Table/Structure Field list used by SAP ABAP Program LSP01F37 (LSP01F37)
SAP ABAP Program LSP01F37 (LSP01F37) is using
# Object Type Object Name Object Description Note
     
1 Table/Structure Field  ASP00 - CBETI Start time for period of examination
2 Table/Structure Field  ASP00 - CENDA End date of the period of examination
3 Table/Structure Field  ASP00 - CENTI End time for period of examination
4 Table/Structure Field  ASP00 - PDURA Dispatching period in days
5 Table/Structure Field  ASP00 - PPCAL Planning Calendar for Sequencing
6 Table/Structure Field  ASP00 - PPERI Planning period
7 Table/Structure Field  ASP00 - CBEDA Start date of the period of examination
8 Table/Structure Field  CRHD - KAPID Capacity ID
9 Table/Structure Field  CRHD - OBJID Object ID of the resource
10 Table/Structure Field  KAKO - KAPID Capacity ID
11 Table/Structure Field  LDLBH - LRATE Planned rate for production line
12 Table/Structure Field  LDLH - LNID Object ID of the resource
13 Table/Structure Field  LDLH - LUNIT Unit of measure for rates
14 Table/Structure Field  LDLHD - LNID Object ID of the resource
15 Table/Structure Field  LDLP - BUFFER Indicator for buffer before line segment
16 Table/Structure Field  LDLP - LNSID Object ID of the resource
17 Table/Structure Field  LDLPD - KAPID Capacity ID
18 Table/Structure Field  LDLPD - TAKTSD Number of takts
19 Table/Structure Field  LDLPD - LNSID Object ID of the resource
20 Table/Structure Field  LDLPD - BUFFER Indicator for buffer before line segment
21 Table/Structure Field  LDLT - LD_TKZTI Takt time (in seconds)
22 Table/Structure Field  MDFE - MNG01 Quantity received or quantity required
23 Table/Structure Field  PLAF - MATNR Planning material
24 Table/Structure Field  PROBLEM - FIRMED Planning Period is Firmed (No Repeat Dispatching)
25 Table/Structure Field  PROBLEM - W_ENDTIME End of period: working time
26 Table/Structure Field  PROBLEM - W_ENDDATE End of period: working time
27 Table/Structure Field  PROBLEM - W_BEGINTIME Start of period: working time
28 Table/Structure Field  PROBLEM - W_BEGINDATE End of period: working time
29 Table/Structure Field  PROBLEM - SUCC Object ID of the resource
30 Table/Structure Field  PROBLEM - SPGRP Production Smoothing: Dispatch Same Materials Together
31 Table/Structure Field  PROBLEM - REPLAN Replan Planning Period (Explicit Request LAS4)
32 Table/Structure Field  PROBLEM - OBJID Object ID of the resource
33 Table/Structure Field  PROBLEM - NW_BEGINTIME Start of period: non-working time
34 Table/Structure Field  PROBLEM - NW_BEGINDATE Start of period: non-working time
35 Table/Structure Field  PROBLEM - KAPID Capacity ID
36 Table/Structure Field  PROBLEM - HORIZON Horizon Assignment of Planning Period
37 Table/Structure Field  PROBLEM - DISTR Production Smoothing: Equally Distributed Dispatching
38 Table/Structure Field  PROBLEM - CLOAD Production Smoothing: Planned Maximum Capacity Utilization
39 Table/Structure Field  PROBLEM - BUFFER Indicator for buffer before line segment
40 Table/Structure Field  PROBLEM - AVAIL_TIME Time available
41 Table/Structure Field  PROBLEM - AVAIL_QTY_OP Operative quantity
42 Table/Structure Field  PROBLEM - AVAIL_QTY_MAX Maximum quantity
43 Table/Structure Field  PROBLEM - ALGOR Process
44 Table/Structure Field  PROBLEM - NTAKTAREA Number of takts
45 Table/Structure Field  SYST - TABIX ABAP System Field: Row Index of Internal Tables
46 Table/Structure Field  SYST - MSGTY ABAP System Field: Message Type
47 Table/Structure Field  SYST - MSGNO ABAP System Field: Message Number
48 Table/Structure Field  SYST - MSGID ABAP System Field: Message ID
49 Table/Structure Field  SYSUUID - C UUID in character form
50 Table/Structure Field  T001W - WERKS Plant
51 Table/Structure Field  TSPP0 - PAUTO Repeated automatic dispatching
52 Table/Structure Field  TSPP0 - PERI_FIRM Number of Additional Fixed Planning Periods
53 Table/Structure Field  TSPP1 - ALGOR Process
54 Table/Structure Field  TSPP1 - CLOAD Production Smoothing: Planned Maximum Capacity Utilization
55 Table/Structure Field  TSPP1 - DISTR Production Smoothing: Equally Distributed Dispatching
56 Table/Structure Field  TSPP1 - SPGRP Production Smoothing: Dispatch Same Materials Together
57 Table/Structure Field  TSTRTOUCHS - BEGIN_DATE Time stream: Start of period in local date
58 Table/Structure Field  TSTRTOUCHS - BEGIN_TIME Time stream: Start of period in local time
59 Table/Structure Field  TSTRTOUCHS - END_DATE Time stream: End of period in local date
60 Table/Structure Field  TSTRTOUCHS - END_TIME Time stream: End of period in local time