Table/Structure Field list used by SAP ABAP Function Module MD_MRP_SINGLE_MAT_MULTI_LEVEL (Bedarfsplanung im Hauptspeicher: Aufruf und Planung)
SAP ABAP Function Module
MD_MRP_SINGLE_MAT_MULTI_LEVEL (Bedarfsplanung im Hauptspeicher: Aufruf und Planung) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | CM61X - DISER | Creation Indicator for MRP Lists | ||
| 2 | CM61X - BANER | Creation Indicator for Purchase Requisitions | ||
| 3 | CM61X - WERKS | Plant | ||
| 4 | CM61X - VRART | Planning run processing type | ||
| 5 | CM61X - TRMPL | Scheduling planned orders | ||
| 6 | CM61X - PLSCN | Planning Scenario of Long-Term Planning | ||
| 7 | CM61X - PLOBJ | Object for controlling MRP transactions | ||
| 8 | CM61X - PLMOD | Planning mode | ||
| 9 | CM61X - PLAUF | Type of planning run | ||
| 10 | CM61X - PLALL | Also plan all unchanged components | ||
| 11 | CM61X - PLAKT | Activity types in materials planning | ||
| 12 | CM61X - MDMAF | Record type | ||
| 13 | CM61X - LIFKZ | Automatic Schedule Lines (Scheduling Agreements) | ||
| 14 | CM61X - INMEM | MRP in main memory | ||
| 15 | CM61X - ICMRP | Process MRP materials during MPS | ||
| 16 | CM61X - DTART | Type of MRP list | ||
| 17 | CM61X - DISPD | Date for planning (basis of comparison for time-phased plng) | ||
| 18 | MDCPUTIME - POSTT | MRP run: Time for posting | ||
| 19 | MDCPUTIME - SCHET | MRP run: Time required for lead time scheduling | ||
| 20 | MDCPUTIME - RTIME | MRP run: Total duration for each material | ||
| 21 | MDCPUTIME - RESBT | MRP run: Time required for saving dependent requirements | ||
| 22 | MDCPUTIME - READT | MRP run: Time required for reading the initial situation | ||
| 23 | MDCPUTIME - MDTBT | MRP run: Time for deleting/saving MRP list | ||
| 24 | MDCPUTIME - LOTST | MRP run: Time for calculating net requirements and lot-size | ||
| 25 | MDCPUTIME - EXPLT | MRP run: Time for BOM explosion | ||
| 26 | MDCPUTIME - EINZT | MRP run: Time for evaluating the operating time | ||
| 27 | MDCPUTIME - ARBPT | MRP run: Time to read routing | ||
| 28 | MDKE - MATNR | Material Number | ||
| 29 | MDKE - SCHET | MRP run: Time required for lead time scheduling | ||
| 30 | MDKE - RTIME | MRP run: Total duration for each material | ||
| 31 | MDKE - RESBT | MRP run: Time required for saving dependent requirements | ||
| 32 | MDKE - READT | MRP run: Time required for reading the initial situation | ||
| 33 | MDKE - POSTT | MRP run: Time for posting | ||
| 34 | MDKE - PLWRK | Planning Plant | ||
| 35 | MDKE - NAUKZ | Indicator: new exception in the MRP list | ||
| 36 | MDKE - MDTBT | MRP run: Time for deleting/saving MRP list | ||
| 37 | MDKE - LOTST | MRP run: Time for calculating net requirements and lot-size | ||
| 38 | MDKE - EXPLT | MRP run: Time for BOM explosion | ||
| 39 | MDKE - EINZT | MRP run: Time for evaluating the operating time | ||
| 40 | MDKE - BERID | MRP Area | ||
| 41 | MDKE - AUSZ8 | Exception group MRP list no. 8 | ||
| 42 | MDKE - ARBPT | MRP run: Time to read routing | ||
| 43 | MDMM - BERID | MRP Area | ||
| 44 | MDMM - PLWRK | Plant | ||
| 45 | MDMM - NOPLN | New Input Values | ||
| 46 | MDMM - DISST | Low-level code | ||
| 47 | MDMM - MATNR | Material Number | ||
| 48 | MDPERF - EXPLT | MRP run: Time for BOM explosion | ||
| 49 | MDPERF - LOTST | MRP run: Time for calculating net requirements and lot-size | ||
| 50 | MDPERF - MATNR | Material Number | ||
| 51 | MDPERF - POSTT | MRP run: Time for posting | ||
| 52 | MDPERF - READT | MRP run: Time required for reading the initial situation | ||
| 53 | MDPERF - RTIME | MRP run: Total duration for each material | ||
| 54 | MDPERF - SCHET | MRP run: Time required for lead time scheduling | ||
| 55 | MDPERF - WERKS | Plant | ||
| 56 | MDSTATS - EINZT | MRP run: Time for evaluating the operating time | ||
| 57 | MDSTATS - SCHET | MRP run: Time required for lead time scheduling | ||
| 58 | MDSTATS - RESBT | MRP run: Time required for saving dependent requirements | ||
| 59 | MDSTATS - READT | MRP run: Time required for reading the initial situation | ||
| 60 | MDSTATS - POSTT | MRP run: Time for posting | ||
| 61 | MDSTATS - MDTBT | MRP run: Time for deleting/saving MRP list | ||
| 62 | MDSTATS - LOTST | MRP run: Time for calculating net requirements and lot-size | ||
| 63 | MDSTATS - EXPLT | MRP run: Time for BOM explosion | ||
| 64 | MDSTATS - ARBPT | MRP run: Time to read routing | ||
| 65 | MT61D - BERID | MRP Area | SOURCE VALUE(IV_BERID) LIKE MT61D-BERID DEFAULT SPACE |
|
| 66 | MT61D - WERKS | Plant | ||
| 67 | MT61D - WERKS | Plant | SOURCE VALUE(IV_PLANT) LIKE MT61D-WERKS |
|
| 68 | MT61D - MATNR | Material Number | SOURCE VALUE(IV_MATERIAL) LIKE MT61D-MATNR |
|
| 69 | MT61D - DISST | Low-level code | ||
| 70 | MT61D - BERID | MRP Area | ||
| 71 | MT61D - MATNR | Material Number | ||
| 72 | PPH_MATNR_WERKS_BERID_SEL - BERID | MRP Area | ||
| 73 | PPH_MATNR_WERKS_BERID_SEL - MATNR | Material Number | ||
| 74 | PPH_MATNR_WERKS_BERID_SEL - WERKS | Plant | ||
| 75 | RM61X - ANZDL | Display MRP result | ||
| 76 | RM61X - ANZMT | Number of materials that were planned | SOURCE REFERENCE(EV_COUNT_MATERIALS) LIKE RM61X-ANZMT |
|
| 77 | RM61X - ANZMT | Number of materials that were planned | ||
| 78 | RM61X - ANZEX | Number of Materials with Termination | SOURCE REFERENCE(EV_COUNT_ABENDS) LIKE RM61X-ANZEX |
|
| 79 | RM61X - ANZEX | Number of Materials with Termination | ||
| 80 | RM61X - ANZAM | Number of materials with exception messages | SOURCE REFERENCE(EV_COUNT_WARNINGS) LIKE RM61X-ANZAM |
|
| 81 | RM61X - ANZAM | Number of materials with exception messages | ||
| 82 | SYST - DATUM | ABAP System Field: Current Date of Application Server | ||
| 83 | SYST - MSGV1 | ABAP System Field: Message Variable | ||
| 84 | SYST - TABIX | ABAP System Field: Row Index of Internal Tables | ||
| 85 | T000MD - UDBVM | Planning file entries for MRP area converted |