Table/Structure Field list used by SAP ABAP Program MJR11FOB (IS-M: CUA Forms (Sample PGM))
SAP ABAP Program
MJR11FOB (IS-M: CUA Forms (Sample PGM)) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | INRI - OBJECT | Name of number range object | ||
| 2 | INRI - RETURNCODE | Return code | ||
| 3 | JRTROU1 - BELADEST | IS-M: Loading Point at Plant | ||
| 4 | JRTROU1 - PLANKUNFLT | Planned arrival time for truck route (last loading/unl.pt) | ||
| 5 | JRTROU1 - PLANKUNFTZ | Planned arrival time for truck route (first loading/unl.pt) | ||
| 6 | JRTROU1 - PLBELADEDA | Planned loading time for truck route | ||
| 7 | JRTROU1 - PLBEREITZT | Planned Standby Time for Truck Route | ||
| 8 | JRTROU1 - PLFAHRTDA | Planned duration of truck route | ||
| 9 | JRTROU1 - PLLASTEINH | Unit of measure for planned loaded running distance | ||
| 10 | JRTROU1 - PLLASTENTF | Planned loaded running distance for truck route | ||
| 11 | JRTROU1 - PLLEEREINH | Unit of measure for planned empty running distance | ||
| 12 | JRTROU1 - PLLEERENTF | Planned empty running distance | ||
| 13 | JRTROU1 - PLRKZEIT | Planned return time of truck route (loading point) | ||
| 14 | JRTROU1 - PLSTARTZ | Planned starting time of truck route | ||
| 15 | JRTROU1 - ROUTART | Truck route type | ||
| 16 | JRTROU1 - XPLANK1AT | Planned arrival (1st position) on date of circ.planning | ||
| 17 | JRTROU1 - XPLANK1FT | Planned arrival (1st position) on day after circ.planning | ||
| 18 | JRTROU1 - XPLANK1VT | Planned arrival (1st position) on day before circ.planning | ||
| 19 | JRTROU1 - XPLANKLAAT | Planned arrival (last position) on date of circ.planning | ||
| 20 | JRTROU1 - XPLANKLAFT | Planned arrival (last position) on day after circ.planning | ||
| 21 | JRTROU1 - XPLANKLAVT | Planned arrival (last position) on day before circ.planning | ||
| 22 | JRTROU1 - XPLBERZAT | Time specified refers to circulation planning date | ||
| 23 | JRTROU1 - XPLBERZFT | Time specified refers to day after planning | ||
| 24 | JRTROU1 - XPLBERZVT | Time specified refers to day before planning | ||
| 25 | JRTROU1 - XPLRKZAT | Planned return on planning day | ||
| 26 | JRTROU1 - XPLRKZFT | Planned return on day after planning | ||
| 27 | JRTROU1 - XPLRKZVT | Planned return on day before planning | ||
| 28 | JRTROU1 - XPLSTARTAT | Planned start on planning date | ||
| 29 | JRTROU1 - XPLSTARTFT | Planned start on day after planning | ||
| 30 | JRTROU1 - XPLSTARTVT | Planned start time on day before shipping date | ||
| 31 | JRTROU2 - ENTFERNKAT | Distance Category (for Settlement) | ||
| 32 | JRTROU2 - GEWICHTKL | Weight Class | ||
| 33 | JRTROU2 - ROUKATE1 | IS-M: Truck route settlement category type 1 | ||
| 34 | JRTROU2 - ROUKATE2 | IS-M: Truck route settlement category 2 | ||
| 35 | JRTROU2 - ROUKATE3 | IS-M: Truck route settlement category type 3 | ||
| 36 | JRTROU2 - ROUKATE4 | IS-M: Truck route settlement category type 4 | ||
| 37 | JRTROU2 - ROUKATE5 | IS-M: Truck route category type 5 | ||
| 38 | JRTROU2 - SCHLKAT | Key category (for settlement) | ||
| 39 | JRTROU3 - PERREGEL | Frequency rule | ||
| 40 | JRTROU6 - IANKUNFLT | Actual Arrival Time for Truck Route (at Last Loading/Unl.Pt) | ||
| 41 | JRTROU6 - IANKUNFTZ | Actual Arrival Time for Truck Route (at First Load./Unl.Pt) | ||
| 42 | JRTROU6 - IBELADEDA | Actual Loading Time for Truck Route | ||
| 43 | JRTROU6 - IBEREITZT | Actual Standby Time for Truck Route | ||
| 44 | JRTROU6 - IFAHRTDA | Actual Run Time for Truck Route | ||
| 45 | JRTROU6 - ILASTEINH | Unit of Measure for Actual Loaded Running Distance | ||
