| 1 | AFVGB - VBKZ | Update indicator | ||
| 2 | AFVGD - APLFL | Sequence | ||
| 3 | AFVGD - DAUNO | Normal duration of the activity | ||
| 4 | AFVGD - NTENZ | Basic finish time of the activity | ||
| 5 | AFVGI - APLFL | Sequence | ||
| 6 | AFVVI - DAUNO | Normal duration of the activity | ||
| 7 | AFVVI - NTENZ | Basic finish time of the activity | ||
| 8 | AM61K - FNAME | Field name | ||
| 9 | AUFK - AUFNR | Order Number | ||
| 10 | AUTHA - PSARG | Department for authorization checking in project system | ||
| 11 | CAUFV - AUFNR | Order Number | ||
| 12 | CAUFVD - AUCOST | Indicator: Cost automatically | ||
| 13 | CAUFVD - AUDISP | Reservation Relevance/Generation of Purchase Requisition | ||
| 14 | CAUFVD - AUKBED | Indicator: Calculate capacity requirements | ||
| 15 | CAUFVD - PLART | Basis for scheduling | ||
| 16 | CAUFVD - TERKZ | Scheduling type | ||
| 17 | CAUFVTAB - PLART | Basis for scheduling | ||
| 18 | CAUFVTAB - TERKZ | Scheduling type | ||
| 19 | COCAUFVINF - AUCOST | Indicator: Cost automatically | ||
| 20 | COCAUFVINF - AUDISP | Reservation Relevance/Generation of Purchase Requisition | ||
| 21 | COCAUFVINF - AUKBED | Indicator: Calculate capacity requirements | ||
| 22 | COUPDINF - VBKZ | Update indicator | ||
| 23 | KBED - TYPKZ | Type of object causing the load (order category) | ||
| 24 | KBEDI - TYPKZ | Type of object causing the load (order category) | ||
| 25 | NET_PROFIL - INDEX | Profile index for graphics profiles | ||
| 26 | PRLST - STUFE | Level in project hierarchy | ||
| 27 | PROJ - PSPID | Project definition | ||
| 28 | PROJ - PSPNR | Current number for project or project item | ||
| 29 | PROJ - VGPLF | Planning method for project basic dates | ||
| 30 | PROJ2_INC - VGPLF | Planning method for project basic dates | ||
| 31 | PROJ_INC - PSPID | Project definition | ||
| 32 | PROJ_INC - VGPLF | Planning method for project basic dates | ||
| 33 | PRPS - POSID | Work Breakdown Structure Element (WBS Element) | ||
| 34 | PRPS - POST1 | PS: Short description (first text line) | ||
| 35 | PRPS - PSPNR | WBS Element | ||
| 36 | PRPS - STUFE | Level in project hierarchy | ||
| 37 | PRPS2_INC - STUFE | Level in project hierarchy | ||
| 38 | PRPS_INC - POSID | Work Breakdown Structure Element (WBS Element) | ||
| 39 | PRPS_INC - POST1 | PS: Short description (first text line) | ||
| 40 | PRPS_INC - STUFE | Level in project hierarchy | ||
| 41 | PRTE - PDAUR | Length (duration) of the basic dates in the WBS element | ||
| 42 | PRTE - POSNR | WBS Element | ||
| 43 | PRTE - PSTRT | WBS element: Basic start date | ||
| 44 | PRTEB - CHNGE | (Change) action allowed | ||
| 45 | PRTEB - DISPL | Alternative action (display) allowed | ||
| 46 | PRTEINC - PDAUR | Length (duration) of the basic dates in the WBS element | ||
| 47 | PRTEINC - PSTRT | WBS element: Basic start date | ||
| 48 | RCJ_EIGEN - FLAG_ACCT | WBS element is an account assignment element | ||
| 49 | RCJ_EIGEN - FLAG_AUC | WBS element assigned to asset under construction | ||
| 50 | RCJ_EIGEN - FLAG_BILL | WBS element is a billing element | ||
| 51 | RCJ_EIGEN - FLAG_CAPS | WBS element is assigned to an investment program | ||
| 52 | RCJ_EIGEN - FLAG_CSTA | Activity/ element is general costs activity | ||
| 53 | RCJ_EIGEN - FLAG_EXT | Activity/element is an external activity | ||
