Table/Structure Field list used by SAP ABAP Program LCXTKF20 (Include LCVBAPIF01)
SAP ABAP Program
LCXTKF20 (Include LCVBAPIF01) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
![]() |
![]() |
|||
1 | ![]() |
AFKO - PLNNR | Key for Task List Group | |
2 | ![]() |
AFKO_INC - PLNNR | Key for Task List Group | |
3 | ![]() |
AFVC - APLFL | Sequence | |
4 | ![]() |
AFVC - VORNR | Operation/Activity Number | |
5 | ![]() |
AFVGD - ARBEH | Unit for work | |
6 | ![]() |
AFVGD - ARBEI | Work involved in the activity | |
7 | ![]() |
AFVGD - ARBID | Object ID of the resource | |
8 | ![]() |
AFVGD - DAUNE | Normal duration/unit | |
9 | ![]() |
AFVGD - DAUNO | Normal duration of the activity | |
10 | ![]() |
AFVGD - FSAVD | Earliest scheduled start: Execution (date) | |
11 | ![]() |
AFVGD - FSAVZ | Earliest scheduled start: Execution (time) | |
12 | ![]() |
AFVGD - FSEDD | Earliest scheduled finish: Execution (date) | |
13 | ![]() |
AFVGD - FSEDZ | Earliest scheduled finish: Execution (time) | |
14 | ![]() |
AFVGD - ILE01 | Unit of measure for the activity to be confirmed | |
15 | ![]() |
AFVGD - INDBT | Field defined as in SY-TABIX | |
16 | ![]() |
AFVGD - ISM01 | Previously confirmed activity | |
17 | ![]() |
AFVGD - KALID | Factory Calendar | |
18 | ![]() |
AFVGD - KNOBJ | Number of Object with Assigned Dependencies | |
19 | ![]() |
AFVGD - MEINH | Unit of measure for activity | |
20 | ![]() |
AFVGD - MGVRG | Operation Quantity | |
21 | ![]() |
AFVGD - PLNTY | Task List Type | |
22 | ![]() |
AFVGD - SSAVD | Latest scheduled start: Execution (date) | |
23 | ![]() |
AFVGD - SSAVZ | Latest scheduled start: Execution (time) | |
24 | ![]() |
AFVGD - SSEDD | Latest scheduled finish: Execution (date) | |
25 | ![]() |
AFVGD - SSEDZ | Latest scheduled finish: Execution (time) | |
26 | ![]() |
AFVGD - WERKS | Plant | |
27 | ![]() |
AFVGI - APLFL | Sequence | |
28 | ![]() |
AFVGI - ARBID | Object ID of the resource | |
29 | ![]() |
AFVGI - KALID | Factory Calendar | |
30 | ![]() |
AFVGI - KNOBJ | Number of Object with Assigned Dependencies | |
31 | ![]() |
AFVGI - PLNTY | Task List Type | |
32 | ![]() |
AFVGI - VORNR | Operation/Activity Number | |
33 | ![]() |
AFVGI - WERKS | Plant | |
34 | ![]() |
AFVVI - ARBEH | Unit for work | |
35 | ![]() |
AFVVI - ARBEI | Work involved in the activity | |
36 | ![]() |
AFVVI - DAUNE | Normal duration/unit | |
37 | ![]() |
AFVVI - DAUNO | Normal duration of the activity | |
38 | ![]() |
AFVVI - FSAVD | Earliest scheduled start: Execution (date) | |
39 | ![]() |
AFVVI - FSAVZ | Earliest scheduled start: Execution (time) | |
40 | ![]() |
AFVVI - FSEDD | Earliest scheduled finish: Execution (date) | |
41 | ![]() |
AFVVI - FSEDZ | Earliest scheduled finish: Execution (time) | |
42 | ![]() |
AFVVI - ILE01 | Unit of measure for the activity to be confirmed | |
43 | ![]() |
AFVVI - ISM01 | Previously confirmed activity | |
44 | ![]() |
AFVVI - MEINH | Unit of measure for activity | |
45 | ![]() |
AFVVI - MGVRG | Operation Quantity | |
