Table/Structure Field list used by SAP ABAP Program RCNOPER (Excel Value Table - Operations)
SAP ABAP Program RCNOPER (Excel Value Table - Operations) is using
pages: 1 2 3
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
1 | Table/Structure Field | AFVGD - ABLIPKZ | Indicator: simultaneous teardown and wait | |
2 | Table/Structure Field | AFVGD - ABLAD | Unloading Point | |
3 | Table/Structure Field | AFVGD - ZWNOR | Standard queue time | |
4 | Table/Structure Field | AFVGD - ZWMIN | Minimum queue time | |
5 | Table/Structure Field | AFVGD - ZULNR | Basis for standard value calculation | |
6 | Table/Structure Field | AFVGD - ZTNOR | Standard move time | |
7 | Table/Structure Field | AFVGD - ZTMIN | Minimum move time | |
8 | Table/Structure Field | AFVGD - ZSCHL | Overhead key | |
9 | Table/Structure Field | AFVGD - ZMINU | Minimum overlap time | |
10 | Table/Structure Field | AFVGD - ZMINB | Minimum processing time | |
11 | Table/Structure Field | AFVGD - ZMERH | Break | |
12 | Table/Structure Field | AFVGD - ZLPRO | Minimum wait time | |
13 | Table/Structure Field | AFVGD - ZLMAX | Maximum wait time | |
14 | Table/Structure Field | AFVGD - ZGDAT | Date when the standard value was calculated | |
15 | Table/Structure Field | AFVGD - ZERMA | Type of standard value calculation | |
16 | Table/Structure Field | AFVGD - ZEIWN | Unit for the standard queue time | |
17 | Table/Structure Field | AFVGD - ZEIWM | Unit for the minumum queue time | |
18 | Table/Structure Field | AFVGD - ZEITN | Unit for the standard move time | |
19 | Table/Structure Field | AFVGD - ZEITM | Unit for the minimum move time | |
20 | Table/Structure Field | AFVGD - ZEIMU | Unit for the minimum overlap time | |
21 | Table/Structure Field | AFVGD - ZEIMB | Unit for the minimum processing time | |
22 | Table/Structure Field | AFVGD - ZEILP | Unit for the required wait time | |
23 | Table/Structure Field | AFVGD - ZEILM | Unit for the maximum wait time | |
24 | Table/Structure Field | AFVGD - ZEIER | Unit for the break time | |
25 | Table/Structure Field | AFVGD - ZCODE | Reference number for standard value code | |
26 | Table/Structure Field | AFVGD - ZAEHL | Internal counter | |
27 | Table/Structure Field | AFVGD - XMNGA | Total scrap quantity confirmed | |
28 | Table/Structure Field | AFVGD - WRTZE | Unit of measure for queue time | |
29 | Table/Structure Field | AFVGD - WKURS | Exchange Rate | |
30 | Table/Structure Field | AFVGD - WERKS | Plant | |
31 | Table/Structure Field | AFVGD - WERKI | Actual plant | |
32 | Table/Structure Field | AFVGD - WEMPF | Goods recipient | |
33 | Table/Structure Field | AFVGD - WEMNG_OPR | Quantity of goods received | |
34 | Table/Structure Field | AFVGD - WEMEH_OPR | Order unit | |
35 | Table/Structure Field | AFVGD - WARTZ | Queue time used for scheduling | |
36 | Table/Structure Field | AFVGD - WAERS | Currency Key | |
37 | Table/Structure Field | AFVGD - VSTZW | Deadline function | |
38 | Table/Structure Field | AFVGD - VSTTXT | System Status | |
39 | Table/Structure Field | AFVGD - VSTGA | Deadline deviation reason | |
40 | Table/Structure Field | AFVGD - VSNMR | Number or description of a version | |
41 | Table/Structure Field | AFVGD - VPLTY | Type of the referenced task list | |
42 | Table/Structure Field | AFVGD - VPLNR | Group of the referenced task list | |
43 | Table/Structure Field | AFVGD - VPLFL | Referenced sequence in routing | |
44 | Table/Structure Field | AFVGD - VPLAL | Group counter of the referenced task list | |
45 | Table/Structure Field | AFVGD - VORNR | Operation/Activity Number | |
46 | Table/Structure Field | AFVGD - VNAME | Joint venture | |
47 | Table/Structure Field | AFVGD - VINTV | Increment between referenced operations | |
48 | Table/Structure Field | AFVGD - VGWTS | Standard value key | |
49 | Table/Structure Field | AFVGD - VGW06 | Standard Value | |
50 | Table/Structure Field | AFVGD - VGW05 | Standard Value | |
51 | Table/Structure Field | AFVGD - VGW04 | Standard Value | |
52 | Table/Structure Field | AFVGD - VGW03 | Standard Value | |
53 | Table/Structure Field | AFVGD - VGW02 | Standard Value | |
54 | Table/Structure Field | AFVGD - VGW01 | Standard Value | |
55 | Table/Structure Field | AFVGD - VGE06 | Unit of measure for the standard value | |
56 | Table/Structure Field | AFVGD - VGE05 | Unit of measure for the standard value | |
57 | Table/Structure Field | AFVGD - VGE04 | Unit of measure for the standard value | |
58 | Table/Structure Field | AFVGD - VGE03 | Unit of measure for the standard value | |
59 | Table/Structure Field | AFVGD - VGE02 | Unit of measure for the standard value | |
60 | Table/Structure Field | AFVGD - VGE01 | Unit of measure for the standard value | |
61 | Table/Structure Field | AFVGD - VERTL | Distr.cap.reqmts (plant maint.,process order, network) | |
62 | Table/Structure Field | AFVGD - VART | Dummy | |
63 | Table/Structure Field | AFVGD - UVORN | Suboperation | |
64 | Table/Structure Field | AFVGD - USR11 | User-defined field: Indicator for reports | |
