Table/Structure Field list used by SAP ABAP Program MMCP6FKP (Capacity planning: new version from 3.0F (possible from 3.0E))
SAP ABAP Program
MMCP6FKP (Capacity planning: new version from 3.0F (possible from 3.0E)) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | CRHD - ARBPL | Work center | ||
| 2 | CRHD - WERKS | Plant | ||
| 3 | CYBED_GRU - AENKZ | Change indicator | ||
| 4 | CYBED_GRU - FELD | Field according to which groupings are made | ||
| 5 | CYBED_GRU - GRUPPE | Requirements group | ||
| 6 | CYBED_GRU - INDEX | Index to related object (e.g. index to capacity) | ||
| 7 | CYBED_GRU - KOMBI | Combination within a requirements group | ||
| 8 | CYBED_GRU - STRUKTUR | Structure used to define grouping | ||
| 9 | CYFIL_TAB - FELD | Filter field (field whose value should be selected) | ||
| 10 | CYFIL_TAB - FILGRU | Filter group | ||
| 11 | CYFIL_TAB - LOW | Lower limit of the interval for filtering | ||
| 12 | CYFIL_TAB - OPTION | Relational Operator | ||
| 13 | CYFIL_TAB - SIGN | Inclusive/Exclusive Condition | ||
| 14 | CYPER_BED - AENKZ | Change indicator | ||
| 15 | CYPER_BED - ANGEAKT | Current available capacity | ||
| 16 | CYPER_BED - BEDAKT | Remaining capacity requirements for period | ||
| 17 | CYPER_BED - EINHEIT | Unit of of measure for displaying capacity requirements | ||
| 18 | CYPER_BED - GRUPPE | Requirements group | ||
| 19 | CYPER_BED - INDPER_TAB | Index to period table "PER_TAB" | ||
| 20 | CYPER_BED - KOMBI | Combination within a requirements group | ||
| 21 | CYPER_TAB - DATBIS | Date until (end of period) | ||
| 22 | CYPER_TAB - DATVON | Date from (start of the period) | ||
| 23 | CYPER_TAB - PERTEXT | Period description | ||
| 24 | CYSAUF_TAB - FUNKTION1 | Function to be carried out for object a "SOP order" | ||
| 25 | CYSAUF_TAB - FUNKTION2 | Function to be carried out for object a "SOP order" | ||
| 26 | CYSAUF_TAB - FUNKTION3 | Function to be carried out for object a "SOP order" | ||
| 27 | CYSAUF_TAB - MANDT | Client | ||
| 28 | CYSAUF_TAB - SAFNR | SOP order number | ||
| 29 | EMARC - ALTSL | Method for Selecting Alternative Bills of Material | ||
| 30 | EMARC - PERIV | Fiscal Year Variant | ||
| 31 | EMARC1 - ALTSL | Method for Selecting Alternative Bills of Material | ||
| 32 | EMARC2 - PERIV | Fiscal Year Variant | ||
| 33 | INRI - NRRANGENR | Number range number | ||
| 34 | INRI - RETURNCODE | Return code | ||
| 35 | KAKO - KAPAR | Capacity category | ||
| 36 | MARA - MATNR | Material Number | ||
| 37 | MARC - ALTSL | Method for Selecting Alternative Bills of Material | ||
| 38 | MARC - PERIV | Fiscal Year Variant | ||
| 39 | MCP6_LI - FELDH | Field name in the generated DDIC structure | ||
| 40 | MCP6_LI - KRIT1 | Planning object | ||
| 41 | MCP6_LI - LINE | Matrix line number | ||
| 42 | MCP6_RESS - ARBKA | Character Length 11 | ||
| 43 | MCP6_RESS - ARBPL | Work center | ||
| 44 | MCP6_RESS - A_Z | Natural number | ||
| 45 | MCP6_RESS - B_Z | Natural number | ||
| 46 | MCP6_RESS - KAPAR | Capacity category | ||
| 47 | MCP6_RESS - MEINS | Base Unit of Measure | ||
| 48 | MCP6_RESS - PLOBJ | Planning object | ||
| 49 | MCP6_RESS - TEXT | Line text: SOP | ||
| 50 | MCP6_RESS - WERKS | Plant | ||
| 51 | MCP6_SQ - FNAME | Field Name | ||
| 52 | MCP6_SQ - KRIT1 | Planning object | ||
| 53 | MCP6_SQ - MEINS | Unit for statistics | ||
| 54 | MCPERP - PERNA | Period: day, week, month, posting period as rep. internally | ||
| 55 | MKAL - BSTMI | Lower value of the lot-size interval | ||
| 56 | MKAL - VERID | Production Version | ||
| 57 | MPRO2 - DISPO | MRP controller | ||
| 58 | MPRO2 - FEVOR | Production Supervisor | ||
| 59 | MPRO2 - FHORI | Scheduling Margin Key for Floats | ||
| 60 | MPRO2 - MEINS | Unit of Measure for Display | ||
| 61 | MXSOP - C | Matrix column | ||
