Data Element list used by SAP ABAP PINF WCM_INTF_EAM (WCM_INTF_EAM)
SAP ABAP PINF
WCM_INTF_EAM (WCM_INTF_EAM) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | WCEAFTIME | Actual End Date (Time) | ||
| 2 | WCEANLZU | Overall Condition of Technical System | ||
| 3 | WCEANLZUX | Text for Overall Condition of Operational System | ||
| 4 | WCECATFLG | Catalog Exists | ||
| 5 | WCECCOBJ | Technical Object | ||
| 6 | WCECCTYP | Item Category | ||
| 7 | WCECHDATE | Date on Which Object was Last Changed | ||
| 8 | WCECHNAME | Last Changed By | ||
| 9 | WCECHTIME | Time at Which Object was Last Changed | ||
| 10 | WCECOMMENT | Comment Line | ||
| 11 | WCECRDATE | Date on Which the Object Was Created | ||
| 12 | WCECRNAME | Created by | ||
| 13 | WCECRTIME | Time at Which Object was Created | ||
| 14 | WCECTRL | Switching Location | ||
| 15 | WCEDATE | Date | ||
| 16 | WCEDATEFR | Valid-From Date for WCM Object | ||
| 17 | WCEDATETO | Valid-To Date for WCM Object | ||
| 18 | WCEDELFLG | Delete | ||
| 19 | WCEDOCFLG | Linked to Document | ||
| 20 | WCEDPTCODE | Transaction Code for Displaying Object | ||
| 21 | WCEETAPE | Revision Phase | ||
| 22 | WCEETAPEX | Text for Revision Phase | ||
| 23 | WCEEXTTOTPERIOD | Total Extension of Validity in Hours | ||
| 24 | WCEICON | Icon | ||
| 25 | WCEITM | Item | ||
| 26 | WCEITMSEQ | Item | ||
| 27 | WCEITMTYP | Item Category | ||
| 28 | WCELCPHASE | Life-Cycle Phase | ||
| 29 | WCELNKFLG | Object List Exists | ||
| 30 | WCELOC | Location | ||
| 31 | WCELTXTFLG | Long Text Exists | ||
| 32 | WCENEED01 | Depressurization | ||
| 33 | WCENEED02 | Draining/Emptying | ||
| 34 | WCENEED03 | Cleaning/Hydrocarbon Freeing | ||
| 35 | WCENEED04 | Venting/Installation of Extra Ventilation | ||
| 36 | WCENEED05 | Prevent Release of Oil and Gas in the Work Area | ||
| 37 | WCENEED06 | Measures Against Radioactive Radiation | ||
| 38 | WCENEED07 | Regular Inspection of the Work Area | ||
| 39 | WCENEED08 | Gas Measurements Prior to/During Working Period | ||
| 40 | WCENEED09 | Fire Prevention | ||
| 41 | WCENEED10 | Continuous Guard/Radio | ||
| 42 | WCENEED11 | Drains Blocked/Covered | ||
| 43 | WCENEED12 | Set Up Barriers and Safety Signs | ||
| 44 | WCENEED13 | PA Announcements | ||
| 45 | WCENEED14 | Welding Machine Safely Located and Earthed | ||
| 46 | WCENEED15 | Follow Requirements for Work on Open Sea | ||
| 47 | WCENEED16 | Follow Requirements for Work At Height | ||
| 48 | WCENEED17 | HSE Datasheet Known and Available | ||
| 49 | WCENEED18 | Job Safety Analysis (JSA) | ||
| 50 | WCENEED19 | Lockout/Tagout | ||
| 51 | WCENEED20 | Provide Extinguishing Media | ||
| 52 | WCENEED21 | Set Up Fire Watch | ||
| 53 | WCENEED22 | Inform External Bodies | ||
| 54 | WCENEED23 | On-Site Instruction | ||
