUCR - OBJEKTTYP | Object Type Text | |
292 | ![]() |
STRUCR - OWAERS | Object currency for network activity | |
293 | ![]() |
STRUCR - PARBEH | Unit for work | |
294 | ![]() |
STRUCR - PARBEI | Forecast work | |
295 | ![]() |
STRUCR - PDAUEH | Actual duration unit | |
296 | ![]() |
STRUCR - PDAUER | Forecast duration | |
297 | ![]() |
STRUCR - POC_ACT_CORR_AGG1 | Adjusted aggregated actual POC | |
298 | ![]() |
STRUCR - POC_ACT_CORR_NAGG1 | Adjusted non-aggregated actual percentage of completion | |
299 | ![]() |
STRUCR - POC_ACT_ORG_AGG1 | Aggregated actual POC | |
300 | ![]() |
STRUCR - POC_ACT_ORG_NAGG1 | Non-aggregated actual percentage of completion | |
301 | ![]() |
STRUCR - POC_PLAN_ORG_AGG1 | Aggregate planned percentage of completion | |
302 | ![]() |
STRUCR - POC_PLAN_ORG_NAGG1 | Non-aggregated planned percentage of completion | |
303 | ![]() |
STRUCR - PROERLPLAN | Current project revenue plan | |
304 | ![]() |
STRUCR - PROERLPLAN_OC | Current Project Revenue Plan in Object Currency | |
305 | ![]() |
STRUCR - PROERLPLN2 | Project revenue plan (version 2) | |
306 | ![]() |
STRUCR - PROERLPLN2_OC | Project Revenue Plan (Version 2) in Object Currency | |
307 | ![]() |
STRUCR - PROGEN | Forecast finish date | |
308 | ![]() |
STRUCR - PROGST | Forecast start date | |
309 | ![]() |
STRUCR - PROKSTPLAN | Current project cost plan | |
310 | ![]() |
STRUCR - PROKSTPLAN_OC | Current Project Cost Plan in Object Currency | |
311 | ![]() |
STRUCR - PROKSTPLN2 | Project cost plan (version 2) | |
312 | ![]() |
STRUCR - PROKSTPLN2_OC | Project Cost Plan (Version 2) in Object Currency | |
313 | ![]() |
STRUCR - PSPRI | Priority | |
314 | ![]() |
STRUCR - PUFFP | Free float (from forecast) | |
315 | ![]() |
STRUCR - PUFFR | Free float | |
316 | ![]() |
STRUCR - PUFGP | Total float (from forecast) | |
317 | ![]() |
STRUCR - PUFGS | Total float | |
318 | ![]() |
STRUCR - RARBEH | Unit for work | |
319 | ![]() |
STRUCR - RARBEI | Remaining work | |
320 | ![]() |
STRUCR - RDAUEH | Actual duration unit | |
321 | ![]() |
STRUCR - RDAUER | Remaining duration | |
322 | ![]() |
STRUCR - SLWID | Key word ID for user-defined fields | |
323 | ![]() |
STRUCR - SPAETER | Actual Finish/Planned Finish After Latest Scheduled Finish | |
324 | ![]() |
STRUCR - STATXT | Edited status text | |
325 | ![]() |
STRUCR - TEENFR | Earliest scheduled finish (from basic dates) | |
326 | ![]() |
STRUCR - TEENSP | Latest scheduled finish (from basic dates) | |
327 | ![]() |
STRUCR - TESTFR | Earliest scheduled start (from basic dates) | |
328 | ![]() |
STRUCR - TESTSP | Latest scheduled start (from basic dates) | |
329 | ![]() |
STRUCR - TPENFR | Earliest scheduled finish (from forecast dates) | |
330 | ![]() |
STRUCR - TPENSP | Latest scheduled finish (from forecast dates) | |
331 | ![]() |
STRUCR - TPSTFR | Earliest scheduled start (from forecast dates) | |
332 | ![]() |