| 46 | JRTROU6 - ILASTENTF | Actual Loaded Running Distance for Truck Route | ||
| 47 | JRTROU6 - ILEEREINH | Unit of Measure for Actual Empty Running Distance | ||
| 48 | JRTROU6 - ILEERENTF | Actual Empty Running Distance for Truck Route | ||
| 49 | JRTROU6 - IRKZEIT | Actual Return Time of Truck Route (to Loading Point) | ||
| 50 | JRTROU6 - ISTARTZ | Actual Truck Route Starting Time | ||
| 51 | JRTROU6 - XIANK1AT | Actual arrival (at first point) on planning date | ||
| 52 | JRTROU6 - XIANK1FT | Actual arrival (at first point) on day after planning | ||
| 53 | JRTROU6 - XIANK1VT | Actual arrival (at first point) on day before planning | ||
| 54 | JRTROU6 - XIANKLAAT | Actual arrival (at last point) on planning date | ||
| 55 | JRTROU6 - XIANKLAFT | Actual arrival (at last point) on day after planning | ||
| 56 | JRTROU6 - XIANKLAVT | Actual arrival (at last point) on day before planning | ||
| 57 | JRTROU6 - XIBERZAT | Time specified refers to circulation planning date | ||
| 58 | JRTROU6 - XIBERZFT | Time specified refers to day after planning | ||
| 59 | JRTROU6 - XIBERZVT | Time specified refers to day before planning | ||
| 60 | JRTROU6 - XIRKZAT | Actual return time on planning date | ||
| 61 | JRTROU6 - XIRKZFT | Actual return on day after planning | ||
| 62 | JRTROU6 - XIRKZVT | Actual return time on day before planning | ||
| 63 | JRTROU6 - XISTARTAT | Actual starting time on planning date | ||
| 64 | JRTROU6 - XISTARTFT | Actual starting time on day after planning | ||
| 65 | JRTROU6 - XISTARTVT | Actual starting time on day before planning | ||
| 66 | JRTROUBEA - ROUTE | Truck Route - Media | ||
| 67 | JRTROUHIE - HTYPROUT | Route Hierarchy Type | ||
| 68 | JRTROUHIE - ROUTEUEB | Higher Level Truck Route | ||
| 69 | JRTROUHIE - ROUTEUNT | Truck Route - Media | ||
| 70 | JRTROUTE - BELADEST | IS-M: Loading Point at Plant | ||
| 71 | JRTROUTE - ROUTE | Truck Route - Media | ||
| 72 | JRTROUTE - ROUTENTYP | IS-M: Truck route category | ||
| 73 | JRTRVPOS - LADHILFDA | Arranged time for loading assistant | ||
| 74 | JRTRVPOS - VERKMITART | Vehicle | ||
| 75 | JRTRVPOS - WARTEDAUER | Agreed waiting time | ||
| 76 | JRTTROUTE - AENDATE | Date of Last Change | ||
| 77 | JRTTROUTE - AENTIME | Time of Last Change | ||
| 78 | JRTTROUTE - AENUSER | Last Changed By | ||
| 79 | JRTTROUTE - BELADEST | IS-M: Loading Point at Plant | ||
| 80 | JRTTROUTE - DISPODAT | IS-M: Shipping Date | ||
| 81 | JRTTROUTE - ENTFERNKAT | Distance Category (for Settlement) | ||
| 82 | JRTTROUTE - ERFDATE | Created On | ||
| 83 | JRTTROUTE - ERFTIME | Time Created | ||
| 84 | JRTTROUTE - ERFUSER | Created By | ||
| 85 | JRTTROUTE - GEWICHTKL | Weight Class | ||
| 86 | JRTTROUTE - IANKUNFLT | Actual Arrival Time for Truck Route (at Last Loading/Unl.Pt) | ||
| 87 | JRTTROUTE - IANKUNFTZ | Actual Arrival Time for Truck Route (at First Load./Unl.Pt) | ||
| 88 | JRTTROUTE - IBELADEDA | Actual Loading Time for Truck Route | ||
| 89 | JRTTROUTE - IBEREITZT | Actual Standby Time for Truck Route | ||
| 90 | JRTTROUTE - IFAHRTDA | Actual Run Time for Truck Route | ||
| 91 | JRTTROUTE - ILASTEINH | Unit of Measure for Actual Loaded Running Distance | ||
| 92 | JRTTROUTE - ILASTENTF | Actual Loaded Running Distance for Truck Route | ||
| 93 | JRTTROUTE - ILEEREINH | Unit of Measure for Actual Empty Running Distance | ||
| 94 | JRTTROUTE - ILEERENTF | Actual Empty Running Distance for Truck Route | ||
| 95 | JRTTROUTE - IRKZEIT | Actual Return Time of Truck Route (to Loading Point) | ||