65 | Table/Structure Field | AFVGD - USR10 | User-defined field: Indicator for reports | |
66 | Table/Structure Field | AFVGD - USR09 | User field for date | |
67 | Table/Structure Field | AFVGD - USR08 | User field for date | |
68 | Table/Structure Field | AFVGD - USR07 | User-defined field for values (length 10,3) | |
69 | Table/Structure Field | AFVGD - USR06 | User-defined field for values (length 10,3) | |
70 | Table/Structure Field | AFVGD - USR05 | User field for quantity (length 10.3) | |
71 | Table/Structure Field | AFVGD - USR04 | User field for quantity (length 10.3) | |
72 | Table/Structure Field | AFVGD - USR03 | User field with 10 characters | |
73 | Table/Structure Field | AFVGD - USR02 | User field with 10 characters | |
74 | Table/Structure Field | AFVGD - USR01 | User field with 20 characters | |
75 | Table/Structure Field | AFVGD - USR00 | User field with 20 characters | |
76 | Table/Structure Field | AFVGD - USE07 | User field: Unit for value fields | |
77 | Table/Structure Field | AFVGD - USE06 | User field: Unit for value fields | |
78 | Table/Structure Field | AFVGD - USE05 | User field: Unit for quantity fields | |
79 | Table/Structure Field | AFVGD - USE04 | User field: Unit for quantity fields | |
80 | Table/Structure Field | AFVGD - UMREZ | Numerator for converting task list and oper. un. of measure | |
81 | Table/Structure Field | AFVGD - UMREN | Denominator for converting rtg and op units of measure | |
82 | Table/Structure Field | AFVGD - UEMUS | Required overlapping | |
83 | Table/Structure Field | AFVGD - UEKAN | Optional overlapping | |
84 | Table/Structure Field | AFVGD - TXTSP | Language Key | |
85 | Table/Structure Field | AFVGD - TXJCD | Tax Jurisdiction | |
86 | Table/Structure Field | AFVGD - TXCHG | Indicator: long text changed | |
87 | Table/Structure Field | AFVGD - TRAZE | Unit of measure for move time | |
88 | Table/Structure Field | AFVGD - TRANZ | Move time used for scheduling | |
89 | Table/Structure Field | AFVGD - TPLNR | AFVGD-TPLNR | |
90 | Table/Structure Field | AFVGD - TECHS | AFVGD-TECHS | |
91 | Table/Structure Field | AFVGD - TAKT | takt within a line segment | |
92 | Table/Structure Field | AFVGD - SUMNR | Node number of the superior operation | |
93 | Table/Structure Field | AFVGD - SUBSYS | Subsystem Identifier for QM Subsystem Interface | |
94 | Table/Structure Field | AFVGD - STEUS | Control key | |
95 | Table/Structure Field | AFVGD - STDKN | Node of operation within reference operation set | |
96 | Table/Structure Field | AFVGD - SSSLZ | Latest scheduled start: Wait time | |
97 | Table/Structure Field | AFVGD - SSSLD | Latest scheduled start: Wait time (date) | |
98 | Table/Structure Field | AFVGD - SSSBZ | Latest scheduled start: Processing (time) | |
99 | Table/Structure Field | AFVGD - SSSBD | Latest scheduled start: Processing (date) | |
100 | Table/Structure Field | AFVGD - SSSAZ | Latest scheduled start: Teardown (time) | |
101 | Table/Structure Field | AFVGD - SSSAD | Latest scheduled start: Teardown (date) | |
102 | Table/Structure Field | AFVGD - SSEVZ | Latest operation finish (time) | |
103 | Table/Structure Field | AFVGD - SSEVD | Latest finish date of operation | |
104 | Table/Structure Field | AFVGD - SSELZ | Latest scheduled finish: Wait time | |
105 | Table/Structure Field | AFVGD - SSELD | Latest scheduled finish: Wait time (date) | |
106 | Table/Structure Field | AFVGD - SSEDZ | Latest scheduled finish: Execution (time) | |
107 | Table/Structure Field | AFVGD - SSEDD | Latest scheduled finish: Execution (date) | |
108 | Table/Structure Field | AFVGD - SSAVZ | Latest scheduled start: Execution (time) | |
109 | Table/Structure Field | AFVGD - SSAVD | Latest scheduled start: Execution (date) | |
110 | Table/Structure Field | AFVGD - SPMUS | Required splitting | |
111 | Table/Structure Field | AFVGD - SPLQ | AFVGD-SPLQ | |
112 | Table/Structure Field | AFVGD - SPLIM | Maximum number of splits | |
113 | Table/Structure Field | AFVGD - SPEDZ | Latest scheduled finish time (forecast) | |
114 | Table/Structure Field | AFVGD - SPEDD | Latest scheduled finish date (forecast) | |
115 | Table/Structure Field | AFVGD - SPAVZ | Latest scheduled start time (forecast) | |
116 | Table/Structure Field | AFVGD - SPAVD | Latest scheduled start date (forecast) | |
117 | Table/Structure Field | AFVGD - SPARAMETER3 | AFVGD-SPARAMETER3 | |
118 | Table/Structure Field | AFVGD - SPARAMETER2 | AFVGD-SPARAMETER2 | |
119 | Table/Structure Field | AFVGD - SPARAMETER1 | AFVGD-SPARAMETER1 | |
120 | Table/Structure Field | AFVGD - SPANZ | Actual number of splits | |
121 | Table/Structure Field | AFVGD - SORTL | Sort Term for Non-Stock Info Records | |
122 | Table/Structure Field | AFVGD - SLWID | Key word ID for user-defined fields | |
123 | Table/Structure Field | AFVGD - SERVCHG | AFVGD-SERVCHG | |
124 | Table/Structure Field | AFVGD - SELKZ | Selection indicator for costing line items | |
125 | Table/Structure Field | AFVGD - SCOPE | Object Class | |