STRUCR - TPSTSP | Latest scheduled start (from forecast dates) | |
333 | ![]() |
STRUCR - TXTSP | Language: The long text was stored in this language | |
334 | ![]() |
STRUCR - USE04 | User field: Unit for quantity fields | |
335 | ![]() |
STRUCR - USE05 | User field: Unit for quantity fields | |
336 | ![]() |
STRUCR - USE06 | User field: Unit for value fields | |
337 | ![]() |
STRUCR - USE07 | User field: Unit for value fields | |
338 | ![]() |
STRUCR - USR00 | User field with 20 characters | |
339 | ![]() |
STRUCR - USR01 | User field with 20 characters | |
340 | ![]() |
STRUCR - USR02 | User field with 10 characters | |
341 | ![]() |
STRUCR - USR03 | User field with 10 characters | |
342 | ![]() |
STRUCR - USR04 | User field for quantity (length 10.3) | |
343 | ![]() |
STRUCR - USR05 | User field for quantity (length 10.3) | |
344 | ![]() |
STRUCR - USR06 | User-defined field for values (length 10,3) | |
345 | ![]() |
STRUCR - USR07 | User-defined field for values (length 10,3) | |
346 | ![]() |
STRUCR - USR08 | User field for date | |
347 | ![]() |
STRUCR - USR09 | User field for date | |
348 | ![]() |
STRUCR - USR10 | User-defined field: Indicator for reports | |
349 | ![]() |
STRUCR - USR11 | User-defined field: Indicator for reports | |
350 | ![]() |
STRUCR - VARBEH | Unit for work | |
351 | ![]() |
STRUCR - VARBEI | Tentative work | |
352 | ![]() |
STRUCR - VDAUEH | Actual duration unit | |
353 | ![]() |
STRUCR - VDAUER | Tentative duration | |
354 | ![]() |
STRUCR - VEINH | Unit for Duration of the Delay | |
355 | ![]() |
STRUCR - VERNA | Name of responsible person (Project manager) | |
356 | ![]() |
STRUCR - VERNR | Number of responsible person (project mgr)/MRP controller | |
357 | ![]() |
STRUCR - VERZUG | Duration After Latest Scheduled Finish | |
358 | ![]() |
STRUCR - VORBEI | Duration After Earliest Scheduled Start | |
359 | ![]() |
STRUCR - VORLEN | Tentative finish date | |
360 | ![]() |
STRUCR - VORLST | Tentative start date | |
361 | ![]() |
STRUCR - VSGRUPPE | Group for a project version | |
362 | ![]() |
STRUCR - VSNUMMER | Number or description of a version | |
363 | ![]() |
STRUCR - WAERS | Currency Key | |
364 | ![]() |
STRUCR - WERKS | Plant | |
365 | ![]() |
STRUCR_AFTER_RPSCO - EVGEW | Aggregation weight for POC (PS progress) | |
366 | ![]() |
STRUCR_AFTER_RPSCO - EVMET_A1 | Measurement method in PS progress analysis (actual) | |
367 | ![]() |
STRUCR_AFTER_RPSCO - EVMET_P1 | Measurement method for PS progress analysis (plan) | |
368 | ![]() |
STRUCR_BEFORE_DATES - ARNUMMER | Archiving Session Number | |
369 | ![]() |
STRUCR_BEFORE_DATES - KURZTEXT | Short text/description of the object | |
370 | ![]() |
STRUCR_BEFORE_DATES - OBJEKTID | ID/Object key | |
371 | ![]() |
STRUCR_BEFORE_DATES - OBJEKTTYP | Object Type Text | |
372 | ![]() |
STRUCR_BEFORE_DATES - VSGRUPPE | Group for a project version | |
373 | ![]() |
STRUCR_BEFORE_DATES - VSNUMMER | Number or description of a version | |