| 54 | RCJ_EIGEN - FLAG_PLAN | WBS element is a planning element | ||
| 55 | RCJ_EIGEN - FLAG_SERV | Activity is a service activity | ||
| 56 | RCJ_EIGEN - FLAG_STAT | Statistical WBS element | ||
| 57 | RCJ_EIGEN - FLAG_SUBP | WBS element is sub-project | ||
| 58 | RCJ_EIGEN - FLAG_WORK | Activity is an internally processed (work) activity | ||
| 59 | RCJ_ZUORD - PS_NICHTS | Indicator: Deselect highlighting | ||
| 60 | RCWBT - EINHT | Normal duration/unit | ||
| 61 | RCWBT - ETERM | Finish date for an object (WBS element, activity ...) | ||
| 62 | RCWBT - IDENT | Work breakdown structure element (WBS element) | ||
| 63 | RCWBT - NTER | Indicator: WBS dates are not current | ||
| 64 | RCWBT - SEARCH | Search term | ||
| 65 | RCWBT - SELKZ | Selection flag | ||
| 66 | RCWBT - STERM | Start date for an object (WBS element, operation) | ||
| 67 | RCWBT - UNTRG | Indicator: WBS element is sub-divided | ||
| 68 | RPSCO - VERSN | Planning/budgeting version | ||
| 69 | SI_AUTHA - PSARG | Department for authorization checking in project system | ||
| 70 | SVAL - VALUE | Table field value | ||
| 71 | SYST - DATAR | ABAP System Field: Highlighted Input in Dynpro Field | ||
| 72 | SYST - DATUM | ABAP System Field: Current Date of Application Server | ||
| 73 | SYST - DYNNR | ABAP System Field: Current Dynpro Number | ||
| 74 | SYST - INDEX | ABAP System Field: Loop Index | ||
| 75 | SYST - MSGTY | ABAP System Field: Message Type | ||
| 76 | SYST - STEPL | ABAP System Field: Current Step Loop or Table Control Line | ||
| 77 | SYST - TABIX | ABAP System Field: Row Index of Internal Tables | ||
| 78 | SYST - TCODE | ABAP System Field: Current Transaction Code | ||
| 79 | SYST - XFORM | ABAP System Field: Internal Use | ||
| 80 | T001W - FABKL | Factory calendar key | ||
| 81 | T006D - DIMID | Dimension key | ||
| 82 | T100 - MSGNR | Message number | ||
| 83 | T185 - BLDGR | Screen group | ||
| 84 | T185 - DUNKEL | Process subsequent screen in background | ||
| 85 | T185 - FCODE | Function code | ||
| 86 | T185 - KOPGR | Screen sequence group in doc. header | ||
| 87 | T185 - PANEL | Name of the current screen display | ||
| 88 | T185 - POSGR | Group of doc.items for screen sequence | ||
| 89 | T185F - AGIDV | Application areas | ||
| 90 | T185F - FCODE | Function code | ||
| 91 | T185F - TRTYP | Transaction type | ||
| 92 | T185V - CTITEL | Key for CUA screen titles | ||
| 93 | T185V - STATUS | Menu Painter: Status code | ||
| 94 | TC10 - TRTYP | Transaction type | ||
| 95 | TCA16 - DZEIL | Layout of a line | ||
| 96 | TCA41 - NETSTUFE | Level of detail for (standard) networks | ||
| 97 | TCNVF - LSTVAR | Variable overviews: Overview variant | ||
| 98 | TCXPS - TERMKZ | Scheduling type | ||
| 99 | TCY30 - PROFILE_ID | Overall profile for capacity leveling | ||
| 100 | TCYMPP - MPPPRO_ID | Profile for work force planning | ||
| 101 | TJ01 - VRGNG | Business Transaction | ||
| 102 | TPICK - CUCOL | Cursor position (column) | ||
| 103 | TPICK - CUROW | Cursor position (line) | ||
| 104 | TPICK - PIAKT | Key for the action to be carried out by PICK | ||
| 105 | TPICK - PIAKT_TX | Name of the action to be carried out by PICK | ||
| 106 | TPICK - PIDET | Indicates whether it is a detail screen | ||
| 107 | TPICK - PI_FIELD | Field name in an input/output table |