126 | Table/Structure Field | AFVGD - SCHED_END | Ind.: Purchase requisition at activity finish date | |
127 | Table/Structure Field | AFVGD - SAKTO | Cost Element | |
128 | Table/Structure Field | AFVGD - RWFAK | Rework factor (is not used yet) | |
129 | Table/Structure Field | AFVGD - RUEST | Setup time | |
130 | Table/Structure Field | AFVGD - RUECK | Completion confirmation number for the operation | |
131 | Table/Structure Field | AFVGD - RSTZE | Unit of measure for setup time | |
132 | Table/Structure Field | AFVGD - RSTUF | Reduction level which reduces operation lead time | |
133 | Table/Structure Field | AFVGD - RSTRA | Reduction strategy per operation/activity | |
134 | Table/Structure Field | AFVGD - RSANZ | Number of confirmation slips | |
135 | Table/Structure Field | AFVGD - RMZHL | Confirmation counter | |
136 | Table/Structure Field | AFVGD - RMNGA | Total confirmed rework quantity | |
137 | Table/Structure Field | AFVGD - RFSCH | Setup group key | |
138 | Table/Structure Field | AFVGD - RFPNT | AFVGD-RFPNT | |
139 | Table/Structure Field | AFVGD - RFGRP | Setup group category | |
140 | Table/Structure Field | AFVGD - RECID | Recovery Indicator | |
141 | Table/Structure Field | AFVGD - RASCH | Setup Type Key | |
142 | Table/Structure Field | AFVGD - QUALF | Suitability | |
143 | Table/Structure Field | AFVGD - QRASTZFAK | Time Factor | |
144 | Table/Structure Field | AFVGD - QRASTZEHT | Time Unit | |
145 | Table/Structure Field | AFVGD - QRASTMENG | Quantity Between Two Inspections | |
146 | Table/Structure Field | AFVGD - QRASTEREH | Grid Unit of Measure | |
147 | Table/Structure Field | AFVGD - QPPKTABS | Flow Variants for Inspection Point Completion | |
148 | Table/Structure Field | AFVGD - QPART | Inspection Type | |
149 | Table/Structure Field | AFVGD - QLSTEXT | Object Name | |
150 | Table/Structure Field | AFVGD - QLSEARCH | Search term for qualification requirements | |
151 | Table/Structure Field | AFVGD - QLKAPAR | Capacity category | |
152 | Table/Structure Field | AFVGD - QKZZTMG1 | Quantity Confirmation for Each Partial Lot | |
153 | Table/Structure Field | AFVGD - QKZTLSBEST | Operation with Stock-Related Partial Lot Assignment | |
154 | Table/Structure Field | AFVGD - QKZPRZEIT | Interval = Time (Time-Related) | |
155 | Table/Structure Field | AFVGD - QKZPRMENG | Creation Cycle = Quantity (Quantity-Reference) | |
156 | Table/Structure Field | AFVGD - QKZPRFREI | Interval Without Reference to Time or Quantity | |
157 | Table/Structure Field | AFVGD - PVZNR | Superior Operation | |
158 | Table/Structure Field | AFVGD - PVZKN | General counter for order | |
159 | Table/Structure Field | AFVGD - PVZIN | Field defined as in SY-TABIX | |
160 | Table/Structure Field | AFVGD - PUFGS | Total float | |
161 | Table/Structure Field | AFVGD - PUFGP | Total float (from forecast) | |
162 | Table/Structure Field | AFVGD - PUFFR | Free float | |
163 | Table/Structure Field | AFVGD - PUFFP | Free float (from forecast) | |
164 | Table/Structure Field | AFVGD - PSTXTTI | PS text description | |
165 | Table/Structure Field | AFVGD - PSTXTAR | Type of PS text to be copied into the purchase requisition | |
166 | Table/Structure Field | AFVGD - PSTXCHG | Changed PS text indiator | |
167 | Table/Structure Field | AFVGD - PSPNR | Standard WBS element | |
168 | Table/Structure Field | AFVGD - PRZNT | Work percentage | |
169 | Table/Structure Field | AFVGD - PRZ01 | Business Process | |
170 | Table/Structure Field | AFVGD - PROJN | Work breakdown structure element (WBS element) | |
171 | Table/Structure Field | AFVGD - PROD_ACT | Indicator: Activity is a production activity | |
172 | Table/Structure Field | AFVGD - PRKST | Costs in the activity | |
173 | Table/Structure Field | AFVGD - PREIS | Price | |
174 | Table/Structure Field | AFVGD - PRCTR | Profit Center | |
175 | Table/Structure Field | AFVGD - PPRIO | Priority | |
176 | Table/Structure Field | AFVGD - PLNTY | Task List Type | |
177 | Table/Structure Field | AFVGD - PLNNR | Key for Task List Group | |
178 | Table/Structure Field | AFVGD - PLNKN | Number of the task list node | |
179 | Table/Structure Field | AFVGD - PLNFL | Sequence | |
180 | Table/Structure Field | AFVGD - PLNAL | Group Counter | |
181 | Table/Structure Field | AFVGD - PLIFZ | Planned delivery time in days | |
182 | Table/Structure Field | AFVGD - PHSEQ | Control Recipe Destination | |
183 | Table/Structure Field | AFVGD - PHFLG | Indicator: Phase | |
184 | Table/Structure Field | AFVGD - PERNR | Personnel number | |
185 | Table/Structure Field | AFVGD - PEINH | Price unit | |
186 | Table/Structure Field | AFVGD - PEDZ | Forecast finish time of operation from confirmation | |
187 | Table/Structure Field | AFVGD - PEDD | Forecast finish date of operation from confirmation | |
188 | Table/Structure Field | AFVGD - PDEST | Printer for shop papers | |
189 | Table/Structure Field | AFVGD - PDAU | Forecasted duration of activity from confirmation | |