374 | ![]() |
STRUCR_BEFORE_RPSCO - AENNR | Change Number | |
375 | ![]() |
STRUCR_BEFORE_RPSCO - ARBPL | Work center | |
376 | ![]() |
STRUCR_BEFORE_RPSCO - BUKRS | Company Code | |
377 | ![]() |
STRUCR_BEFORE_RPSCO - FRUEHER | Actual start is before earliest scheduled start | |
378 | ![]() |
STRUCR_BEFORE_RPSCO - GSBER | Business Area | |
379 | ![]() |
STRUCR_BEFORE_RPSCO - KALID | Factory Calendar | |
380 | ![]() |
STRUCR_BEFORE_RPSCO - KOKRS | Controlling Area | |
381 | ![]() |
STRUCR_BEFORE_RPSCO - MEINH | Unit of Measure for Display | |
382 | ![]() |
STRUCR_BEFORE_RPSCO - OWAERS | Object currency for network activity | |
383 | ![]() |
STRUCR_BEFORE_RPSCO - PSPRI | Priority | |
384 | ![]() |
STRUCR_BEFORE_RPSCO - PUFFP | Free float (from forecast) | |
385 | ![]() |
STRUCR_BEFORE_RPSCO - PUFFR | Free float | |
386 | ![]() |
STRUCR_BEFORE_RPSCO - PUFGP | Total float (from forecast) | |
387 | ![]() |
STRUCR_BEFORE_RPSCO - PUFGS | Total float | |
388 | ![]() |
STRUCR_BEFORE_RPSCO - SPAETER | Actual Finish/Planned Finish After Latest Scheduled Finish | |
389 | ![]() |
STRUCR_BEFORE_RPSCO - STATXT | Edited status text | |
390 | ![]() |
STRUCR_BEFORE_RPSCO - TXTSP | Language: The long text was stored in this language | |
391 | ![]() |
STRUCR_BEFORE_RPSCO - USR10 | User-defined field: Indicator for reports | |
392 | ![]() |
STRUCR_BEFORE_RPSCO - USR11 | User-defined field: Indicator for reports | |
393 | ![]() |
STRUCR_BEFORE_RPSCO - VEINH | Unit for Duration of the Delay | |
394 | ![]() |
STRUCR_BEFORE_RPSCO - VERNA | Name of responsible person (Project manager) | |
395 | ![]() |
STRUCR_BEFORE_RPSCO - VERNR | Number of responsible person (project mgr)/MRP controller | |
396 | ![]() |
STRUCR_BEFORE_RPSCO - VERZUG | Duration After Latest Scheduled Finish | |
397 | ![]() |
STRUCR_BEFORE_RPSCO - VORBEI | Duration After Earliest Scheduled Start | |
398 | ![]() |
STRUCR_BEFORE_RPSCO - WAERS | Currency Key | |
399 | ![]() |
STRUCR_BEFORE_RPSCO - WERKS | Plant | |
400 | ![]() |
STRUCR_BEFORE_USER - ABARBA | Percent of completion for work | |
401 | ![]() |
STRUCR_BEFORE_USER - SLWID | Key word ID for user-defined fields | |
402 | ![]() |
STRUCR_BEFORE_USER - USR00 | User field with 20 characters | |
403 | ![]() |
STRUCR_BEFORE_USER - USR01 | User field with 20 characters | |
404 | ![]() |
STRUCR_BEFORE_USER - USR02 | User field with 10 characters | |
405 | ![]() |
STRUCR_BEFORE_USER - USR03 | User field with 10 characters | |
406 | ![]() |
STRUCR_BEFORE_WORK - ABARBD | Processing % of duration | |
407 | ![]() |
STRUCR_BEFORE_WORK - EDAUEH | Actual duration unit | |
408 | ![]() |
STRUCR_BEFORE_WORK - EDAUER | Duration | |
409 | ![]() |
STRUCR_BEFORE_WORK - IDAUEH | Actual duration unit | |
410 | ![]() |
STRUCR_BEFORE_WORK - IDAUER | Actual duration | |
411 | ![]() |
STRUCR_BEFORE_WORK - PDAUEH | Actual duration unit | |
412 | ![]() |