| 96 | JRTTROUTE - ISTARTZ | Actual Truck Route Starting Time | ||
| 97 | JRTTROUTE - IVKMITART | Actual Vehicle | ||
| 98 | JRTTROUTE - KURZTEXT | IS-M: Short Text | ||
| 99 | JRTTROUTE - LADHILFDA | Actual Time for Loading Assistant | ||
| 100 | JRTTROUTE - LANGTEXT | IS-M: Long Text | ||
| 101 | JRTTROUTE - PERREGEL | Frequency rule | ||
| 102 | JRTTROUTE - PLANKUNFLT | Planned arrival time for truck route (last loading/unl.pt) | ||
| 103 | JRTTROUTE - PLANKUNFTZ | Planned arrival time for truck route (first loading/unl.pt) | ||
| 104 | JRTTROUTE - PLBELADEDA | Planned loading time for truck route | ||
| 105 | JRTTROUTE - PLBEREITZT | Planned Standby Time for Truck Route | ||
| 106 | JRTTROUTE - PLFAHRTDA | Planned duration of truck route | ||
| 107 | JRTTROUTE - PLLASTEINH | Unit of measure for planned loaded running distance | ||
| 108 | JRTTROUTE - PLLASTENTF | Planned loaded running distance for truck route | ||
| 109 | JRTTROUTE - PLLEEREINH | Unit of measure for planned empty running distance | ||
| 110 | JRTTROUTE - PLLEERENTF | Planned empty running distance | ||
| 111 | JRTTROUTE - PLRKZEIT | Planned return time of truck route (loading point) | ||
| 112 | JRTTROUTE - PLSTARTZ | Planned starting time of truck route | ||
| 113 | JRTTROUTE - ROUKATE1 | IS-M: Truck route settlement category type 1 | ||
| 114 | JRTTROUTE - ROUKATE2 | IS-M: Truck route settlement category 2 | ||
| 115 | JRTTROUTE - ROUKATE3 | IS-M: Truck route settlement category type 3 | ||
| 116 | JRTTROUTE - ROUKATE4 | IS-M: Truck route settlement category type 4 | ||
| 117 | JRTTROUTE - ROUKATE5 | IS-M: Truck route category type 5 | ||
| 118 | JRTTROUTE - ROUTART | Truck route type | ||
| 119 | JRTTROUTE - ROUTE | Truck Route - Media | ||
| 120 | JRTTROUTE - ROUTENTYP | IS-M: Truck route category | ||
| 121 | JRTTROUTE - SCHLKAT | Key category (for settlement) | ||
| 122 | JRTTROUTE - SPLITT_JA | IS-M: Split indicator for truck route split | ||
| 123 | JRTTROUTE - WARTEDAUER | Actual Waiting Time | ||
| 124 | JRTTROUTE - XGENMASCH | Indicator: Object generated automatically | ||
| 125 | JRTTROUTE - XIANK1AT | Actual arrival (at first point) on planning date | ||
| 126 | JRTTROUTE - XIANK1FT | Actual arrival (at first point) on day after planning | ||
| 127 | JRTTROUTE - XIANK1VT | Actual arrival (at first point) on day before planning | ||
| 128 | JRTTROUTE - XIANKLAAT | Actual arrival (at last point) on planning date | ||
| 129 | JRTTROUTE - XIANKLAFT | Actual arrival (at last point) on day after planning | ||
| 130 | JRTTROUTE - XIANKLAVT | Actual arrival (at last point) on day before planning | ||
| 131 | JRTTROUTE - XIBERZAT | Time specified refers to circulation planning date | ||
| 132 | JRTTROUTE - XIBERZFT | Time specified refers to day after planning | ||
| 133 | JRTTROUTE - XIBERZVT | Time specified refers to day before planning | ||
| 134 | JRTTROUTE - XIRKZAT | Actual return time on planning date | ||
| 135 | JRTTROUTE - XIRKZFT | Actual return on day after planning | ||
| 136 | JRTTROUTE - XIRKZVT | Actual return time on day before planning | ||
| 137 | JRTTROUTE - XISTARTAT | Actual starting time on planning date | ||
| 138 | JRTTROUTE - XISTARTFT | Actual starting time on day after planning | ||
| 139 | JRTTROUTE - XISTARTVT | Actual starting time on day before planning | ||
| 140 | JRTTROUTE - XPLANK1AT | Planned arrival (1st position) on date of circ.planning | ||
| 141 | JRTTROUTE - XPLANK1FT | Planned arrival (1st position) on day after circ.planning | ||
| 142 | JRTTROUTE - XPLANK1VT | Planned arrival (1st position) on day before circ.planning | ||