190 | Table/Structure Field | AFVGD - PDAE | Unit of the forecasted duration from the confirmation | |
191 | Table/Structure Field | AFVGD - PACKNO | Package number | |
192 | Table/Structure Field | AFVGD - OWAER | Object currency for network activity | |
193 | Table/Structure Field | AFVGD - OTYPE | Object Type | |
194 | Table/Structure Field | AFVGD - ORGAUFPL | Routing number of operations in the order | |
195 | Table/Structure Field | AFVGD - ORGAPLZL | General counter for order | |
196 | Table/Structure Field | AFVGD - OPRZ1 | Remaining quantity for business process | |
197 | Table/Structure Field | AFVGD - OPRE1 | Unit for remaining quantity of business process | |
198 | Table/Structure Field | AFVGD - OFMNW | Forecasted work (actual + remaining) | |
199 | Table/Structure Field | AFVGD - OFM06 | Forecast value used to update the standard value | |
200 | Table/Structure Field | AFVGD - OFM05 | Forecast value used to update the standard value | |
201 | Table/Structure Field | AFVGD - OFM04 | Forecast value used to update the standard value | |
202 | Table/Structure Field | AFVGD - OFM03 | Forecast value used to update the standard value | |
203 | Table/Structure Field | AFVGD - OFM02 | Forecast value used to update the standard value | |
204 | Table/Structure Field | AFVGD - OFM01 | Forecast value used to update the standard value | |
205 | Table/Structure Field | AFVGD - OFFSTE | Offset to sub-operation finish | |
206 | Table/Structure Field | AFVGD - OFFSTB | Offset to sub-operation start | |
207 | Table/Structure Field | AFVGD - OBJTYPE | Change indicator | |
208 | Table/Structure Field | AFVGD - OBJNR | Object number | |
209 | Table/Structure Field | AFVGD - OBJEKTID | Object ID | |
210 | Table/Structure Field | AFVGD - NTENZ | Basic finish time of the activity | |
211 | Table/Structure Field | AFVGD - NTEND | Constraint for finish of activity (Basic) | |
212 | Table/Structure Field | AFVGD - NTANZ | Constraint for activity start time (Basic) | |
213 | Table/Structure Field | AFVGD - NTANF | Constraint for activity start (Basic) | |
214 | Table/Structure Field | AFVGD - NPTXTKY | Internal text number (12-character) | |
215 | Table/Structure Field | AFVGD - NPRIO | Priority | |
216 | Table/Structure Field | AFVGD - NO_DISP | Effective for Materials Planning | |
217 | Table/Structure Field | AFVGD - NETZKONT | Indicator for the account assignment of a network(hdr/act.) | |
218 | Table/Structure Field | AFVGD - MLSTN | Usage | |
219 | Table/Structure Field | AFVGD - MINWE | Minimum Send-Ahead Quantity | |
220 | Table/Structure Field | AFVGD - MGVRG | Operation Quantity | |
221 | Table/Structure Field | AFVGD - MEINH | Unit of measure for activity | |
222 | Table/Structure Field | AFVGD - MAT_PRKST | Material planning in networks: primary costs | |
223 | Table/Structure Field | AFVGD - MATKL | Material Group | |
224 | Table/Structure Field | AFVGD - MANDT | Client | |
225 | Table/Structure Field | AFVGD - LTXA2 | Second line of the description | |
226 | Table/Structure Field | AFVGD - LOSVG | Operation quantity in order unit of measure | |
227 | Table/Structure Field | AFVGD - LTXA1 | Operation short text | |
228 | Table/Structure Field | AFVGD - ABRUE | Teardown | |
229 | Table/Structure Field | AFVGD - AENNR | Change Number | |
230 | Table/Structure Field | AFVGD - AFNAM | Name of requisitioner/requester | |
231 | Table/Structure Field | AFVGD - ANFKO | Requesting cost center | |
232 | Table/Structure Field | AFVGD - ANFKOKRS | Controlling area of the requesting cost center | |
233 | Table/Structure Field | AFVGD - ANLZU | Syst.Condition | |
234 | Table/Structure Field | AFVGD - ANZMA | Number of employees | |
235 | Table/Structure Field | AFVGD - ANZZL | Number of capacities required | |
236 | Table/Structure Field | AFVGD - APLFL | Sequence | |
237 | Table/Structure Field | AFVGD - APLFZ | Planned delivery time in days | |
238 | Table/Structure Field | AFVGD - APLZL | General counter for order | |
239 | Table/Structure Field | AFVGD - ARBEH | Unit for work | |
240 | Table/Structure Field | AFVGD - ARBEI | Work involved in the activity | |
241 | Table/Structure Field | AFVGD - ARBID | Object ID of the resource | |
242 | Table/Structure Field | AFVGD - ARBII | Actual operating resources object identification | |
243 | Table/Structure Field | AFVGD - ARBPI | Actual work center | |
244 | Table/Structure Field | AFVGD - ARBPL | Work center | |
245 | Table/Structure Field | AFVGD - ARUZE | Unit of measure for teardown | |
246 | Table/Structure Field | AFVGD - ASKUM | Cumulative Scrap Qty of Subsequent Reporting Pts (Cur. Per.) | |
247 | Table/Structure Field | AFVGD - ASVRG | Operation scrap | |
248 | Table/Structure Field | AFVGD - AUDISP | Reservation Relevance/Generation of Purchase Requisition | |
249 | Table/Structure Field | AFVGD - AUFAK | Scrap factor | |
250 | Table/Structure Field | AFVGD - AUFKT | Execution Factor | |
251 | Table/Structure Field | AFVGD - AUFNRD | Order Number | |
