Table/Structure Field list used by SAP ABAP Function Module MAP2E_CM61M_TO_BAPI_MRP_CONTRO (cm61m -> bapi_mrp_control_param)
SAP ABAP Function Module
MAP2E_CM61M_TO_BAPI_MRP_CONTRO (cm61m -> bapi_mrp_control_param) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
![]() |
![]() |
|||
1 | ![]() |
BAPI_MRP_CONTROL_PARAM - ADJUSTMENT_INDICATOR | Adjustment of Planned Independent Requirements | |
2 | ![]() |
BAPI_MRP_CONTROL_PARAM - ADJUSTMENT_PERIOD | Period of adjustment for planned independent requirements | |
3 | ![]() |
BAPI_MRP_CONTROL_PARAM - ATP_FULL_CONF_LOGIC | ATP check by full confirmation logic | |
4 | ![]() |
BAPI_MRP_CONTROL_PARAM - AVAIL_SAFETY_STCK | Share of safety stock which can be used for planning | |
5 | ![]() |
BAPI_MRP_CONTROL_PARAM - BWD_CONS | Consumption period: backward | |
6 | ![]() |
BAPI_MRP_CONTROL_PARAM - CHECK_RULE | Checking rule for the availability check | |
7 | ![]() |
BAPI_MRP_CONTROL_PARAM - CONF_MATERIAL | Configurable material | |
8 | ![]() |
BAPI_MRP_CONTROL_PARAM - CONSUMMODE | Consumption mode | |
9 | ![]() |
BAPI_MRP_CONTROL_PARAM - COVERAGE_HOR_01 | Planning horizon for range of coverage 01 | |
10 | ![]() |
BAPI_MRP_CONTROL_PARAM - COVERAGE_HOR_02 | Planning horizon for range of coverage 02 | |
11 | ![]() |
BAPI_MRP_CONTROL_PARAM - COVERAGE_SAFETY_STCK | Calculate safety stock based on range of coverage | |
12 | ![]() |
BAPI_MRP_CONTROL_PARAM - CREATE_MRP_LIST | Creation Indicator for MRP Lists | |
13 | ![]() |
BAPI_MRP_CONTROL_PARAM - CREATE_PURREQ | Creation Indicator for Purchase Requisitions | |
14 | ![]() |
BAPI_MRP_CONTROL_PARAM - CREATE_SCHED_LINES | Automatic Schedule Lines (Scheduling Agreements) | |
15 | ![]() |
BAPI_MRP_CONTROL_PARAM - DAYS_PER_PERIOD | Number of days per range of coverage period | |
16 | ![]() |
BAPI_MRP_CONTROL_PARAM - DECIMAL_RD | No. of decimal places to which rounding should be performed | |
17 | ![]() |
BAPI_MRP_CONTROL_PARAM - DET_BOM_EXPL_DATE | Determine Explosion Date for BOM and Routing | |
18 | ![]() |
BAPI_MRP_CONTROL_PARAM - END_ADJUSTMENT_PERIOD | End of adjustment period for planned independent reqmts | |
19 | ![]() |
BAPI_MRP_CONTROL_PARAM - END_PLAN_HORIZON | End of planning horizon | |
20 | ![]() |
BAPI_MRP_CONTROL_PARAM - END_REP_LEAD_TIME | End of replenishment lead time | |
21 | ![]() |
BAPI_MRP_CONTROL_PARAM - END_REQ_PERIOD | End of the requirements period for time-phased MRP | |
22 | ![]() |
BAPI_MRP_CONTROL_PARAM - END_RESCHED_HORIZON | End of rescheduling horizon (date) | |
23 | ![]() |
BAPI_MRP_CONTROL_PARAM - END_ROLL_FWD_PERIOD | End of roll forward period | |
24 | ![]() |
BAPI_MRP_CONTROL_PARAM - EXCLUDE_BULK_ITEMS | Do Not Explode Bulk Material Items | |
25 | ![]() |
BAPI_MRP_CONTROL_PARAM - FIRMING_TYPE | Firming Type of the Planning Result | |
26 | ![]() |
BAPI_MRP_CONTROL_PARAM - FIRM_DATE | Manual firming date | |