| 143 | JRTTROUTE - XPLANKLAAT | Planned arrival (last position) on date of circ.planning | ||
| 144 | JRTTROUTE - XPLANKLAFT | Planned arrival (last position) on day after circ.planning | ||
| 145 | JRTTROUTE - XPLANKLAVT | Planned arrival (last position) on day before circ.planning | ||
| 146 | JRTTROUTE - XPLBERZAT | Time specified refers to circulation planning date | ||
| 147 | JRTTROUTE - XPLBERZFT | Time specified refers to day after planning | ||
| 148 | JRTTROUTE - XPLBERZVT | Time specified refers to day before planning | ||
| 149 | JRTTROUTE - XPLRKZAT | Planned return on planning day | ||
| 150 | JRTTROUTE - XPLRKZFT | Planned return on day after planning | ||
| 151 | JRTTROUTE - XPLRKZVT | Planned return on day before planning | ||
| 152 | JRTTROUTE - XPLSTARTAT | Planned start on planning date | ||
| 153 | JRTTROUTE - XPLSTARTFT | Planned start on day after planning | ||
| 154 | JRTTROUTE - XPLSTARTVT | Planned start time on day before shipping date | ||
| 155 | JYTBEZEICH - KURZTEXT | IS-M: Short Text | ||
| 156 | JYTBEZEICH - LANGTEXT | IS-M: Long Text | ||
| 157 | JYTUSE2 - AENDATE | Date of Last Change | ||
| 158 | JYTUSE2 - AENTIME | Time of Last Change | ||
| 159 | JYTUSE2 - AENUSER | Last Changed By | ||
| 160 | JYTUSE2 - ERFDATE | Created On | ||
| 161 | JYTUSE2 - ERFTIME | Time Created | ||
| 162 | JYTUSE2 - ERFUSER | Created By | ||
| 163 | RJLR1001 - JAHR | Year stored | ||
| 164 | RJLR1001 - TROUTE | Route | ||
| 165 | RJMR11 - IKFZ_BEZ | IS-M: Short Text | ||
| 166 | RJMR11 - ILAEH_BEZ | IS-M: Short text for units of measure | ||
| 167 | RJMR11 - ILEEH_BEZ | IS-M: Short text for units of measure | ||
| 168 | RJMR11 - KFZ_BEZ | IS-M: Short Text | ||
| 169 | RJMR11 - PLLAEH_BEZ | IS-M: Short text for units of measure | ||
| 170 | RJMR11 - PLLEEH_BEZ | IS-M: Short text for units of measure | ||
| 171 | SCREEN - GROUP1 | SCREEN-GROUP1 | ||
| 172 | SCREEN - INPUT | SCREEN-INPUT | ||
| 173 | SCREEN - NAME | SCREEN-NAME | ||
| 174 | SVAL - FIELDNAME | Field Name | ||
| 175 | SVAL - FIELDTEXT | Medium Field Label | ||
| 176 | SVAL - FIELD_OBL | Required field flag | ||
| 177 | SVAL - TABNAME | Table Name | ||
| 178 | SVAL - VALUE | Table field value | ||
| 179 | SYST - DATUM | ABAP System Field: Current Date of Application Server | ||
| 180 | SYST - DBCNT | ABAP System Field: Edited Database Table Rows | ||
| 181 | SYST - LANGU | ABAP System Field: Language Key of Text Environment | ||
| 182 | SYST - TABIX | ABAP System Field: Row Index of Internal Tables | ||
| 183 | SYST - TCODE | ABAP System Field: Current Transaction Code | ||
| 184 | T006A - MSEHT | Unit of Measurement Text (Maximum 10 Characters) | ||
| 185 | TJ180 - TRTYP | Transaction type | ||
| 186 | TJR02 - ROUTARTBEZ | IS-M: General Description of Objects (Length 30) | ||
| 187 | TJR22 - BEZEI | IS-M: General Description of Objects (Length 30) | ||
| 188 | TJR24 - BEZEI | IS-M: General Description of Objects (Length 30) | ||
| 189 | TJR26 - BEZEI | IS-M: General Description of Objects (Length 30) | ||
| 190 | TJR28 - BEZEI | IS-M: General Description of Objects (Length 30) | ||
| 191 | TJR30 - BEZEI | IS-M: General Description of Objects (Length 30) | ||
| 192 | TJR32 - BEZEI | IS-M: General Description of Objects (Length 30) | ||
| 193 | TJR34 - BEZEI | IS-M: General Description of Objects (Length 30) | ||
| 194 | TJR36 - BEZEI | IS-M: General Description of Objects (Length 30) | ||
| 195 | TJR40 - KURZTEXT | IS-M: Short Text | ||
| 196 | TJY00 - BASISSPR | Basic Language for Text Display |