252 | Table/Structure Field | AFVGD - AUFPL | Routing number of operations in the order | |
253 | Table/Structure Field | AFVGD - BANFN | Purchase requisition number | |
254 | Table/Structure Field | AFVGD - BANFN_DEL | Purchase requisition number | |
255 | Table/Structure Field | AFVGD - BEARP | Processing time (forecast) | |
256 | Table/Structure Field | AFVGD - BEARZ | Processing time | |
257 | Table/Structure Field | AFVGD - BEAZE | Unit of measure for processing time | |
258 | Table/Structure Field | AFVGD - BEAZP | Unit of processing time (Forecast) | |
259 | Table/Structure Field | AFVGD - BEDID | ID of the capacity requirements record | |
260 | Table/Structure Field | AFVGD - BEDNR | Requirement Tracking Number | |
261 | Table/Structure Field | AFVGD - BEDZL | Internal counter | |
262 | Table/Structure Field | AFVGD - BMSCH | Base Quantity | |
263 | Table/Structure Field | AFVGD - BNFPO | Item number of the purchase requisition in the order | |
264 | Table/Structure Field | AFVGD - BNFPO_DEL | Item number of the purchase requisition in the order | |
265 | Table/Structure Field | AFVGD - BUKRS | Company Code | |
266 | Table/Structure Field | AFVGD - BZOFFB | Reference date for start of sub-operation | |
267 | Table/Structure Field | AFVGD - BZOFFE | Reference date for finish of sub-operation | |
268 | Table/Structure Field | AFVGD - CH_PROC | Process that has lead to the change of an object | |
269 | Table/Structure Field | AFVGD - CLASF | Ind.: Take Activity Into Account for Project Summarization | |
270 | Table/Structure Field | AFVGD - COMP_RES | OCM: Result of comparison of two order objects | |
271 | Table/Structure Field | AFVGD - CUOBJ_ARB | Configuration (internal object number) | |
272 | Table/Structure Field | AFVGD - CY_SEQNRV | Sequence number operation | |
273 | Table/Structure Field | AFVGD - DAABR | Teardown time | |
274 | Table/Structure Field | AFVGD - DABEA | Processing time | |
275 | Table/Structure Field | AFVGD - DADRF | Duration of execution time (setup + processing + teardown) | |
276 | Table/Structure Field | AFVGD - DALIE | Wait time | |
277 | Table/Structure Field | AFVGD - DAPBE | Duration of processing time (forecast) | |
278 | Table/Structure Field | AFVGD - DARUE | Setup time | |
279 | Table/Structure Field | AFVGD - DATRA | Duration of move time | |
280 | Table/Structure Field | AFVGD - DAUME | Unit for the minimum duration | |
281 | Table/Structure Field | AFVGD - DAUMI | Minimum activity duration | |
282 | Table/Structure Field | AFVGD - DAUNE | Normal duration/unit | |
283 | Table/Structure Field | AFVGD - DAUNO | Normal duration of the activity | |
284 | Table/Structure Field | AFVGD - DAWAR | Queue time | |
285 | Table/Structure Field | AFVGD - DDEHN | Indicator: flexible duration | |
286 | Table/Structure Field | AFVGD - EBELN | Purchasing Document Number | |
287 | Table/Structure Field | AFVGD - EBELP | Item Number of Purchasing Document | |
288 | Table/Structure Field | AFVGD - EBORT | Installation Point for Subitem | |
289 | Table/Structure Field | AFVGD - EHOFFB | Unit for offset to start | |
290 | Table/Structure Field | AFVGD - EHOFFE | Unit for offset to finish | |
291 | Table/Structure Field | AFVGD - EINSA | Constraint on the basic start date for the activity | |
292 | Table/Structure Field | AFVGD - EINSE | Constraint on the finish date of the activity | |
293 | Table/Structure Field | AFVGD - EKGRP | Purchasing group for external processing | |
294 | Table/Structure Field | AFVGD - EKORG | Purchasing organization | |
295 | Table/Structure Field | AFVGD - EPANF | Dispatched start date for operation | |
296 | Table/Structure Field | AFVGD - EPANZ | Dispatched start time for operation | |
297 | Table/Structure Field | AFVGD - EPEND | Dispatched finish date | |
298 | Table/Structure Field | AFVGD - EPENZ | Dispatched finish time | |
299 | Table/Structure Field | AFVGD - EQUNR | AFVGD-EQUNR | |
300 | Table/Structure Field | AFVGD - ERFSICHT | Recording View | |
301 | Table/Structure Field | AFVGD - ESOKZ | Purchasing info record category | |
302 | Table/Structure Field | AFVGD - ETYPE | Equity type | |
303 | Table/Structure Field | AFVGD - EVGEW | Aggregation weight for POC (PS progress) | |
304 | Table/Structure Field | AFVGD - EWDAM | Minimum duration (from forecast) for activity | |
305 | Table/Structure Field | AFVGD - EWDAN | Normal duration (from forecast) of activity | |
306 | Table/Structure Field | AFVGD - EWDME | Unit for forecast minimum duration | |
307 | Table/Structure Field | AFVGD - EWDNE | Unit for forecast normal duration | |
308 | Table/Structure Field | AFVGD - EWEND | Forecast finish date | |
309 | Table/Structure Field | AFVGD - EWENZ | Forecast finish time for the activity | |
310 | Table/Structure Field | AFVGD - EWSTA | Forecast date constraint on activity start | |
311 | Table/Structure Field | AFVGD - EWSTD | Forecasted start date for the activity | |
312 | Table/Structure Field | AFVGD - EWSTE | Forecast date constraint on activity finish | |