27 | ![]() |
BAPI_MRP_CONTROL_PARAM - FIRM_DATE_CHANGED | Indicator: MFXDT changed | |
28 | ![]() |
BAPI_MRP_CONTROL_PARAM - FIRM_PRINTED_SCHED_LINES | Firm Only Schedule Lines Transmitted to Vendor by Purchasing | |
29 | ![]() |
BAPI_MRP_CONTROL_PARAM - FWD_CONS | Consumption period: forward | |
30 | ![]() |
BAPI_MRP_CONTROL_PARAM - GRP_REQMNT | Relevant for requirements grouping for project stock | |
31 | ![]() |
BAPI_MRP_CONTROL_PARAM - GRP_REQMTS | Indicator for Requirements Grouping | |
32 | ![]() |
BAPI_MRP_CONTROL_PARAM - INCLUDE_EXT_REQ | Reorder point planning with external requirements | |
33 | ![]() |
BAPI_MRP_CONTROL_PARAM - IND_DIR_PROC_PROD | Indicator: direct procurement/production MRP | |
34 | ![]() |
BAPI_MRP_CONTROL_PARAM - ISSUE_STORAGE_LOCATION_SELECT | Issue Storage Location Selection | |
35 | ![]() |
BAPI_MRP_CONTROL_PARAM - MAN_TIME_FENCE | Planning time fence set manually (MFXDT) | |
36 | ![]() |
BAPI_MRP_CONTROL_PARAM - MAX_COVERAGE_01 | Target Range of Coverage in Period 01 | |
37 | ![]() |
BAPI_MRP_CONTROL_PARAM - MAX_COVERAGE_02 | Target Range of Coverage in Period 01 | |
38 | ![]() |
BAPI_MRP_CONTROL_PARAM - MAX_COVERAGE_03 | Target Range of Coverage in Period 01 | |
39 | ![]() |
BAPI_MRP_CONTROL_PARAM - MAX_NUM_DAYS_WO_MRP | Number of Days After Which the Material Must Be Planned | |
40 | ![]() |
BAPI_MRP_CONTROL_PARAM - MIN_COVERAGE_01 | Target Range of Coverage in Period 01 | |
41 | ![]() |
BAPI_MRP_CONTROL_PARAM - MIN_COVERAGE_02 | Target Range of Coverage in Period 01 | |
42 | ![]() |
BAPI_MRP_CONTROL_PARAM - MIN_COVERAGE_03 | Target Range of Coverage in Period 01 | |
43 | ![]() |
BAPI_MRP_CONTROL_PARAM - MRP_RELEVANCY_DEP_REQUIREMENTS | MRP relevancy for dependent requirements | |
44 | ![]() |
BAPI_MRP_CONTROL_PARAM - NUM_PERIODS | Number of periods for determining the average | |
45 | ![]() |
BAPI_MRP_CONTROL_PARAM - OP_FIRM_DATE | Date of firm planned order last copied from MRP | |
46 | ![]() |
BAPI_MRP_CONTROL_PARAM - OP_FIRM_DATE_CHANGED | Indicator:OPFDT changed | |
47 | ![]() |
BAPI_MRP_CONTROL_PARAM - ORD_RESERVATIONS | Dependent reservation - standard orders | |
48 | ![]() |
BAPI_MRP_CONTROL_PARAM - PERIOD_IND | Period for Calculating the Dynamic Safety Stock | |
49 | ![]() |
BAPI_MRP_CONTROL_PARAM - PERIOD_LENGTH_TYPE | Period length type for calculating the average | |
50 | ![]() |
BAPI_MRP_CONTROL_PARAM - PIR_W_ASSEMBLY | Single-Character Flag | |
51 | ![]() |
BAPI_MRP_CONTROL_PARAM - PIR_W_O_ASSEMBLY | Single-Character Flag | |
52 | ![]() |
BAPI_MRP_CONTROL_PARAM - PLANNING_IND | Planning Indicator | |
53 | ![]() |
BAPI_MRP_CONTROL_PARAM - PLANNING_TIME_FENCE | End of planning time fence (date) | |
54 | ![]() |
BAPI_MRP_CONTROL_PARAM - PLAN_HORIZON | Planning horizon | |
55 | ![]() |
