Table/Structure Field list used by SAP ABAP Program LCJTRFIL (LCJTRFIL)
SAP ABAP Program
LCJTRFIL (LCJTRFIL) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | AFVGD - BEAZE | Unit of measure for processing time | ||
| 2 | AFVGD - FPAVD | Earliest scheduled start date (forecast) | ||
| 3 | AFVGD - FPAVZ | Earliest scheduled start time (forecast) | ||
| 4 | AFVGD - FPEDD | Earliest scheduled finish date (forecast) | ||
| 5 | AFVGD - FPEDZ | Earliest scheduled finish time (forecast) | ||
| 6 | AFVGD - FSAVD | Earliest scheduled start: Execution (date) | ||
| 7 | AFVGD - FSAVZ | Earliest scheduled start: Execution (time) | ||
| 8 | AFVGD - FSEDD | Earliest scheduled finish: Execution (date) | ||
| 9 | AFVGD - FSEDZ | Earliest scheduled finish: Execution (time) | ||
| 10 | AFVGD - KALID | Factory Calendar | ||
| 11 | AFVGD - NTENZ | Basic finish time of the activity | ||
| 12 | AFVGD - PROJN | Work breakdown structure element (WBS element) | ||
| 13 | AFVGI - KALID | Factory Calendar | ||
| 14 | AFVGI - PROJN | Work breakdown structure element (WBS element) | ||
| 15 | AFVVI - BEAZE | Unit of measure for processing time | ||
| 16 | AFVVI - FPAVD | Earliest scheduled start date (forecast) | ||
| 17 | AFVVI - FPAVZ | Earliest scheduled start time (forecast) | ||
| 18 | AFVVI - FPEDD | Earliest scheduled finish date (forecast) | ||
| 19 | AFVVI - FPEDZ | Earliest scheduled finish time (forecast) | ||
| 20 | AFVVI - FSAVD | Earliest scheduled start: Execution (date) | ||
| 21 | AFVVI - FSAVZ | Earliest scheduled start: Execution (time) | ||
| 22 | AFVVI - FSEDD | Earliest scheduled finish: Execution (date) | ||
| 23 | AFVVI - FSEDZ | Earliest scheduled finish: Execution (time) | ||
| 24 | AFVVI - NTENZ | Basic finish time of the activity | ||
| 25 | BAL_S_CLBK - USEREXITF | Application Log: Callback: Routine name | ||
| 26 | BAL_S_CLBK - USEREXITP | Application Log: Callback: Program name | ||
| 27 | CAUFVD - BREAKS | Indicator: Scheduling allowing for breaks | ||
| 28 | CAUFVD - FLG_AOB | Indicator: relationships | ||
| 29 | CAUFVD - FLG_ARBEI | Indicator: Default value work is relevant | ||
| 30 | CAUFVD - GLTPP | Finish date (forecast) | ||
| 31 | CAUFVD - GLTRP | Basic finish date | ||
| 32 | CAUFVD - GLUPP | Forecast finish (time) | ||
| 33 | CAUFVD - GLUZP | Basic finish (time) | ||
| 34 | CAUFVD - GSTPP | Forecast start date | ||
| 35 | CAUFVD - GSTRP | Basic start date | ||
| 36 | CAUFVD - PLART | Basis for scheduling | ||
| 37 | CAUFVD - RDKZP | Reduction indicator for scheduling (forecast) | ||
| 38 | CAUFVD - REDKZ | Reduction indicator for scheduling | ||
| 39 | CAUFVD - TERKZ | Scheduling type | ||
| 40 | CAUFVD - TMBAS | Set of dates for network | ||
| 41 | CAUFVD - TRKZP | Scheduling type (forecast) | ||
| 42 | CAUFVD - TYPKZ | Type of object causing the load (order category) | ||
| 43 | CAUFVTAB - BREAKS | Indicator: Scheduling allowing for breaks | ||
| 44 | CAUFVTAB - FLG_AOB | Indicator: relationships | ||
| 45 | CAUFVTAB - FLG_ARBEI | Indicator: Default value work is relevant | ||
| 46 | CAUFVTAB - GLTPP | Finish date (forecast) | ||
| 47 | CAUFVTAB - GLTRP | Basic finish date | ||
| 48 | CAUFVTAB - GLUPP | Forecast finish (time) | ||
| 49 | CAUFVTAB - GLUZP | Basic finish (time) | ||
| 50 | CAUFVTAB - GSTPP | Forecast start date | ||
| 51 | CAUFVTAB - GSTRP | Basic start date | ||
| 52 | CAUFVTAB - PLART | Basis for scheduling | ||
| 53 | CAUFVTAB - RDKZP | Reduction indicator for scheduling (forecast) | ||
| 54 | CAUFVTAB - REDKZ | Reduction indicator for scheduling | ||
| 55 | CAUFVTAB - TERKZ | Scheduling type | ||
| 56 | CAUFVTAB - TRKZP | Scheduling type (forecast) | ||
