Table/Structure Field list used by SAP ABAP Program LPROJIFI01 (Include LPROJIFI01)
SAP ABAP Program
LPROJIFI01 (Include LPROJIFI01) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | BALMI - MSGNO | Message Number | ||
| 2 | BALMI - MSGTY | Message Type | ||
| 3 | BALMI - MSGV1 | Message Variable | ||
| 4 | BALMI - MSGV2 | Message Variable | ||
| 5 | BALMI - MSGV3 | Message Variable | ||
| 6 | BALMI - MSGV4 | Message Variable | ||
| 7 | BALMI - MSGID | Message Class | ||
| 8 | DOCID_EXT - DOC_KIND | Document Type | ||
| 9 | MKAL - VERID | Production Version | ||
| 10 | PFOCID - PFGUID | Internal Identification of Focus Record | ||
| 11 | PFOCID - ENTRYID | Internal Identification for PVS Objects | ||
| 12 | PFOCID_DYNP - PFNAME | iPPE Focus Master Record | ||
| 13 | PPEPSIF_PVSDYNP - LOCATION | Plant | ||
| 14 | PPE_PSIF01 - PSPNR_HIGH | WBS Element | ||
| 15 | PPE_PSIF01 - WERKS | Plant | ||
| 16 | PPE_PSIF01 - PSPNR_LOW | WBS Element | ||
| 17 | PPE_PSIF01 - PSPID | Project definition | ||
| 18 | PPE_PSIF01 - PRONR | Internal number for project definition | ||
| 19 | PPE_PSIF01 - POSID_LOW | Work Breakdown Structure Element (WBS Element) | ||
| 20 | PPE_PSIF01 - POSID_HIGH | Work Breakdown Structure Element (WBS Element) | ||
| 21 | PPE_PSIF01 - NPLNR_HIGH | Network number | ||
| 22 | PPE_PSIF01 - KOKRS | Controlling Area | ||
| 23 | PPE_PSIF01 - FLG_RESOURCE | Checkbox | ||
| 24 | PPE_PSIF01 - FLG_PVS | Checkbox | ||
| 25 | PPE_PSIF01 - FLG_PROTOCOL | Generate Log | ||
| 26 | PPE_PSIF01 - FLG_FOKUS | Checkbox | ||
| 27 | PPE_PSIF01 - BDMNG | Requirement Quantity | ||
| 28 | PPE_PSIF01 - NPLNR_LOW | Network number | ||
| 29 | PROJ - PSPID | Project definition | ||
| 30 | PROJ - PSPNR | Current number for project or project item | ||
| 31 | PROJ - VKOKR | Controlling area for the project | ||
| 32 | PROJ2_INC - VKOKR | Controlling area for the project | ||
| 33 | PROJ_INC - PSPID | Project definition | ||
| 34 | PROJ_INC - VKOKR | Controlling area for the project | ||
| 35 | PRPS - POSID | Work Breakdown Structure Element (WBS Element) | ||
| 36 | PRPS - PSPNR | WBS Element | ||
| 37 | PRPS - PSPHI | Current number of the appropriate project | ||
| 38 | PRPS - PKOKR | Controlling area for WBS element | ||
| 39 | PRPS2_INC - PKOKR | Controlling area for WBS element | ||
| 40 | PRPS_INC - PKOKR | Controlling area for WBS element | ||
| 41 | PRPS_INC - POSID | Work Breakdown Structure Element (WBS Element) | ||
| 42 | PRPS_INC - PSPHI | Current number of the appropriate project | ||
| 43 | PVCMPD - QUANT | Quantity (in Component Variant) | ||
| 44 | PVCMPD - QUNIT | Unit of Measure | ||
| 45 | PVCMPDD - QUANT | Quantity (in Component Variant) | ||
| 46 | PVCMPDD - QUNIT | Unit of Measure | ||
| 47 | SCXTAB_CONTROL - CURRENT_LINE | SCXTAB_CONTROL-CURRENT_LINE | ||
| 48 | SYST - TABIX | ABAP System Field: Row Index of Internal Tables | ||
| 49 | T418 - POSTP | Item category (bill of material) | ||
| 50 | TECS - TECHS | Parameter Variant/Standard Variant |