46 | ![]() |
AFVVI - SSAVD | Latest scheduled start: Execution (date) | |
47 | ![]() |
AFVVI - SSAVZ | Latest scheduled start: Execution (time) | |
48 | ![]() |
AFVVI - SSEDD | Latest scheduled finish: Execution (date) | |
49 | ![]() |
AFVVI - SSEDZ | Latest scheduled finish: Execution (time) | |
50 | ![]() |
CAUFVD - AUTYP | Order category | |
51 | ![]() |
CAUFVD - CUOBJ | Configuration (internal object number) | |
52 | ![]() |
CAUFVD - MATNR | Material Number for Order | |
53 | ![]() |
CAUFVTAB - AUTYP | Order category | |
54 | ![]() |
CAUFVTAB - CUOBJ | Configuration (internal object number) | |
55 | ![]() |
COCAUFVINF - MATNR | Material Number for Order | |
56 | ![]() |
COOPRINF - INDBT | Field defined as in SY-TABIX | |
57 | ![]() |
CRCA - CAP_BACKFLUSH_SU | Control: Calc. of Remaining Req./Duration After Confirmation | |
58 | ![]() |
CXAFVG_ACT - ILE01 | Unit of measure for the activity to be confirmed | |
59 | ![]() |
CXAFVG_ACT - ILE02 | Unit of measure for the activity to be confirmed | |
60 | ![]() |
CXAFVG_ACT - ILE03 | Unit of measure for the activity to be confirmed | |
61 | ![]() |
CXAFVG_ACT - ILE04 | Unit of measure for the activity to be confirmed | |
62 | ![]() |
CXAFVG_ACT - ILE05 | Unit of measure for the activity to be confirmed | |
63 | ![]() |
CXAFVG_ACT - ILE06 | Unit of measure for the activity to be confirmed | |
64 | ![]() |
CXAFVG_ACT - IPRE1 | Unit of measurement for conf. quantity for business process | |
65 | ![]() |
CXAFVG_ACT - IPRZ1 | Confirmed quantity/work for business process | |
66 | ![]() |
CXAFVG_ACT - ISM01 | Previously confirmed activity | |
67 | ![]() |
CXAFVG_ACT - ISM02 | Previously confirmed activity | |
68 | ![]() |
CXAFVG_ACT - ISM03 | Previously confirmed activity | |
69 | ![]() |
CXAFVG_ACT - ISM04 | Previously confirmed activity | |
70 | ![]() |
CXAFVG_ACT - ISM05 | Previously confirmed activity | |
71 | ![]() |
CXAFVG_ACT - ISM06 | Previously confirmed activity | |
72 | ![]() |
CXAFVG_V1 - LEK01 | Indicator: No remaining activity expected | |
73 | ![]() |
CXAFVG_V1 - LEK02 | Indicator: No remaining activity expected | |
74 | ![]() |
CXAFVG_V1 - LEK03 | Indicator: No remaining activity expected | |
75 | ![]() |
CXAFVG_V1 - LEK04 | Indicator: No remaining activity expected | |
76 | ![]() |
CXAFVG_V1 - LEK05 | Indicator: No remaining activity expected | |
77 | ![]() |
CXAFVG_V1 - LEK06 | Indicator: No remaining activity expected | |
78 | ![]() |
CXAFVG_V1 - LMNGA | Total Yield Confirmed | |
79 | ![]() |
CXAFVG_V1 - MGVRG | Operation Quantity | |
80 | ![]() |
CXAFVG_V1 - OFM01 | Forecast value used to update the standard value | |
81 | ![]() |
CXAFVG_V1 - OFM02 | Forecast value used to update the standard value | |
82 | ![]() |
CXAFVG_V1 - OFM03 | Forecast value used to update the standard value | |
83 | ![]() |
CXAFVG_V1 - OFM04 | Forecast value used to update the standard value | |
84 | ![]() |
CXAFVG_V1 - OFM05 | Forecast value used to update the standard value | |
85 | ![]() |