| 57 | COCAUFVINF - TMBAS | Set of dates for network | ||
| 58 | COCAUFVINF - TYPKZ | Type of object causing the load (order category) | ||
| 59 | COMSTINF - INDBT | Field defined as in SY-TABIX | ||
| 60 | JEST - STAT | Object status | ||
| 61 | KBED - TYPKZ | Type of object causing the load (order category) | ||
| 62 | KBEDI - TYPKZ | Type of object causing the load (order category) | ||
| 63 | MLST - PSPNR | WBS Element | ||
| 64 | MLSTD - INDBT | Field defined as in SY-TABIX | ||
| 65 | MLSTD - PSPNR | WBS Element | ||
| 66 | MLST_INC - PSPNR | WBS Element | ||
| 67 | PROJ - AEDTE | Date of last scheduling of the overall network (basic dates) | ||
| 68 | PROJ - AEDTP | Date of last scheduling of the overall network (forecast) | ||
| 69 | PROJ - EPROG | PROJ-EPROG | ||
| 70 | PROJ - EWPLF | Planning method for project forecast dates | ||
| 71 | PROJ - PLFAZ | Project planned start date | ||
| 72 | PROJ - PLSEZ | Project planned finish date | ||
| 73 | PROJ - POST1 | PS: Short description (first text line) | ||
| 74 | PROJ - SPROG | PROJ-SPROG | ||
| 75 | PROJ - VGPLF | Planning method for project basic dates | ||
| 76 | PROJ2_INC - AEDTE | Date of last scheduling of the overall network (basic dates) | ||
| 77 | PROJ2_INC - AEDTP | Date of last scheduling of the overall network (forecast) | ||
| 78 | PROJ2_INC - EPROG | PROJ2_INC-EPROG | ||
| 79 | PROJ2_INC - EWPLF | Planning method for project forecast dates | ||
| 80 | PROJ2_INC - PLFAZ | Project planned start date | ||
| 81 | PROJ2_INC - PLSEZ | Project planned finish date | ||
| 82 | PROJ2_INC - POST1 | PS: Short description (first text line) | ||
| 83 | PROJ2_INC - SPROG | PROJ2_INC-SPROG | ||
| 84 | PROJ2_INC - VGPLF | Planning method for project basic dates | ||
| 85 | PROJ_INC - AEDTE | Date of last scheduling of the overall network (basic dates) | ||
| 86 | PROJ_INC - AEDTP | Date of last scheduling of the overall network (forecast) | ||
| 87 | PROJ_INC - EPROG | PROJ_INC-EPROG | ||
| 88 | PROJ_INC - EWPLF | Planning method for project forecast dates | ||
| 89 | PROJ_INC - PLFAZ | Project planned start date | ||
| 90 | PROJ_INC - PLSEZ | Project planned finish date | ||
| 91 | PROJ_INC - POST1 | PS: Short description (first text line) | ||
| 92 | PROJ_INC - SPROG | PROJ_INC-SPROG | ||
| 93 | PROJ_INC - VGPLF | Planning method for project basic dates | ||
| 94 | PRPS - FABKL | Factory calendar key | ||
| 95 | PRPS - OBJNR | Object number | ||
| 96 | PRPS - POST1 | PS: Short description (first text line) | ||
| 97 | PRPS - PSPNR | WBS Element | ||
| 98 | PRPS2_INC - FABKL | Factory calendar key | ||
| 99 | PRPS_INC - FABKL | Factory calendar key | ||
| 100 | PRPS_INC - OBJNR | Object number | ||
| 101 | PRPS_INC - POST1 | PS: Short description (first text line) | ||
| 102 | PRTE - EENDE | Forecasted finish date of the WBS element | ||
| 103 | PRTE - EETRF | Earliest scheduled finish date (forecast) | ||
| 104 | PRTE - EETRM | Scheduled finish date (Forecast) | ||
| 105 | PRTE - ESTRM | Scheduled start date (Forecast) | ||
| 106 | PRTE - ESTRS | Latest scheduled start date (forecast) | ||
| 107 | PRTE - ESTRT | Forecasted start date of the WBS element | ||
| 108 | PRTE - PEINH | Unit for duration of basic WBS element dates | ||
| 109 | PRTE - PENDE | WBS element: Basic finish date | ||
| 110 | PRTE - PETRF | Earliest scheduled finish date (basic) | ||
| 111 | PRTE - PETRM | Scheduled finish (Basic) | ||
| 112 | PRTE - PSTRM | Scheduled start (Basic) | ||
| 113 | PRTE - PSTRS | Latest scheduled start date (basic) | ||
| 114 | PRTE - PSTRT | WBS element: Basic start date | ||
| 115 | PRTEB - CHNGE | (Change) action allowed | ||
| 116 | PRTEB - EENDE | Forecasted finish date of the WBS element | ||
