Table/Structure Field list used by SAP ABAP Program LCJTRFE0 (SHIFT_PROJECT)
SAP ABAP Program
LCJTRFE0 (SHIFT_PROJECT) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | CAUFVD - PLART | Basis for scheduling | ||
| 2 | CAUFVTAB - PLART | Basis for scheduling | ||
| 3 | JEST - STAT | Object status | ||
| 4 | JSTAT - INACT | Indicator: Status Is Inactive | ||
| 5 | JSTAT - STAT | Object status | ||
| 6 | PROJ - AEDTE | Date of last scheduling of the overall network (basic dates) | ||
| 7 | PROJ - AEDTP | Date of last scheduling of the overall network (forecast) | ||
| 8 | PROJ - PLFAZ | Project planned start date | ||
| 9 | PROJ - PLSEZ | Project planned finish date | ||
| 10 | PROJ - VGPLF | Planning method for project basic dates | ||
| 11 | PROJ2_INC - PLFAZ | Project planned start date | ||
| 12 | PROJ2_INC - VGPLF | Planning method for project basic dates | ||
| 13 | PROJ2_INC - PLSEZ | Project planned finish date | ||
| 14 | PROJ2_INC - AEDTP | Date of last scheduling of the overall network (forecast) | ||
| 15 | PROJ2_INC - AEDTE | Date of last scheduling of the overall network (basic dates) | ||
| 16 | PROJ_INC - AEDTE | Date of last scheduling of the overall network (basic dates) | ||
| 17 | PROJ_INC - AEDTP | Date of last scheduling of the overall network (forecast) | ||
| 18 | PROJ_INC - PLFAZ | Project planned start date | ||
| 19 | PROJ_INC - PLSEZ | Project planned finish date | ||
| 20 | PROJ_INC - VGPLF | Planning method for project basic dates | ||
| 21 | PRPS - OBJNR | Object number | ||
| 22 | PRPS - PSPNR | WBS Element | ||
| 23 | PRPS_INC - OBJNR | Object number | ||
| 24 | PRTE - POSNR | WBS Element | ||
| 25 | PRTEB - POSNR | WBS Element | ||
| 26 | RCJ_MARKL - INDEX | Row Index of Internal Tables | ||
| 27 | RCJ_MARKL - INDEX_PLKO | Index referring to record table for headers | ||
| 28 | RCJ_MARKL - INDEX_PLPO | Index referring to record table for items | ||
| 29 | RCJ_MARKL - MARK | Selection flag | ||
| 30 | RCWBS - SEL01 | Selection flag | ||
| 31 | RCWBT - ETERM | Finish date for an object (WBS element, activity ...) | ||
| 32 | RCWBT - IDENT | Work breakdown structure element (WBS element) | ||
| 33 | RCWBT - STERM | Start date for an object (WBS element, operation) | ||
| 34 | SYST - INDEX | ABAP System Field: Loop Index | ||
| 35 | SYST - TABIX | ABAP System Field: Row Index of Internal Tables | ||
| 36 | SYST - MSGV4 | ABAP System Field: Message Variable | ||
| 37 | SYST - MSGV3 | ABAP System Field: Message Variable | ||
| 38 | SYST - MSGV2 | ABAP System Field: Message Variable | ||
| 39 | SYST - MSGV1 | ABAP System Field: Message Variable | ||
| 40 | SYST - MSGNO | ABAP System Field: Message Number | ||
| 41 | SYST - MSGID | ABAP System Field: Message ID | ||
| 42 | SYST - DATLO | ABAP System Field: Local Date of Current User | ||
| 43 | T185F - FCODE | Function code | ||
| 44 | TCXPS - TERMKZ | Scheduling type | ||
| 45 | TJ01 - VRGNG | Business Transaction |