CXAFVG_V1 - OFM06 | Forecast value used to update the standard value | |
86 | ![]() |
CXAFVG_V1 - RMNGA | Total confirmed rework quantity | |
87 | ![]() |
CXAFVG_V1 - SPANZ | Actual number of splits | |
88 | ![]() |
CXAFVG_V1 - XMNGA | Total scrap quantity confirmed | |
89 | ![]() |
CXAFVG_V2 - ARBEI | Work involved in the activity | |
90 | ![]() |
CXAFVG_V2 - DAUNE | Normal duration/unit | |
91 | ![]() |
CXAFVG_V2 - ISMNW | Actual work | |
92 | ![]() |
CXAFVG_V2 - LEK01 | Indicator: No remaining activity expected | |
93 | ![]() |
CXAFVG_V2 - LEK02 | Indicator: No remaining activity expected | |
94 | ![]() |
CXAFVG_V2 - LEK03 | Indicator: No remaining activity expected | |
95 | ![]() |
CXAFVG_V2 - LEK04 | Indicator: No remaining activity expected | |
96 | ![]() |
CXAFVG_V2 - LEK05 | Indicator: No remaining activity expected | |
97 | ![]() |
CXAFVG_V2 - LEK06 | Indicator: No remaining activity expected | |
98 | ![]() |
CXAFVG_V2 - LEKNW | Indicator: No Remaining Work Expected | |
99 | ![]() |
CXAFVG_V2 - LMNGA | Total Yield Confirmed | |
100 | ![]() |
CXAFVG_V2 - MGVRG | Operation Quantity | |
101 | ![]() |
CXAFVG_V2 - OFM01 | Forecast value used to update the standard value | |
102 | ![]() |
CXAFVG_V2 - OFM02 | Forecast value used to update the standard value | |
103 | ![]() |
CXAFVG_V2 - OFM03 | Forecast value used to update the standard value | |
104 | ![]() |
CXAFVG_V2 - OFM04 | Forecast value used to update the standard value | |
105 | ![]() |
CXAFVG_V2 - OFM05 | Forecast value used to update the standard value | |
106 | ![]() |
CXAFVG_V2 - OFM06 | Forecast value used to update the standard value | |
107 | ![]() |
CXAFVG_V2 - OFMNW | Forecasted work (actual + remaining) | |
108 | ![]() |
CXAFVG_V2 - PDAE | Unit of the forecasted duration from the confirmation | |
109 | ![]() |
CXAFVG_V2 - PDAU | Forecasted duration of activity from confirmation | |
110 | ![]() |
CXAFVG_V2 - XMNGA | Total scrap quantity confirmed | |
111 | ![]() |
CYKBEDQUAN - ARBEH | Unit for work | |
112 | ![]() |
CYKBEDQUAN - ARBEI | Work involved in the activity | |
113 | ![]() |
CYKBEDQUAN - DAUNO | Normal duration of the activity | |
114 | ![]() |
CYKBEDQUAN - FENDD | Earliest finish /date | |
115 | ![]() |
CYKBEDQUAN - FENDU | Earliest finish /time | |
116 | ![]() |
CYKBEDQUAN - FSTAD | Earliest start / date | |
117 | ![]() |
CYKBEDQUAN - FSTAU | Earliest start / time | |
118 | ![]() |
CYKBEDQUAN - KAPID | Capacity ID | |
119 | ![]() |
CYKBEDQUAN - KPVER | Distribution of capacity requirements (Planned/prod.order) | |
120 | ![]() |
CYKBEDQUAN - MEINH | Unit of measure for activity | |
121 | ![]() |
CYKBEDQUAN - MGVRG | Operation Quantity | |
122 | ![]() |
CYKBEDQUAN - OBJKZ | Indicator: Remaining split record | |
123 | ![]() |
CYKBEDQUAN - SENDD | Latest finish / date | |
124 | ![]() |
CYKBEDQUAN - SENDU | Latest finish / time | |
125 | ![]() |
CYKBEDQUAN - SPLIT | Split number | |
126 | ![]() |
CYKBEDQUAN - SSTAD | Latest start / date | |
127 | ![]() |
