Table/Structure Field list used by SAP ABAP Program LM61DF20 (Include: Routines for Capacity Leveling - Internal Table Management)
SAP ABAP Program
LM61DF20 (Include: Routines for Capacity Leveling - Internal Table Management) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | CYAFKO_TAB - AUFNR | Order Number | ||
| 2 | CYAFKO_TAB - FUNKTION1 | Function to be carried out for object "order master data" | ||
| 3 | CYAFKO_TAB - FUNKTION2 | Function to be carried out for object "order master data" | ||
| 4 | CYAFKO_TAB - FUNKTION3 | Function to be carried out for object "order master data" | ||
| 5 | CYAFKO_TAB - FUNKTION4 | Function to be carried out for object "order master data" | ||
| 6 | CYAFKO_TAB - INDEX | Index to object "order master data" | ||
| 7 | CYAFKO_TAB - MANDT | Client | ||
| 8 | CYBEDINF - AUFNR | Order Number | ||
| 9 | CYBED_GRU - CHART | Number of chart | ||
| 10 | CYBED_GRU - FELD | Field according to which groupings are made | ||
| 11 | CYBED_GRU - GRUPPE | Requirements group | ||
| 12 | CYBED_GRU - INDEX | Index to related object (e.g. index to capacity) | ||
| 13 | CYBED_GRU - KOMBI | Combination within a requirements group | ||
| 14 | CYBED_GRU - STRUKTUR | Structure used to define grouping | ||
| 15 | CYBED_GRU - WERT | Value of the field according to which items are grouped | ||
| 16 | CYCRHD_TAB - FUNKTION1 | Function to be carried for object "work center" | ||
| 17 | CYCRHD_TAB - FUNKTION2 | Function to be carried for object "work center" | ||
| 18 | CYCRHD_TAB - FUNKTION3 | Function to be carried for object "work center" | ||
| 19 | CYCRHD_TAB - FUNKTION4 | Function to be carried for object "work center" | ||
| 20 | CYCRHD_TAB - INDEX | Index for object "work center" | ||
| 21 | CYCRHD_TAB - MANDT | Client | ||
| 22 | CYCRHD_TAB - OBJID | Object ID of the resource | ||
| 23 | CYCRHD_TAB - OBJTY | Object types of the CIM resource | ||
| 24 | CYCRPANPRO - CAPUNIT | Unit of of measure for displaying capacity requirements | ||
| 25 | CYCRPANPRO - UNITSOURCE | Origin of unit of measure for available cap. and cap.reqmts | ||
| 26 | CYFIL_TAB - FELD | Filter field (field whose value should be selected) | ||
| 27 | CYFIL_TAB - FILGRU | Filter group | ||
| 28 | CYFIL_TAB - HIGH | Value to (upper value to be filtered) | ||
| 29 | CYFIL_TAB - LOW | Lower limit of the interval for filtering | ||
| 30 | CYFIL_TAB - OPTION | Relational Operator | ||
| 31 | CYFIL_TAB - SIGN | Inclusive/Exclusive Condition | ||
| 32 | CYPER_BED - AENKZ | Change indicator | ||
| 33 | CYPER_BED - ANGEAKT | Current available capacity | ||
| 34 | CYPER_BED - BEDAKT | Remaining capacity requirements for period | ||
| 35 | CYPER_BED - GRUPPE | Requirements group | ||
| 36 | CYPER_BED - INDPER_TAB | Index to period table "PER_TAB" | ||
| 37 | CYPER_BED - KOMBI | Combination within a requirements group | ||
| 38 | CYPER_EIN - AENKZ | Change indicator | ||
| 39 | CYPER_EIN - GRUPPE | Requirements group | ||
| 40 | CYPER_EIN - INDEX_BED | Index referring to pegged requirement | ||
| 41 | CYPER_EIN - INDPER_TAB | Index to period table "PER_TAB" | ||
| 42 | CYPER_EIN - KOMBI | Combination within a requirements group | ||
| 43 | CYPER_EIN - STRUKTUR | Structure which have caused the requirement (e.g.KBED) | ||
| 44 | CYPER_TAB - DATVON | Date from (start of the period) | ||
| 45 | CYPLAF_TAB - FUNKTION1 | Function to be carried out for object "planned order" | ||
| 46 | CYPLAF_TAB - FUNKTION2 | Function to be carried out for object "planned order" | ||
| 47 | CYPLAF_TAB - FUNKTION3 | Function to be carried out for object "planned order" | ||
| 48 | CYPLAF_TAB - FUNKTION4 | Function to be carried out for object "planned order" | ||
| 49 | CYPLAF_TAB - INDEX | Index to object: planned order | ||