BAPI_MRP_CONTROL_PARAM - PLAN_REGULARLY | Indicator: plan material regularly | |
56 | ![]() |
BAPI_MRP_CONTROL_PARAM - PLAN_VARIANT | Planning Variant | |
57 | ![]() |
BAPI_MRP_CONTROL_PARAM - PLND_DELRY | Planned delivery time in days | |
58 | ![]() |
BAPI_MRP_CONTROL_PARAM - PL_TI_FNCE | Planning time fence | |
59 | ![]() |
BAPI_MRP_CONTROL_PARAM - PM_QM_RESERVATIONS | Dependent reservation - plant maintenance orders and network | |
60 | ![]() |
BAPI_MRP_CONTROL_PARAM - PUR_REQ_REL | Delivery schedule for a stock transfer requisition | |
61 | ![]() |
BAPI_MRP_CONTROL_PARAM - PUR_REQ_TYPE_STANDARD | MRP:doc.type purchase requisitions for standard purchase ord | |
62 | ![]() |
BAPI_MRP_CONTROL_PARAM - PUR_REQ_TYPE_STKTRANS | MRP: purchase requisition for stock transfer - document type | |
63 | ![]() |
BAPI_MRP_CONTROL_PARAM - PUR_REQ_TYPE_SUBCONT | MRP: Document type purchase requisition for subcontracting | |
64 | ![]() |
BAPI_MRP_CONTROL_PARAM - QTY_UPDATE | Quantity Updating in Material Master Record | |
65 | ![]() |
BAPI_MRP_CONTROL_PARAM - QUOTAUSAGE | Quota arrangement usage | |
66 | ![]() |
BAPI_MRP_CONTROL_PARAM - REPL_LEAD_TIME | End of replenishment lead time | |
67 | ![]() |
BAPI_MRP_CONTROL_PARAM - REP_MAN_TYPE | Single-Character Flag | |
68 | ![]() |
BAPI_MRP_CONTROL_PARAM - RESCHED_HORIZON | Rescheduling horizon | |
69 | ![]() |
BAPI_MRP_CONTROL_PARAM - ROLL_FWD_IND | Indicator: delete firm planned orders | |
70 | ![]() |
BAPI_MRP_CONTROL_PARAM - ROLL_FWD_PERIOD | Roll forward period for the master plan | |
71 | ![]() |
BAPI_MRP_CONTROL_PARAM - SCHEDULING_W_PUR_DOCS | Scheduling according to purchasing info record or agreement | |
72 | ![]() |
BAPI_MRP_CONTROL_PARAM - SCHED_LINES_REL | Delivery schedule for stock transport scheduling agreement | |
73 | ![]() |
BAPI_MRP_CONTROL_PARAM - SELECTION_DATE | Above selection date | |
74 | ![]() |
BAPI_MRP_CONTROL_PARAM - SET_FIRM_DATE | Set manual firming date: Date to set | |
75 | ![]() |
BAPI_MRP_CONTROL_PARAM - START_IN_PAST | Start date of order proposals allowed in the past | |
76 | ![]() |
BAPI_MRP_CONTROL_PARAM - STK_TRANSFER | Indicator for Stock Transfer with MRP Areas | |
77 | ![]() |
BAPI_MRP_CONTROL_PARAM - STK_TRANS_REL | Release for stock transfer order | |
78 | ![]() |
BAPI_MRP_CONTROL_PARAM - SUBCONT_LOGIC | Indicator: General Subcontracting Logic | |
79 | ![]() |
BAPI_MRP_CONTROL_PARAM - SUBC_REQMT | Material staging reqmts (subcontr. reqmts) MRP element BB | |
80 | ![]() |
BAPI_MRP_CONTROL_PARAM - TARGET_COVERAGE_01 | Target Range of Coverage in Period 01 | |
81 | ![]() |
BAPI_MRP_CONTROL_PARAM - TARGET_COVERAGE_02 | Target Range of Coverage in Period 02 | |
82 | ![]() |
BAPI_MRP_CONTROL_PARAM - TARGET_COVERAGE_03 | Target Range of Coverage in the Rest of the Period | |
83 | ![]() |
BAPI_MRP_CONTROL_PARAM - TIME_STAMP | Last Change to Planned Order: Time Stamp | |