CYKBEDQUAN - SSTAU | Latest start / time | |
128 | ![]() |
KBED - ARBID | Work center ID | |
129 | ![]() |
KBED - CANUMF | Counter for the main capacity requirements record | |
130 | ![]() |
KBED - FENDD | Earliest finish /date | |
131 | ![]() |
KBED - FENDU | Earliest finish /time | |
132 | ![]() |
KBED - FSTAD | Earliest start / date | |
133 | ![]() |
KBED - FSTAU | Earliest start / time | |
134 | ![]() |
KBED - KAPID | Capacity ID | |
135 | ![]() |
KBED - KPVER | Distribution of capacity requirements (Planned/prod.order) | |
136 | ![]() |
KBED - SENDD | Latest finish / date | |
137 | ![]() |
KBED - SENDU | Latest finish / time | |
138 | ![]() |
KBED - SPLIT | Split number | |
139 | ![]() |
KBED - SSTAD | Latest start / date | |
140 | ![]() |
KBED - SSTAU | Latest start / time | |
141 | ![]() |
KBEDD - ARBEH | Unit for work | |
142 | ![]() |
KBEDD - ARBEI | Work involved in the activity | |
143 | ![]() |
KBEDD - ARBID | Work center ID | |
144 | ![]() |
KBEDD - CANUMF | Counter for the main capacity requirements record | |
145 | ![]() |
KBEDD - DAUNE | Normal duration/unit | |
146 | ![]() |
KBEDD - DAUNO | Normal duration of the activity | |
147 | ![]() |
KBEDD - DELTA_EN | Time Difference Between Fin. Capacity and Individ. Capacity | |
148 | ![]() |
KBEDD - DELTA_ST | Time Difference Between Start Capacity and Individ. Capacity | |
149 | ![]() |
KBEDD - FENDD | Earliest finish /date | |
150 | ![]() |
KBEDD - FENDU | Earliest finish /time | |
151 | ![]() |
KBEDD - FSTAD | Earliest start / date | |
152 | ![]() |
KBEDD - FSTAU | Earliest start / time | |
153 | ![]() |
KBEDD - KAPID | Capacity ID | |
154 | ![]() |
KBEDD - KPVER | Distribution of capacity requirements (Planned/prod.order) | |
155 | ![]() |
KBEDD - SENDD | Latest finish / date | |
156 | ![]() |
KBEDD - SENDU | Latest finish / time | |
157 | ![]() |
KBEDD - SPLIT | Split number | |
158 | ![]() |
KBEDD - SSTAD | Latest start / date | |
159 | ![]() |
KBEDD - SSTAU | Latest start / time | |
160 | ![]() |
KBEDI - ARBID | Work center ID | |
161 | ![]() |
KBEDI - CANUMF | Counter for the main capacity requirements record | |
162 | ![]() |
KBEDI - FENDD | Earliest finish /date | |
163 | ![]() |
KBEDI - FENDU | Earliest finish /time | |
164 | ![]() |
KBEDI - FSTAD | Earliest start / date | |
165 | ![]() |
KBEDI - FSTAU | Earliest start / time | |
166 | ![]() |
KBEDI - KAPID | Capacity ID | |
167 | ![]() |
KBEDI - KPVER | Distribution of capacity requirements (Planned/prod.order) | |
168 | ![]() |
KBEDI - SENDD | Latest finish / date | |
169 | ![]() |
KBEDI - SENDU | Latest finish / time | |
170 | ![]() |
KBEDI - SPLIT | Split number | |
171 | ![]() |
KBEDI - SSTAD | Latest start / date | |
172 | ![]() |
KBEDI - SSTAU | Latest start / time | |
173 | ![]() |
KBEZI - ARBEH | Unit for work | |
174 | ![]() |
KBEZI - ARBEI | Work involved in the activity | |
175 | ![]() |
KBEZI - DAUNE | Normal duration/unit | |
176 | ![]() |
KBEZI - DAUNO | Normal duration of the activity | |
177 | ![]() |
