Message Number list used by SAP ABAP Program LCORFF5E (Include LCORFF5E)
SAP ABAP Program LCORFF5E (Include LCORFF5E) is using
# Object Type Object Name Object Description Note
     
1 Message Number  00 - 126 Specify positive values only
2 Message Number  CMFU - 041 Enter either remaining work or indicator "No remaining work"
3 Message Number  CR - 061 Activity type & not set up for cost center & &
4 Message Number  CR - 062 Activity type & is not set up for cost center & & in the year &
5 Message Number  RU - 290 Activity type missing - confirmation will be saved without actual costs
6 Message Number  RU - 205 Maintain a unit for the duration
7 Message Number  RU - 287 No remaining duration/forecast finish possible for final confirmation
8 Message Number  RU - 274 Please enter either actual start and actual finish or none of the fields
9 Message Number  RU - 270 Formula &1 for calculating work contains division by zero!
10 Message Number  RU - 267 Enter execute start and execute finish
11 Message Number  RU - 254 100% of planned time already recorded - please check
12 Message Number  RU - 252 Enter a unit of dimension TIME
13 Message Number  RU - 251 Actual duration + remaining duration exceeds planned duration
14 Message Number  RU - 250 Actual work + remaining work exceeds planned work
15 Message Number  RU - 248 Enter either degree of processing or set the final confirmation indicator
16 Message Number  RU - 247 Enter either remaining work or set the final confirmation indicator
17 Message Number  RU - 246 Enter remaining activity or indicator FINISHED
18 Message Number  RU - 230 Actual/remaining work and degree of processing inconsistent
19 Message Number  RU - 223 Varying dimension for work units
20 Message Number  RU - 219 Actual duration + remaining duration deviates by more than &% from schd.
21 Message Number  RU - 218 Actual work + remaining work deviates by more than &% from planned work
22 Message Number  RU - 217 You have maintained the actual work - please enter a unit of measure
23 Message Number  RU - 211 Enter either forecast finish or forecast duration
24 Message Number  RU - 210 Work is confirmed - maintain the work center
25 Message Number  RU - 209 Actual date(s) is in the future (check parameters)
26 Message Number  RU - 707 Scrap for order &1 in plant &2 must not be confirmed
27 Message Number  RU - 445 You can only charge off in connection with final confirmation
28 Message Number  RU - 548 A deletion flag was set for work center & in plant &
29 Message Number  RU - 547 A lock was set for work center & plant &
30 Message Number  RU - 530 Entering quantities is not allowed for the entered time event
31 Message Number  RU - 521 Only &1 &2 for previous operation &3 from order &4 has been confirmed
32 Message Number  RU - 509 No business process has been defined for operation or work center
33 Message Number  RU - 467 Subordinate order in collective order is already finally confirmed
34 Message Number  RU - 465 Previous operation already finally confirmed
35 Message Number  RU - 450 Personnel no. or no. of time recording ID card cannot be entered
36 Message Number  RU - 449 Enter personnel number or number of time recording ID card
37 Message Number  RU - 448 Identification number & and personnel number & are not compatible
38 Message Number  RU - 292 Forecast work of operation exceeds maximum work
39 Message Number  RU - 443 Up until now only & & confirmed for preceding operation &
40 Message Number  RU - 442 Up until now only & & confirmed for predecessors & / &
41 Message Number  RU - 428 Posting period & & is locked (check posting date)
42 Message Number  RU - 314 Service type copied from work center
43 Message Number  RU - 313 Activity type filled - maintain workplace also
44 Message Number  RU - 312 Actual or planned work center is adopted from operation/operation element
45 Message Number  RU - 300 Controlling area of work center (&) differs from order (&)
46 Message Number  RU - 294 Remaining work exceeds maximum work
47 Message Number  RU - 293 Actual work exceeds maximum work
48 Message Number  RU - 033 Confirmed activity must not be smaller than 0 (check entry)
49 Message Number  RU - 069 Enter a unit of measure for activity &
50 Message Number  RU - 065 Degree of processing must range from 0 to 100 (check entry)
51 Message Number  RU - 043 Posting date must not be in the future
52 Message Number  RU - 040 Personnel master record & not found (check entry)
53 Message Number  RU - 039 Activities are recalculated due to quantity change (please note)
54 Message Number  RU - 038 Confirmed quantity greater than overdelivery tolerance
55 Message Number  RU - 037 Confirmed quantity is smaller than underdelivery tolerance
56 Message Number  RU - 036 Underdelivery not allowed for final confirmation (check entry)
57 Message Number  RU - 035 Confirmed activity must not be greater than 0 (check entry)
58 Message Number  RU - 034 Confirmed quantity must not be smaller than 0 (check entry)
59 Message Number  RU - 070 No plant sections exist for plant &
60 Message Number  RU - 032 Work center & does not exist in plant & (check your entry)
61 Message Number  RU - 030 Date &, time & is in the future
62 Message Number  RU - 029 According to factory calendar & (&) is not a workday (check entry)
63 Message Number  RU - 028 Two operation times are not in ascending order
64 Message Number  RU - 027 Enter a date with the time
65 Message Number  RU - 019 Posting date is in the past, check entry
66 Message Number  RU - 018 Date & is invalid (check entry)
67 Message Number  RU - 017 Factory calendar not in buffer. Contact system administrator
68 Message Number  RU - 016 & is before validity period of factory calendar, check date
69 Message Number  RU - 015 & is after validity period of factory calendar, check date
70 Message Number  RU - 139 Overdelivery is not permitted (Check entry)
71 Message Number  RU - 203 Start time is later than finish time - check entry
72 Message Number  RU - 202 Start date is later than finish date - please check
73 Message Number  RU - 180 Sequence of time events not adhered to
74 Message Number  RU - 177 You are not authorized to process work center & &
75 Message Number  RU - 168 Entry 'No remaining work': Entry is set to zero
76 Message Number  RU - 167 Entering a final confirmation will set the remaining work to zero
77 Message Number  RU - 165 Operation without unit: unit & is copied into the operation
78 Message Number  RU - 162 The degree of processing is already & %
79 Message Number  RU - 149 Dimensions differ between unit entered (&) and op. unit &
80 Message Number  RU - 148 Unit & does not exist -> check your entry
81 Message Number  RU - 204 Unit & is not a time unit - enter a time unit
82 Message Number  RU - 121 Activity & is not defined (confirmation is not possible)
83 Message Number  RU - 120 Activity & cannot be entered
84 Message Number  RU - 117 Total quantity confirmed not equal to planned quantity to be confirmed
85 Message Number  RU - 096 Work center & is not defined for routing type &
86 Message Number  RU - 089 Date & is in the future
87 Message Number  RU - 088 Quuantities cannot be specified for sub-operations
88 Message Number  RU - 077 Alternative qty unit & cannot be converted into base unit &
89 Message Number  RU - 074 Date & is earlier than order release date &
90 Message Number  RU - 073 Posting date & is earlier than release date & of the order
91 Message Number  RU - 071 Wage type & is not valid for personnel number or plant