84 | ![]() |
BAPI_MRP_CONTROL_PARAM - TOL_VAL_DISPLACEMENT | Tolerance value for displacement in the future | |
85 | ![]() |
BAPI_MRP_CONTROL_PARAM - TOL_VAL_FORWARD | Tolerance value for bringing forward receipt elements | |
86 | ![]() |
BAPI_MRP_CONTROL_PARAM - TOTALSALES | Total sales order requirements | |
87 | ![]() |
BAPI_MRP_CONTROL_PARAM - TOTAL_REQMNTS | Aggregated dependent requirements | |
88 | ![]() |
BAPI_MRP_CONTROL_PARAM - TPL_PLANNING_DATE | Next planning date for time-phased planning | |
89 | ![]() |
BAPI_MRP_CONTROL_PARAM - TPL_W_REQ | Time-phased planning with requirements (MRP) | |
90 | ![]() |
BAPI_MRP_CONTROL_PARAM - USER_FIRM_DATE | Set manual firming date: User | |
91 | ![]() |
BAPI_MRP_CONTROL_PARAM - VAL_UPDATE | Value Updating in Material Master Record | |
92 | ![]() |
BAPI_MRP_CONTROL_PARAM - W_O_PHANTOMS | No requirements for phantom assembly | |
93 | ![]() |
CM61M - A1BED | Dependent reservation - standard orders | |
94 | ![]() |
CM61M - A2BED | Dependent reservation - plant maintenance orders and network | |
95 | ![]() |
CM61M - AGREQ | Aggregated dependent requirements | |
96 | ![]() |
CM61M - AHDIS | MRP relevancy for dependent requirements | |
97 | ![]() |
CM61M - ANDEC | No. of decimal places to which rounding should be performed | |
98 | ![]() |
CM61M - ANDIS | Number of Days After Which the Material Must Be Planned | |
99 | ![]() |
CM61M - BANER | Creation Indicator for Purchase Requisitions | |
100 | ![]() |
CM61M - BARTL | MRP: Document type purchase requisition for subcontracting | |
101 | ![]() |
CM61M - BARTU | MRP: purchase requisition for stock transfer - document type | |
102 | ![]() |
CM61M - BBBED | Material staging reqmts (subcontr. reqmts) MRP element BB | |
103 | ![]() |
CM61M - BESAL | Determine Explosion Date for BOM and Routing | |
104 | ![]() |
CM61M - BSART | MRP:doc.type purchase requisitions for standard purchase ord | |
105 | ![]() |
CM61M - DISER | Creation Indicator for MRP Lists | |
106 | ![]() |
CM61M - ENDWZ | End of replenishment lead time | |
107 | ![]() |
CM61M - EXSGT | Do Not Explode Bulk Material Items | |
108 | ![]() |
CM61M - FIXTR | End of planning time fence (date) | |
109 | ![]() |
CM61M - FKOBS | ATP check by full confirmation logic | |
110 | ![]() |
CM61M - FXART | Firming Type of the Planning Result | |
111 | ![]() |
CM61M - FXHOR | Planning time fence | |
112 | ![]() |
CM61M - GRREL | Relevant for requirements grouping for project stock | |
113 | ![]() |
CM61M - GTERM | Scheduling according to purchasing info record or agreement | |
114 | ![]() |
CM61M - ICBED | Reorder point planning with external requirements | |
115 | ![]() |
CM61M - KZBED | Indicator for Requirements Grouping | |
116 | ![]() |
CM61M - KZDRB | Indicator: direct procurement/production MRP | |
117 | ![]() |
CM61M - KZREG | Indicator: plan material regularly | |
