Table/Structure Field list used by SAP ABAP Program LCJGLTOP (Include LCJGLTOP)
SAP ABAP Program
LCJGLTOP (Include LCJGLTOP) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | AFVGB - VBKZ | Update indicator | ||
| 2 | AFVGD - ARBEI | Work involved in the activity | ||
| 3 | AFVGD - WERKS | Plant | ||
| 4 | AFVGD - LTXA1 | Operation short text | ||
| 5 | AFVGD - ARBID | Object ID of the resource | ||
| 6 | AFVGD - ARBPL | Work center | ||
| 7 | AFVGI - ARBID | Object ID of the resource | ||
| 8 | AFVGI - LTXA1 | Operation short text | ||
| 9 | AFVGI - WERKS | Plant | ||
| 10 | AFVVI - ARBEI | Work involved in the activity | ||
| 11 | COOPRINF - ARBPL | Work center | ||
| 12 | COUPDINF - VBKZ | Update indicator | ||
| 13 | CYBED_GRU - GRUPPE | Requirements group | ||
| 14 | CYBED_GRU - KOMBI | Combination within a requirements group | ||
| 15 | CYCRHD_TAB - FUNKTION1 | Function to be carried for object "work center" | ||
| 16 | CYPER_BED - GRUPPE | Requirements group | ||
| 17 | CYPER_BED - KOMBI | Combination within a requirements group | ||
| 18 | CYPER_BED - INDPER_TAB | Index to period table "PER_TAB" | ||
| 19 | CYPER_BED - BEDAKT | Remaining capacity requirements for period | ||
| 20 | DFIES - SCRTEXT_M | Medium Field Label | ||
| 21 | KAKO - KAPAR | Capacity category | ||
| 22 | KAKO - KAPEH | Unit of measure of capacity | ||
| 23 | KAKO - KAPID | Capacity ID | ||
| 24 | PRPS - POSID | Work Breakdown Structure Element (WBS Element) | ||
| 25 | PRPS - POST1 | PS: Short description (first text line) | ||
| 26 | PRPS - PSPNR | WBS Element | ||
| 27 | PRPS - STUFE | Level in project hierarchy | ||
| 28 | PRPS - WERKS | Plant | ||
| 29 | PRPS2_INC - WERKS | Plant | ||
| 30 | PRPS2_INC - STUFE | Level in project hierarchy | ||
| 31 | PRPS_INC - POSID | Work Breakdown Structure Element (WBS Element) | ||
| 32 | PRPS_INC - POST1 | PS: Short description (first text line) | ||
| 33 | PRPS_INC - STUFE | Level in project hierarchy | ||
| 34 | PRPS_INC - WERKS | Plant | ||
| 35 | RC65L - PERIOD | Period in capacity planning lists | ||
| 36 | RC65L - SLIANGE | Available capacity in a period | ||
| 37 | RC65L - SLIBED | Capacity requirements within the planning period | ||
| 38 | RC65L - SLIBELAS | Load (%) within a period | ||
| 39 | RC65L - SLIDELTA | Remaining available capacity within the planning period | ||
| 40 | RCJ_PS_CAPA - KOSTL | Cost Center | ||
| 41 | RCJ_PS_CAPA - LARN1 | Activity type int. processing | ||
| 42 | RCJ_WBSIND - PSIND | Document table index for WBS elements | ||
| 43 | RCR01 - ARBID | Object ID | ||
| 44 | RCWBT - PLART | Planning type for project date definition | ||
| 45 | RKAKO_A - KAPAR | Capacity category | ||
| 46 | RKAKO_A - KAPEH | Unit of measure of capacity | ||
| 47 | RKAKO_A - KTEXT | Capacity short text | ||
| 48 | SYST - DATUM | ABAP System Field: Current Date of Application Server | ||
| 49 | SYST - INDEX | ABAP System Field: Loop Index | ||
| 50 | SYST - MSGTY | ABAP System Field: Message Type | ||
| 51 | SYST - TABIX | ABAP System Field: Row Index of Internal Tables | ||
| 52 | T185F - FCODE | Function code | ||
| 53 | TCNVF - APPLIC | Variable overviews: Application | ||
| 54 | TCNVF - LINTYP | Variable overviews: Line category | ||
| 55 | TCNVF - LSTVAR | Variable overviews: Overview variant | ||
| 56 | TCNVF - OBJECT | Variable overviews: Object | ||
| 57 | TCNVF - SUBAPP | Variable Overviews: Sub-application | ||
| 58 | TCNVL - LSTVAR | Variable overviews: Overview variant |