313 | Table/Structure Field | AFVGD - EWSTZ | Forecast start time of the activity | |
314 | Table/Structure Field | AFVGD - FLGAT | Sequence category | |
315 | Table/Structure Field | AFVGD - FLG_AWE | Indicator: automatic goods receipt | |
316 | Table/Structure Field | AFVGD - FLG_CALC | AFVGD-FLG_CALC | |
317 | Table/Structure Field | AFVGD - FLG_DL | AFVGD-FLG_DL | |
318 | Table/Structure Field | AFVGD - FLG_EVP | Indicator: Trigger points allocated | |
319 | Table/Structure Field | AFVGD - FLG_FHM | Indicator: PRTs Assigned | |
320 | Table/Structure Field | AFVGD - FLG_FRD | Indicator: Operation is processed externally | |
321 | Table/Structure Field | AFVGD - FLG_FRE | Indicator: Release operation | |
322 | Table/Structure Field | AFVGD - FLG_KMP | Indicator: Components allocated | |
323 | Table/Structure Field | AFVGD - FLG_LOE | Indicator: Operation is deleted | |
324 | Table/Structure Field | AFVGD - FLG_MST | Indicator: Milestone | |
325 | Table/Structure Field | AFVGD - FLG_OBJ | AFVGD-FLG_OBJ | |
326 | Table/Structure Field | AFVGD - FLG_OFF | Indicator: Open operation (not finally confirmed) | |
327 | Table/Structure Field | AFVGD - FLG_PRM | Indicator: Inspection Characteristics Assigned | |
328 | Table/Structure Field | AFVGD - FLG_PST | Indicator: PS texts exist | |
329 | Table/Structure Field | AFVGD - FLG_PURS | Indicator: Purchase order exists | |
330 | Table/Structure Field | AFVGD - FLG_RCK | Indicator: Operation requires confirmation | |
331 | Table/Structure Field | AFVGD - FLG_UVO | Indicator: Suboperation exists | |
332 | Table/Structure Field | AFVGD - FLG_VAB | Indicator: Sub-network exists | |
333 | Table/Structure Field | AFVGD - FLIEF | Fixed vendor | |
334 | Table/Structure Field | AFVGD - FLIES | Indicator: continuous flow production | |
335 | Table/Structure Field | AFVGD - FORDN | Framework Order | |
336 | Table/Structure Field | AFVGD - FORDP | Item of framework order | |
337 | Table/Structure Field | AFVGD - FPAVD | Earliest scheduled start date (forecast) | |
338 | Table/Structure Field | AFVGD - FPEDD | Earliest scheduled finish date (forecast) | |
339 | Table/Structure Field | AFVGD - LOSME | Base Unit of Measure | |
340 | Table/Structure Field | AFVGD - LOGRP | Wage group | |
341 | Table/Structure Field | AFVGD - LOEKZ | Deletion flag | |
342 | Table/Structure Field | AFVGD - LOART | Wage type | |
343 | Table/Structure Field | AFVGD - LOANZ | Number of Time Tickets | |
344 | Table/Structure Field | AFVGD - LMNGA | Total Yield Confirmed | |
345 | Table/Structure Field | AFVGD - LIGZE | Unit of measure for wait time | |
346 | Table/Structure Field | AFVGD - LIFNR | Account Number of Vendor or Creditor | |
347 | Table/Structure Field | AFVGD - LIEGZ | Wait time used for scheduling | |
348 | Table/Structure Field | AFVGD - LEKNW | Indicator: No Remaining Work Expected | |
349 | Table/Structure Field | AFVGD - LEK06 | Indicator: No remaining activity expected | |
350 | Table/Structure Field | AFVGD - LEK05 | Indicator: No remaining activity expected | |
351 | Table/Structure Field | AFVGD - LEK04 | Indicator: No remaining activity expected | |
352 | Table/Structure Field | AFVGD - LEK03 | Indicator: No remaining activity expected | |
353 | Table/Structure Field | AFVGD - LEK02 | Indicator: No remaining activity expected | |
354 | Table/Structure Field | AFVGD - LEK01 | Indicator: No remaining activity expected | |
355 | Table/Structure Field | AFVGD - LARNT | Activity Type | |
356 | Table/Structure Field | AFVGD - LAR06 | Activity Type | |
357 | Table/Structure Field | AFVGD - LAR05 | Activity Type | |
358 | Table/Structure Field | AFVGD - LAR04 | Activity Type | |
359 | Table/Structure Field | AFVGD - LAR03 | Activity Type | |
360 | Table/Structure Field | AFVGD - LAR02 | Activity Type | |
361 | Table/Structure Field | AFVGD - LAR01 | Activity Type | |
362 | Table/Structure Field | AFVGD - KZWRTF | Indicator: Fixed price for external processing | |
363 | Table/Structure Field | AFVGD - KZLGF | Indicator: fixed lot external processing | |
364 | Table/Structure Field | AFVGD - KZFIX | Indicator: Purchasing info record data are fixed | |
365 | Table/Structure Field | AFVGD - KZFEAT | Indicator Is Not Used Currently | |
366 | Table/Structure Field | AFVGD - KTSCH | Standard text key | |
367 | Table/Structure Field | AFVGD - KTPNR | Item number of principal purchase agreement | |
368 | Table/Structure Field | AFVGD - KOSTL | Cost Center | |
369 | Table/Structure Field | AFVGD - KONNR | Number of principal purchase agreement | |
370 | Table/Structure Field | AFVGD - KOKRS | Controlling Area | |
371 | Table/Structure Field | AFVGD - KNOTE | Transportation Connection Points | |
372 | Table/Structure Field | AFVGD - KNOBJ | Number of Object with Assigned Dependencies | |
373 | Table/Structure Field | AFVGD - KLVAR | Costing Variant | |
374 | Table/Structure Field | AFVGD - KAPT_PUFFR | Operation floats after finite scheduling (in seconds) | |
375 | Table/Structure Field | AFVGD - KALTX | Description of the factory calendar | |