| 50 | CYPLAF_TAB - MANDT | Client | ||
| 51 | CYPLAF_TAB - PLNUM | Planned order number | ||
| 52 | KAKO - KALID | Factory calendar ID | ||
| 53 | KAKO - KAPAR | Capacity category | ||
| 54 | KAKO - MEINS | Base Unit of Measurement for Capacity | ||
| 55 | KAKO - NAME | Capacity name | ||
| 56 | KAKO_RE - ARBPL | Work center | ||
| 57 | KAKO_RE - KALID | Factory calendar ID | ||
| 58 | KAKO_RE - KAPAR | Capacity category | ||
| 59 | KAKO_RE - KAPTX | Capacity short text | ||
| 60 | KAKO_RE - KINDX | Index to related object (e.g. index to capacity) | ||
| 61 | KAKO_RE - KNAME | Capacity name | ||
| 62 | KAKO_RE - MEINS | Base Unit of Measurement for Capacity | ||
| 63 | KAKO_RE - OBJID | Object ID of the resource | ||
| 64 | KBED - KAPID | Capacity ID | ||
| 65 | KBED - PLNUM | Planned order number | ||
| 66 | KBED - TYPKZ | Type of object causing the load (order category) | ||
| 67 | KBEDD - AUFNR | Order Number | ||
| 68 | KBEDD - KAPID | Capacity ID | ||
| 69 | KBEDD - PLNUM | Planned order number | ||
| 70 | KBEDI - KAPID | Capacity ID | ||
| 71 | KBEDI - PLNUM | Planned order number | ||
| 72 | KBEDI - TYPKZ | Type of object causing the load (order category) | ||
| 73 | KBED_ITAB - INDEX_KBED | Index referring to ops. in rec'd tab. for cap. requirements | ||
| 74 | M61D_CRHD - CINDX | Index to related object (e.g. index to capacity) | ||
| 75 | MARC - WERKS | Plant | ||
| 76 | MDFLI - LINIE | Work center | ||
| 77 | MDFLI - OBJID | Object ID of the resource | ||
| 78 | MT61D - DISPO | MRP controller | ||
| 79 | MT61D - MATNR | Material Number | ||
| 80 | MT61D - MEINS | Base Unit of Measure | ||
| 81 | MT61D - WERKS | Plant | ||
| 82 | PLAF - BEDID | ID of the capacity requirements record | ||
| 83 | PLAF - DISPO | MRP controller | ||
| 84 | PLAF - GROID | Index for rough scheduling results | ||
| 85 | PLAF - MANDT | Client | ||
| 86 | PLAF - MATNR | Planning material | ||
| 87 | PLAF - MEINS | Base Unit of Measure | ||
| 88 | PLAF - PLNUM | Planned order number | ||
| 89 | PLAF - PLWRK | Planning Plant | ||
| 90 | PLAF - RATID | Index for the results of scheduling production rates | ||
| 91 | PLKO - ARBID | Work center group with planning function | ||
| 92 | PLKOB - ARBID | Work center group with planning function | ||
| 93 | PLSC - FIXEL | Long-term planning: include firmed issues and receipts | ||
| 94 | PLSC - PLSCN | Planning Scenario of Long-Term Planning | ||
| 95 | RCPSE - SCHED_TYPE | Scheduling level | ||
| 96 | REM_OUTKA - ARBPL | Work center | ||
| 97 | REM_OUTKA - DATUM | Date of the available capacity or capacity requirements | ||
| 98 | REM_OUTKA - KABED | Available capacity | ||
| 99 | REM_OUTKA - KAGEB | Total capacity requirement for a production line | ||
| 100 | REM_OUTKA - KPART | Capacity category | ||
| 101 | REM_OUTKA - OBJID | Object ID of the resource | ||
| 102 | RF61D - STYPE | Scheduling level | ||
| 103 | RKAKO_A - KALID | Factory calendar ID | ||
| 104 | RKAKO_A - KAPAR | Capacity category | ||
| 105 | RKAKO_A - KTEXT | Capacity short text | ||
| 106 | RKAKO_A - MEINS | Base Unit of Measurement for Capacity | ||
| 107 | RKAKO_A - NAME | Capacity name | ||
| 108 | SYST - MANDT | ABAP System Field: Client ID of Current User | ||
| 109 | SYST - MSGID | ABAP System Field: Message ID | ||
| 110 | SYST - MSGNO | ABAP System Field: Message Number | ||
| 111 | SYST - MSGTY | ABAP System Field: Message Type | ||
| 112 | SYST - MSGV1 | ABAP System Field: Message Variable | ||
| 113 | SYST - MSGV2 | ABAP System Field: Message Variable | ||
| 114 | SYST - MSGV3 | ABAP System Field: Message Variable | ||
| 115 | SYST - MSGV4 | ABAP System Field: Message Variable | ||
| 116 | SYST - TABIX | ABAP System Field: Row Index of Internal Tables |