| 55 | WCENEED24 | Additional Protective Equipment | ||
| 56 | WCENEED25 | Maintain Initial List | ||
| 57 | WCENO | Object | ||
| 58 | WCEOBJART | Object Type | ||
| 59 | WCEPHBLFLG | Physical Blocking Required | ||
| 60 | WCEPHBLNR | Lock | ||
| 61 | WCEPHBLTYP | Physical Blocking Type | ||
| 62 | WCEPHBLTYPX | Text for Physical Blocking Type | ||
| 63 | WCEPREDITM | Predecessor | ||
| 64 | WCERECTIME | Recall Time | ||
| 65 | WCERECUNIT | Unit of Recall Time | ||
| 66 | WCEREFOBJ | Template (Object Number) | ||
| 67 | WCEREQULTXTFLG | Requalification Text Exists | ||
| 68 | WCESTXT | Descriptive Short Text | ||
| 69 | WCESUCCITM | Successor | ||
| 70 | WCETAGFLG | Tag Required | ||
| 71 | WCETGCOMMENT | Comment Line for Tagging | ||
| 72 | WCETGFORM | Print Format for Tag | ||
| 73 | WCETGGRP | Operational Group | ||
| 74 | WCETGLTXTFLG | Tagging Text Exists | ||
| 75 | WCETGNR | Tag | ||
| 76 | WCETGPROC | Tagging Condition | ||
| 77 | WCETGSEQ | Sequence for Tagging | ||
| 78 | WCETGSTEP | Operational Step for Tagging | ||
| 79 | WCETGTYP | Tagging Type | ||
| 80 | WCETIME | Time | ||
| 81 | WCETIMEFR | Valid-From Time for WCM Object | ||
| 82 | WCETIMETO | Valid-To Time for WCM Object | ||
| 83 | WCETRAIN | Train | ||
| 84 | WCETYP | Type of WCM Object | ||
| 85 | WCEUNCOMMENT | Comment Line for Untagging | ||
| 86 | WCEUNFORM | Print Format for Test Tag | ||
| 87 | WCEUNLTXTFLG | Untagging Text Exists | ||
| 88 | WCEUNNR | Test Tag | ||
| 89 | WCEUNPROC | Untagging Condition | ||
| 90 | WCEUNSEQ | Sequence for Untagging | ||
| 91 | WCEUNSTEP | Operational Step for Untagging | ||
| 92 | WCEUNTYP | Untagging Type | ||
| 93 | WCEUSAGE | Usage of WCM Object | ||
| 94 | WCEUSAGEX | Description of Usage | ||
| 95 | WCEWAPINR | Application | ||
| 96 | WCEWAPNR | Work Approval | ||
| 97 | WCEWCNR | Work Clearance Document | ||
| 98 | WCEWK01 | Hot Work A | ||
| 99 | WCEWK02 | Hot Work B in Classified Areas | ||
| 100 | WCEWK03 | Entry to Confined Spaces | ||
| 101 | WCEWK04 | Isolation and Testing or Bypassing of Safety Systems | ||
| 102 | WCEWK05 | Work on Hydrocarbon Systems (CmHn) | ||
| 103 | WCEWK06 | Pressure Testing | ||
| 104 | WCEWK07 | Work over Open Sea | ||
| 105 | WCEWK08 | Work with Hazardous Substances | ||
| 106 | WCEWK09 | Work with Radioactive Materials | ||
| 107 | WCEWK10 | Well Operation/Well Intervention | ||
| 108 | WCEWK11 | Work with Explosives | ||
| 109 | WCEWK12 | Critical Lifting Operations | ||
| 110 | WCEWK13 | Other Activities/Critical Operations | ||
| 111 | WCEWK14 | Nightwork | ||
| 112 | WCEWK15 | Work at Height | ||
| 113 | WCEWK16 | Overhead Work | ||
| 114 | WCEWK17 | Replacing Lamps | ||
| 115 | WCEWK18 | Work in Manholes | ||
| 116 | WCEWK19 | Cleaning Work | ||
| 117 | WCEWK20 | Demolition Work |