376 | Table/Structure Field | AFVGD - KALSM | Costing Sheet | |
377 | Table/Structure Field | AFVGD - KALNR | Cost Estimate Number for Cost Est. w/o Qty Structure | |
378 | Table/Structure Field | AFVGD - KALID | Factory Calendar | |
379 | Table/Structure Field | AFVGD - JV_OTYPE | Joint Venture Object Type | |
380 | Table/Structure Field | AFVGD - JV_OCO | JV original cost object | |
381 | Table/Structure Field | AFVGD - JV_JIBSA | JIB/JIBE Subclass A | |
382 | Table/Structure Field | AFVGD - JV_JIBCL | JIB/JIBE Class | |
383 | Table/Structure Field | AFVGD - IUPOZ | Subitem Number | |
384 | Table/Structure Field | AFVGD - ISTTY | BOM Category | |
385 | Table/Structure Field | AFVGD - ISTRU | Assembly | |
386 | Table/Structure Field | AFVGD - ISTPO | Internal counter | |
387 | Table/Structure Field | AFVGD - ISTNR | Bill of Material | |
388 | Table/Structure Field | AFVGD - ISTKN | BOM Item Node Number | |
389 | Table/Structure Field | AFVGD - ISMNW | Actual work | |
390 | Table/Structure Field | AFVGD - ISM06 | Previously confirmed activity | |
391 | Table/Structure Field | AFVGD - ISM05 | Previously confirmed activity | |
392 | Table/Structure Field | AFVGD - ISM04 | Previously confirmed activity | |
393 | Table/Structure Field | AFVGD - ISM03 | Previously confirmed activity | |
394 | Table/Structure Field | AFVGD - ISM01 | Previously confirmed activity | |
395 | Table/Structure Field | AFVGD - ISERH | Confirmed break time | |
396 | Table/Structure Field | AFVGD - ISDZ | Actual start: Execution/setup (time) | |
397 | Table/Structure Field | AFVGD - ISDD | Actual start: Execution (date) | |
398 | Table/Structure Field | AFVGD - ISBZ | Actual start: Processing (time) | |
399 | Table/Structure Field | AFVGD - ISBD | Actual start: Processing (date) | |
400 | Table/Structure Field | AFVGD - ISAZ | Actual start: Teardown (time) | |
401 | Table/Structure Field | AFVGD - ISAVD | Actual operation start (date) | |
402 | Table/Structure Field | AFVGD - ISAD | Actual start: Teardown (date) | |
403 | Table/Structure Field | AFVGD - IPRZ1 | Confirmed quantity/work for business process | |
404 | Table/Structure Field | AFVGD - IPRK1 | No remaining quantity expected for business process | |
405 | Table/Structure Field | AFVGD - IPRE1 | Unit of measurement for conf. quantity for business process | |
406 | Table/Structure Field | AFVGD - INFNR | Number of purchasing info record | |
407 | Table/Structure Field | AFVGD - INDEXSUMNR | Field defined as in SY-TABIX | |
408 | Table/Structure Field | AFVGD - INDET | Calculation key | |
409 | Table/Structure Field | AFVGD - INDBT | Field defined as in SY-TABIX | |
410 | Table/Structure Field | AFVGD - INACT | Version inactive indicator | |
411 | Table/Structure Field | AFVGD - ILE06 | Unit of measure for the activity to be confirmed | |
412 | Table/Structure Field | AFVGD - ILE05 | Unit of measure for the activity to be confirmed | |
413 | Table/Structure Field | AFVGD - ILE04 | Unit of measure for the activity to be confirmed | |
414 | Table/Structure Field | AFVGD - ILE03 | Unit of measure for the activity to be confirmed | |
415 | Table/Structure Field | AFVGD - ILE02 | Unit of measure for the activity to be confirmed | |
416 | Table/Structure Field | AFVGD - ILE01 | Unit of measure for the activity to be confirmed | |
417 | Table/Structure Field | AFVGD - IERZ | Actual finish: Setup (time) | |
418 | Table/Structure Field | AFVGD - IERD | Actual finish: Setup (date) | |
419 | Table/Structure Field | AFVGD - IEDZ | Actual finish: Execution (time) | |
420 | Table/Structure Field | AFVGD - IEDD | Actual finish: Execution (date) | |
421 | Table/Structure Field | AFVGD - IEBZ | Actual processing finish (time) | |
422 | Table/Structure Field | AFVGD - IEBD | Actual finish: Processing (date) | |
423 | Table/Structure Field | AFVGD - IEAVD | Actual finish of operation (date) | |
424 | Table/Structure Field | AFVGD - IDENT | AFVGD-IDENT | |
425 | Table/Structure Field | AFVGD - GSBER | Business Area | |
426 | Table/Structure Field | AFVGD - GMNGA | Confirmed yield in order unit of measure | |
427 | Table/Structure Field | AFVGD - FUNC_AREA | AFVGD-FUNC_AREA | |
428 | Table/Structure Field | AFVGD - FSSLZ | Earliest scheduled start: Wait (time) | |
429 | Table/Structure Field | AFVGD - FSSLD | Earliest scheduled start: Wait (date) | |
430 | Table/Structure Field | AFVGD - FSSBZ | Earliest scheduled start: Processing (time) | |
431 | Table/Structure Field | AFVGD - FSSBD | Earliest scheduled start: Processing (date) | |
432 | Table/Structure Field | AFVGD - FSSAZ | Earliest scheduled start: Teardown (time) | |
433 | Table/Structure Field | AFVGD - FSSAD | Earliest scheduled start: Teardown (date) | |
434 | Table/Structure Field | AFVGD - FSEVZ | Earliest finish of operation (time) | |
435 | Table/Structure Field | AFVGD - FSEVD | Earliest finish of operation (date) | |
436 | Table/Structure Field | AFVGD - FSELZ | Earliest scheduled finish: Wait (time) | |