STRUCR_BEFORE_WORK - PDAUER | Forecast duration | |
413 | ![]() |
STRUCR_BEFORE_WORK - RDAUEH | Actual duration unit | |
414 | ![]() |
STRUCR_BEFORE_WORK - RDAUER | Remaining duration | |
415 | ![]() |
STRUCR_BEFORE_WORK - VDAUEH | Actual duration unit | |
416 | ![]() |
STRUCR_BEFORE_WORK - VDAUER | Tentative duration | |
417 | ![]() |
STRUCR_DATES - DATFS | Earliest start date | |
418 | ![]() |
STRUCR_DATES - DATSE | Latest finish date | |
419 | ![]() |
STRUCR_DATES - ECKEN | Finish date (from basic dates) | |
420 | ![]() |
STRUCR_DATES - ECKST | Basic start date | |
421 | ![]() |
STRUCR_DATES - ISTEN | Actual finish date | |
422 | ![]() |
STRUCR_DATES - ISTST | Actual start date | |
423 | ![]() |
STRUCR_DATES - PROGEN | Forecast finish date | |
424 | ![]() |
STRUCR_DATES - PROGST | Forecast start date | |
425 | ![]() |
STRUCR_DATES - TEENFR | Earliest scheduled finish (from basic dates) | |
426 | ![]() |
STRUCR_DATES - TEENSP | Latest scheduled finish (from basic dates) | |
427 | ![]() |
STRUCR_DATES - TESTFR | Earliest scheduled start (from basic dates) | |
428 | ![]() |
STRUCR_DATES - TESTSP | Latest scheduled start (from basic dates) | |
429 | ![]() |
STRUCR_DATES - TPENFR | Earliest scheduled finish (from forecast dates) | |
430 | ![]() |
STRUCR_DATES - TPENSP | Latest scheduled finish (from forecast dates) | |
431 | ![]() |
STRUCR_DATES - TPSTFR | Earliest scheduled start (from forecast dates) | |
432 | ![]() |
STRUCR_DATES - TPSTSP | Latest scheduled start (from forecast dates) | |
433 | ![]() |
STRUCR_DATES - VORLEN | Tentative finish date | |
434 | ![]() |
STRUCR_DATES - VORLST | Tentative start date | |
435 | ![]() |
STRUCR_USER - USE04 | User field: Unit for quantity fields | |
436 | ![]() |
STRUCR_USER - USE05 | User field: Unit for quantity fields | |
437 | ![]() |
STRUCR_USER - USE06 | User field: Unit for value fields | |
438 | ![]() |
STRUCR_USER - USE07 | User field: Unit for value fields | |
439 | ![]() |
STRUCR_USER - USR04 | User field for quantity (length 10.3) | |
440 | ![]() |
STRUCR_USER - USR05 | User field for quantity (length 10.3) | |
441 | ![]() |
STRUCR_USER - USR06 | User-defined field for values (length 10,3) | |
442 | ![]() |
STRUCR_USER - USR07 | User-defined field for values (length 10,3) | |
443 | ![]() |
STRUCR_USER - USR08 | User field for date | |
444 | ![]() |
STRUCR_USER - USR09 | User field for date | |
445 | ![]() |
STRUCR_WORK - EARBEH | Unit for work | |
446 | ![]() |
STRUCR_WORK - EARBEI | Work | |
447 | ![]() |
STRUCR_WORK - IARBEH | Unit for work | |
448 | ![]() |
STRUCR_WORK - IARBEI | Actual work | |
449 | ![]() |
STRUCR_WORK - PARBEH | Unit for work | |
450 | ![]() |
STRUCR_WORK - PARBEI | Forecast work | |
451 | ![]() |
STRUCR_WORK - RARBEH | Unit for work | |
452 | ![]() |
STRUCR_WORK - RARBEI | Remaining work | |
453 | ![]() |
STRUCR_WORK - VARBEH | Unit for work | |
454 | ![]() |
STRUCR_WORK - VARBEI | Tentative work |