KBEZI - DELTA_EN | Time Difference Between Fin. Capacity and Individ. Capacity | |
178 | ![]() |
KBEZI - DELTA_ST | Time Difference Between Start Capacity and Individ. Capacity | |
179 | ![]() |
M60I - EDGNO | Internal number for edge of object dependencies tree | |
180 | ![]() |
RCR01 - SAKL1 | Record type group | |
181 | ![]() |
RCR01 - SAKL2 | Record type group | |
182 | ![]() |
RCR01 - SAKLP | Record type group | |
183 | ![]() |
RCROP - ARBEI | Work involved in the activity | |
184 | ![]() |
RCROP - DAUNE | Normal duration/unit | |
185 | ![]() |
RCROP - DAUNO | Normal duration of the activity | |
186 | ![]() |
RCROP - MGVRG | Operation Quantity | |
187 | ![]() |
RCROP - SPLIM | Maximum number of splits | |
188 | ![]() |
RCRVGW - VGE01 | Unit of measure for the standard value | |
189 | ![]() |
RCRVGW - VGW01 | Standard Value | |
190 | ![]() |
RCRVGW - VGW02 | Standard Value | |
191 | ![]() |
RCRVGW - VGW03 | Standard Value | |
192 | ![]() |
RCRVGW - VGW04 | Standard Value | |
193 | ![]() |
RCRVGW - VGW05 | Standard Value | |
194 | ![]() |
RCRVGW - VGW06 | Standard Value | |
195 | ![]() |
SYST - INDEX | ABAP System Field: Loop Index | |
196 | ![]() |
SYST - MSGID | ABAP System Field: Message ID | |
197 | ![]() |
SYST - MSGNO | ABAP System Field: Message Number | |
198 | ![]() |
SYST - MSGTY | ABAP System Field: Message Type | |
199 | ![]() |
SYST - MSGV1 | ABAP System Field: Message Variable | |
200 | ![]() |
SYST - MSGV2 | ABAP System Field: Message Variable | |
201 | ![]() |
SYST - MSGV3 | ABAP System Field: Message Variable | |
202 | ![]() |
SYST - MSGV4 | ABAP System Field: Message Variable | |
203 | ![]() |
SYST - TABIX | ABAP System Field: Row Index of Internal Tables | |
204 | ![]() |
TC21 - SAKL_01 | Record type group | |
205 | ![]() |
TC29 - STRAT | Distribution strategy for capacity planning | |
206 | ![]() |
TC29S - LAGE | Distribution between earliest/latest dates | |
207 | ![]() |
TTL_ACTIV - ACTI1 | Total activity to be confirmed | |
208 | ![]() |
TTL_ACTIV - ACTI2 | Total activity to be confirmed | |
209 | ![]() |
TTL_ACTIV - ACTI3 | Total activity to be confirmed | |
210 | ![]() |
TTL_ACTIV - ACTI4 | Total activity to be confirmed | |
211 | ![]() |
TTL_ACTIV - ACTI5 | Total activity to be confirmed | |
212 | ![]() |
TTL_ACTIV - ACTI6 | Total activity to be confirmed | |
213 | ![]() |
TTL_ACTIV - PROZ1 | Quantity to confirm: Business process | |
214 | ![]() |
TTL_ACTIV - UNIP1 | Unit of measurement for confirmed business process qty | |
215 | ![]() |
TTL_ACTIV - UNIT1 | Unit for the total activity to be confirmed | |
216 | ![]() |
TTL_ACTIV - UNIT2 | Unit for the total activity to be confirmed | |
217 | ![]() |
TTL_ACTIV - UNIT3 | Unit for the total activity to be confirmed | |
218 | ![]() |
TTL_ACTIV - UNIT4 | Unit for the total activity to be confirmed | |
219 | ![]() |
TTL_ACTIV - UNIT5 | Unit for the total activity to be confirmed | |
220 | ![]() |
TTL_ACTIV - UNIT6 | Unit for the total activity to be confirmed |