437 | Table/Structure Field | AFVGD - FSELD | Earliest scheduled finish: Wait (date) | |
438 | Table/Structure Field | AFVGD - FSEDZ | Earliest scheduled finish: Execution (time) | |
439 | Table/Structure Field | AFVGD - FSEDD | Earliest scheduled finish: Execution (date) | |
440 | Table/Structure Field | AFVGD - FSAVZ | Earliest scheduled start: Execution (time) | |
441 | Table/Structure Field | AFVGD - FSAVD | Earliest scheduled start: Execution (date) | |
442 | Table/Structure Field | AFVGD - FRUNV | Indicator: External procurement data incomplete | |
443 | Table/Structure Field | AFVGD - FRSP | Earliest possible activity / Latest possible activity | |
444 | Table/Structure Field | AFVGD - FRDLB | Indicator: Externally processed op. with subcontracting | |
445 | Table/Structure Field | AFVGD - FPLNR | Billing plan number / invoicing plan number | |
446 | Table/Structure Field | AFVGD - FPEDZ | Earliest scheduled finish time (forecast) | |
447 | Table/Structure Field | AFVGD - FPAVZ | Earliest scheduled start time (forecast) | |
448 | Table/Structure Field | AFVGD - ISM02 | Previously confirmed activity | |
449 | Table/Structure Field | AFVGI - NO_DISP | Effective for Materials Planning | |
450 | Table/Structure Field | AFVGI - NPRIO | Priority | |
451 | Table/Structure Field | AFVGI - NPTXTKY | Internal text number (12-character) | |
452 | Table/Structure Field | AFVGI - OBJEKTID | Object ID | |
453 | Table/Structure Field | AFVGI - OBJNR | Object number | |
454 | Table/Structure Field | AFVGI - OBJTYPE | Change indicator | |
455 | Table/Structure Field | AFVGI - OTYPE | Object Type | |
456 | Table/Structure Field | AFVGI - OWAER | Object currency for network activity | |
457 | Table/Structure Field | AFVGI - PACKNO | Package number | |
458 | Table/Structure Field | AFVGI - PDEST | Printer for shop papers | |
459 | Table/Structure Field | AFVGI - PEINH | Price unit | |
460 | Table/Structure Field | AFVGI - PERNR | Personnel number | |
461 | Table/Structure Field | AFVGI - PHFLG | Indicator: Phase | |
462 | Table/Structure Field | AFVGI - PHSEQ | Control Recipe Destination | |
463 | Table/Structure Field | AFVGI - PLNAL | Group Counter | |
464 | Table/Structure Field | AFVGI - PLNFL | Sequence | |
465 | Table/Structure Field | AFVGI - PLNKN | Number of the task list node | |
466 | Table/Structure Field | AFVGI - PLNNR | Key for Task List Group | |
467 | Table/Structure Field | AFVGI - PLNTY | Task List Type | |
468 | Table/Structure Field | AFVGI - PPRIO | Priority | |
469 | Table/Structure Field | AFVGI - PRCTR | Profit Center | |
470 | Table/Structure Field | AFVGI - PREIS | Price | |
471 | Table/Structure Field | AFVGI - PRKST | Costs in the activity | |
472 | Table/Structure Field | AFVGI - PROD_ACT | Indicator: Activity is a production activity | |
473 | Table/Structure Field | AFVGI - PROJN | Work breakdown structure element (WBS element) | |
474 | Table/Structure Field | AFVGI - PRZ01 | Business Process | |
475 | Table/Structure Field | AFVGI - PRZNT | Work percentage | |
476 | Table/Structure Field | AFVGI - PSPNR | Standard WBS element | |
477 | Table/Structure Field | AFVGI - PVZKN | General counter for order | |
478 | Table/Structure Field | AFVGI - QKZPRFREI | Interval Without Reference to Time or Quantity | |
479 | Table/Structure Field | AFVGI - QKZPRMENG | Creation Cycle = Quantity (Quantity-Reference) | |
480 | Table/Structure Field | AFVGI - QKZPRZEIT | Interval = Time (Time-Related) | |
481 | Table/Structure Field | AFVGI - QKZTLSBEST | Operation with Stock-Related Partial Lot Assignment | |
482 | Table/Structure Field | AFVGI - QKZZTMG1 | Quantity Confirmation for Each Partial Lot | |
483 | Table/Structure Field | AFVGI - QLKAPAR | Capacity category | |
484 | Table/Structure Field | AFVGI - QPART | Inspection Type | |
485 | Table/Structure Field | AFVGI - QPPKTABS | Flow Variants for Inspection Point Completion | |
486 | Table/Structure Field | AFVGI - QUALF | Suitability | |
487 | Table/Structure Field | AFVGI - RASCH | Setup Type Key | |
488 | Table/Structure Field | AFVGI - RFGRP | Setup group category | |
489 | Table/Structure Field | AFVGI - RFPNT | AFVGI-RFPNT | |
490 | Table/Structure Field | AFVGI - RFSCH | Setup group key | |
491 | Table/Structure Field | AFVGI - VORNR | Operation/Activity Number | |
492 | Table/Structure Field | AFVGI - WAERS | Currency Key | |
493 | Table/Structure Field | AFVGI - VPLTY | Type of the referenced task list | |
494 | Table/Structure Field | AFVGI - VPLNR | Group of the referenced task list | |
495 | Table/Structure Field | AFVGI - VPLFL | Referenced sequence in routing | |
496 | Table/Structure Field | AFVGI - VPLAL | Group counter of the referenced task list | |
497 | Table/Structure Field | AFVGI - VGWTS | Standard value key | |
498 | Table/Structure Field | AFVGI - UEMUS | Required overlapping | |
499 | Table/Structure Field | AFVGI - VERTL | Distr.cap.reqmts (plant maint.,process order, network) | |
500 | Table/Structure Field | AFVGI - WEMPF | Goods recipient |