Table/Structure Field list used by SAP ABAP Program LCY23TOP (Include LCY23TOP)
SAP ABAP Program
LCY23TOP (Include LCY23TOP) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | AFVGD - SSAVZ | Latest scheduled start: Execution (time) | ||
| 2 | AFVGD - SSAVD | Latest scheduled start: Execution (date) | ||
| 3 | AFVGD - VORNR | Operation/Activity Number | ||
| 4 | AFVGI - VORNR | Operation/Activity Number | ||
| 5 | AFVVI - SSAVD | Latest scheduled start: Execution (date) | ||
| 6 | AFVVI - SSAVZ | Latest scheduled start: Execution (time) | ||
| 7 | CAUFVD - AUART | Order Type | ||
| 8 | CAUFVD - AUFNR | Order Number | ||
| 9 | CAUFVD - AUTYP | Order category | ||
| 10 | CAUFVD - DISPO | MRP controller for the order | ||
| 11 | CAUFVD - GLTRP | Basic finish date | ||
| 12 | CAUFVD - GLTRS | Scheduled finish | ||
| 13 | CAUFVD - GSTRP | Basic start date | ||
| 14 | CAUFVD - GSTRS | Scheduled start | ||
| 15 | CAUFVD - MATXT | Material description | ||
| 16 | CAUFVD - WERKS | Plant | ||
| 17 | CAUFVTAB - WERKS | Plant | ||
| 18 | CAUFVTAB - GSTRS | Scheduled start | ||
| 19 | CAUFVTAB - GSTRP | Basic start date | ||
| 20 | CAUFVTAB - GLTRS | Scheduled finish | ||
| 21 | CAUFVTAB - DISPO | MRP controller for the order | ||
| 22 | CAUFVTAB - AUTYP | Order category | ||
| 23 | CAUFVTAB - AUFNR | Order Number | ||
| 24 | CAUFVTAB - AUART | Order Type | ||
| 25 | CAUFVTAB - GLTRP | Basic finish date | ||
| 26 | COCAUFVINF - MATXT | Material description | ||
| 27 | CRHD - ARBPL | Work center | ||
| 28 | CRHD - OBJID | Object ID of the resource | ||
| 29 | CRHH - OBJID | Object ID of the resource | ||
| 30 | CYBED_GRU - INDEX | Index to related object (e.g. index to capacity) | ||
| 31 | CYBED_GRU - KOMBI | Combination within a requirements group | ||
| 32 | CYBED_GRU - GRUPPE | Requirements group | ||
| 33 | CYCRHD_TAB - FUNKTION1 | Function to be carried for object "work center" | ||
| 34 | CYFEHL_KAP - INDEX_BED | Index referring to pegged requirement | ||
| 35 | CYFIL_TAB - FILGRU | Filter group | ||
| 36 | CYPER_BED - EINHEIT | Unit of of measure for displaying capacity requirements | ||
| 37 | CYPER_BED - KOMBI | Combination within a requirements group | ||
| 38 | CYPER_EIN - INDEX_BED | Index referring to pegged requirement | ||
| 39 | CYPER_EIN - INDPER_TAB | Index to period table "PER_TAB" | ||
| 40 | CYPER_EIN - WERT | Requirement value (requirements belonging in the period) | ||
| 41 | CYREFS - CHARACTER | Dummy data element for reference structures | ||
| 42 | CYSEL_OBJ - INDEXAKT | Index to object | ||
| 43 | JEST - STAT | Object status | ||
| 44 | KAKO - KAPAR | Capacity category | ||
| 45 | KAKO - MEINS | Base Unit of Measurement for Capacity | ||
| 46 | KAKO - NAME | Capacity name | ||
| 47 | KAKO - UEBERLAST | Overload | ||
| 48 | KAKO - KALID | Factory calendar ID | ||
| 49 | KBED - AUFPL | Routing number of operations in the order | ||
| 50 | KBED - BSTKZ | Indicator rqmts.record is confirmed (cap.availability check) | ||
| 51 | KBED - FSTAD | Earliest start / date | ||
| 52 | KBED - FSTAU | Earliest start / time | ||
| 53 | KBEDD - AUFPL | Routing number of operations in the order | ||
| 54 | KBEDI - AUFPL | Routing number of operations in the order | ||
| 55 | KBEDI - BSTKZ | Indicator rqmts.record is confirmed (cap.availability check) | ||
| 56 | KBEDI - FSTAD | Earliest start / date | ||
| 57 | KBEDI - FSTAU | Earliest start / time | ||
| 58 | MARA - MATNR | Material Number | ||
| 59 | PLAF - PLNUM | Planned order number | ||
| 60 | RC65B - SEDAV | Start date for data base selection | ||
| 61 | RC65L - VERSCHIEB | Shift of start date (in work days) | ||
| 62 | RC65L - REQTOT | Capacity requirements within the planning period | ||
| 63 | RC65L - KZ_EINP | Indicator: Sufficient capacity to process op. in plan.period | ||
| 64 | RC65L - REQVER | Capacity rqmts. from planned order or works order in period | ||
| 65 | RF61D - AVAIL | Available capacity in a period | ||
| 66 | RF61D - OLOAD | Maximum capacity utilization for all periods | ||
| 67 | RF61D - OLTOT | Total capacity overload check | ||
| 68 | RF61D - PCTOT | Capacity utilization of the planning period (as percentage) | ||
| 69 | RF61D - PERIO | Period | ||
| 70 | RKAKO_A - KTEXT | Capacity short text | ||
| 71 | RKAKO_A - UEBERLAST | Overload | ||
| 72 | RKAKO_A - NAME | Capacity name | ||
| 73 | RKAKO_A - MEINS | Base Unit of Measurement for Capacity | ||
| 74 | RKAKO_A - KAPAR | Capacity category | ||
| 75 | RKAKO_A - KALID | Factory calendar ID | ||
| 76 | SAUF - SAFNR | SOP order number | ||
| 77 | SYST - LINNO | ABAP System Field: Current Line in Current List | ||
| 78 | SYST - TABIX | ABAP System Field: Row Index of Internal Tables | ||
| 79 | SYST - UCOMM | ABAP System Field: PAI-Triggering Function Code | ||
| 80 | TC26T - TXT | Description of the capacity category | ||
| 81 | TC29S - LAGE | Distribution between earliest/latest dates |