| 62 | MXSOP - V | Matrix element value | ||
| 63 | MXSOP - Z | Matrix line number | ||
| 64 | NRIV - OBJECT | Name of number range object | ||
| 65 | P445X - PLOBJ | Planning object | ||
| 66 | PGABV - PERID | Period: day, week, month, posting period as rep. internally | ||
| 67 | PGAN - PLOBO | Planning object | ||
| 68 | PGCOLS - BISTG | "To" period specification | ||
| 69 | PGCOLS - COLUMN | Matrix column | ||
| 70 | PGCOLS - PERDY | Period information | ||
| 71 | PGCOLS - PERIO | Period indicator | ||
| 72 | PGCOLS - VONTG | "From" period specification | ||
| 73 | PGCOLS - WOPKZ | Indicator: next/previous period | ||
| 74 | RCRHD_A - ARBPL | Work center | ||
| 75 | RCRHD_A - KTEXT | Short description | ||
| 76 | RCRHD_A - WERKS | Plant | ||
| 77 | RKAKO_A - KAPAR | Capacity category | ||
| 78 | RMCP2 - ANZNK | Number of decimal places | ||
| 79 | RMCP2 - MATNR | Material Number | ||
| 80 | RMCP2 - PEDVX | "From" period specification | ||
| 81 | RMCP2 - PEDVY | "To" period specification | ||
| 82 | RMCP2 - PERIV | Fiscal Year Variant | ||
| 83 | RMCP2 - PRGRP | Name of the product group | ||
| 84 | RMCP2 - VRSIO | Version number in the information structure | ||
| 85 | RMCP2 - VSNDA | Production version | ||
| 86 | RMCP2 - WERKS | Plant | ||
| 87 | SAUF - BEDID_1 | ID of the capacity requirements record | ||
| 88 | SAUF - BEDID_2 | ID of the capacity requirements record | ||
| 89 | SAUF - BEDID_3 | ID of the capacity requirements record | ||
| 90 | SAUF - BISDAT | Valid-to date | ||
| 91 | SAUF - DISPO | MRP controller | ||
| 92 | SAUF - FHORI | Scheduling Margin Key for Floats | ||
| 93 | SAUF - FNAME | Field name in the generated DDIC structure | ||
| 94 | SAUF - GSTRU | Generated DDIC table for LIS, conditions, messages | ||
| 95 | SAUF - MANDT | Client | ||
| 96 | SAUF - MATNR | Material Number | ||
| 97 | SAUF - MEINS | Base Unit of Measure | ||
| 98 | SAUF - MENGE | Production | ||
| 99 | SAUF - PERIV | Fiscal Year Variant | ||
| 100 | SAUF - PERKZ | Period indicator | ||
| 101 | SAUF - PLOBJ | Planning object | ||
| 102 | SAUF - SAFNR | SOP order number | ||
| 103 | SAUF - TRMER_1 | Scheduling error | ||
| 104 | SAUF - TRMER_2 | Scheduling error | ||
| 105 | SAUF - TRMER_3 | Scheduling error | ||
| 106 | SAUF - VAGRP | Responsible planner group/department | ||
| 107 | SAUF - VONDAT | Valid-From Date | ||
| 108 | SAUF - VRSIO | Version number in the information structure | ||
| 109 | SAUF - VSNDA | Production version | ||
| 110 | SAUF - WERKS | Plant | ||
| 111 | SYST - BATCH | ABAP System Field: Background Processing Active | ||
| 112 | SYST - DATLO | ABAP System Field: Local Date of Current User | ||
| 113 | SYST - MANDT | ABAP System Field: Client ID of Current User | ||
| 114 | SYST - MSGNO | ABAP System Field: Message Number | ||
| 115 | SYST - MSGTY | ABAP System Field: Message Type | ||
| 116 | SYST - TABIX | ABAP System Field: Row Index of Internal Tables | ||
| 117 | SYST - UCOMM | ABAP System Field: PAI-Triggering Function Code | ||
| 118 | T001W - FABKL | Factory calendar key | ||
| 119 | T445A - BASME | Base Unit of Measure | ||
| 120 | T445A - GSTRU | Generated DDIC table for LIS, conditions, messages | ||
| 121 | T445A - STFNA | Key figure for capacity planning | ||
| 122 | T445A - STWAE | Statistics currency | ||
| 123 | TC04 - CSLID | CIM selection indicator for alternatives | ||
| 124 | TCX00 - APLS1 | Selection ID (detailed planning) | ||
| 125 | TCX00 - APLS2 | Selection ID (rate-based planning) | ||
| 126 | TCX00 - APLS3 | Selection ID (rough-cut planning) | ||
| 127 | TCX00 - VAGRP | Production Supervisor | ||
| 128 | TCX00 - WERKS | Plant | ||
| 129 | TMC4 - GSTRU | Generated DDIC table for LIS, conditions, messages | ||
| 130 | VESOP - C | Matrix column | ||
| 131 | VESOP - V | Matrix element value |