| 117 | PRTEB - EETRF | Earliest scheduled finish date (forecast) | ||
| 118 | PRTEB - EETRM | Scheduled finish date (Forecast) | ||
| 119 | PRTEB - ESTRM | Scheduled start date (Forecast) | ||
| 120 | PRTEB - ESTRS | Latest scheduled start date (forecast) | ||
| 121 | PRTEB - ESTRT | Forecasted start date of the WBS element | ||
| 122 | PRTEB - PEINH | Unit for duration of basic WBS element dates | ||
| 123 | PRTEB - PENDE | WBS element: Basic finish date | ||
| 124 | PRTEB - PETRF | Earliest scheduled finish date (basic) | ||
| 125 | PRTEB - PETRM | Scheduled finish (Basic) | ||
| 126 | PRTEB - PSTRM | Scheduled start (Basic) | ||
| 127 | PRTEB - PSTRS | Latest scheduled start date (basic) | ||
| 128 | PRTEB - PSTRT | WBS element: Basic start date | ||
| 129 | PRTEINC - EENDE | Forecasted finish date of the WBS element | ||
| 130 | PRTEINC - EETRF | PRTEINC-EETRF | ||
| 131 | PRTEINC - EETRM | Scheduled finish date (Forecast) | ||
| 132 | PRTEINC - ESTRM | Scheduled start date (Forecast) | ||
| 133 | PRTEINC - ESTRS | PRTEINC-ESTRS | ||
| 134 | PRTEINC - ESTRT | Forecasted start date of the WBS element | ||
| 135 | PRTEINC - PEINH | Unit for the length (duration) of the WBS element | ||
| 136 | PRTEINC - PENDE | WBS element: Basic finish date | ||
| 137 | PRTEINC - PETRF | PRTEINC-PETRF | ||
| 138 | PRTEINC - PETRM | Scheduled finish (Basic) | ||
| 139 | PRTEINC - PSTRM | Scheduled start (Basic) | ||
| 140 | PRTEINC - PSTRS | PRTEINC-PSTRS | ||
| 141 | PRTEINC - PSTRT | WBS element: Basic start date | ||
| 142 | RC27X - FLG_SEL | Selection indicator | ||
| 143 | RCJ_MARKL - INDEX | Row Index of Internal Tables | ||
| 144 | RCJ_MARKL - INDEX_PLKO | Index referring to record table for headers | ||
| 145 | RCJ_MARKL - INDEX_PLPO | Index referring to record table for items | ||
| 146 | RCJ_MARKL - MARK | Selection flag | ||
| 147 | RCJ_PSPNR - PSPNR | WBS Element | ||
| 148 | RCWBS - SEL01 | Selection flag | ||
| 149 | RCWBT - IDENT | Work breakdown structure element (WBS element) | ||
| 150 | RCWBT - SCHED_INST | Schedule maintenance/service orders | ||
| 151 | RCWBT - SELKZ | Selection flag | ||
| 152 | SVAL - FIELDNAME | Field Name | ||
| 153 | SVAL - TABNAME | Table Name | ||
| 154 | SVAL - VALUE | Table field value | ||
| 155 | SYST - BATCH | ABAP System Field: Background Processing Active | ||
| 156 | SYST - DATLO | ABAP System Field: Local Date of Current User | ||
| 157 | SYST - MSGID | ABAP System Field: Message ID | ||
| 158 | SYST - MSGNO | ABAP System Field: Message Number | ||
| 159 | SYST - MSGV1 | ABAP System Field: Message Variable | ||
| 160 | SYST - MSGV2 | ABAP System Field: Message Variable | ||
| 161 | SYST - MSGV3 | ABAP System Field: Message Variable | ||
| 162 | SYST - MSGV4 | ABAP System Field: Message Variable | ||
| 163 | SYST - TABIX | ABAP System Field: Row Index of Internal Tables | ||
| 164 | SYST - TFILL | ABAP System Field: Number of Rows in Internal Tables | ||
| 165 | SYST - UZEIT | ABAP System Field: Current Time of Application Server | ||
| 166 | T185 - FCODE | Function code | ||
| 167 | T185F - FCODE | Function code | ||
| 168 | TC10 - TRTYP | Transaction type | ||
| 169 | TCX00 - BREAKS | Indicator: Scheduling allowing for breaks | ||
| 170 | TCX00 - DADJ2 | Adjust dates in lead time scheduling | ||
| 171 | TCX00 - PROT_AUTO | Display scheduling log automatically | ||
| 172 | TCXPS - ECKTM_UPD | Indicator: Adjust Basic Dates | ||
| 173 | TCXPS - FLGWBS | Indicator: Network scheduling | ||
| 174 | TCXPS - PROT_AUTO | Display scheduling log automatically | ||
| 175 | TCXPS - TERMKZ | Scheduling type | ||
| 176 | TJ01 - VRGNG | Business Transaction |