118 | ![]() |
CM61M - LIFKZ | Automatic Schedule Lines (Scheduling Agreements) | |
119 | ![]() |
CM61M - MARW1 | Target Range of Coverage in Period 01 | |
120 | ![]() |
CM61M - MARW2 | Target Range of Coverage in Period 01 | |
121 | ![]() |
CM61M - MARW3 | Target Range of Coverage in Period 01 | |
122 | ![]() |
CM61M - MENGU | Quantity Updating in Material Master Record | |
123 | ![]() |
CM61M - MFDAT | Set manual firming date: Date to set | |
124 | ![]() |
CM61M - MFHKZ | Planning time fence set manually (MFXDT) | |
125 | ![]() |
CM61M - MFNAM | Set manual firming date: User | |
126 | ![]() |
CM61M - MFXDT | Manual firming date | |
127 | ![]() |
CM61M - MFXKZ | Indicator: MFXDT changed | |
128 | ![]() |
CM61M - MIRW1 | Target Range of Coverage in Period 01 | |
129 | ![]() |
CM61M - MIRW2 | Target Range of Coverage in Period 01 | |
130 | ![]() |
CM61M - MIRW3 | Target Range of Coverage in Period 01 | |
131 | ![]() |
CM61M - NODUM | No requirements for phantom assembly | |
132 | ![]() |
CM61M - OPFDT | Date of firm planned order last copied from MRP | |
133 | ![]() |
CM61M - OPFKZ | Indicator:OPFDT changed | |
134 | ![]() |
CM61M - OSELT | Above selection date | |
135 | ![]() |
CM61M - PLAHZ | Planning horizon | |
136 | ![]() |
CM61M - PLIFZ | Planned delivery time in days | |
137 | ![]() |
CM61M - PLNKZ | Planning Indicator | |
138 | ![]() |
CM61M - PLSEL | Issue Storage Location Selection | |
139 | ![]() |
CM61M - PLTER | End of planning horizon | |
140 | ![]() |
CM61M - PRREG | Checking rule for the availability check | |
141 | ![]() |
CM61M - PSTMP | Last Change to Planned Order: Time Stamp | |
142 | ![]() |
CM61M - RESHZ | Roll forward period for the master plan | |
143 | ![]() |
CM61M - RESPL | Indicator: delete firm planned orders | |
144 | ![]() |
CM61M - RESVP | Period of adjustment for planned independent requirements | |
145 | ![]() |
CM61M - RHDAT | Next planning date for time-phased planning | |
146 | ![]() |
CM61M - RHEND | End of the requirements period for time-phased MRP | |
147 | ![]() |
CM61M - RSTER | End of roll forward period | |
148 | ![]() |
CM61M - RVPKZ | Adjustment of Planned Independent Requirements | |
149 | ![]() |
CM61M - RVPTR | End of adjustment period for planned independent reqmts | |
150 | ![]() |
CM61M - RW1DT | Planning horizon for range of coverage 01 | |
151 | ![]() |
CM61M - RW1TG | Target Range of Coverage in Period 01 | |
152 | ![]() |
CM61M - RW2DT | Planning horizon for range of coverage 02 | |
153 | ![]() |
CM61M - RW2TG | Target Range of Coverage in Period 02 | |
154 | ![]() |
CM61M - RW3TG | Target Range of Coverage in the Rest of the Period | |
155 | ![]() |
CM61M - RWANZ | Number of periods for determining the average | |
156 | ![]() |
CM61M - RWART | Period length type for calculating the average | |
157 | ![]() |
CM61M - RWFLG | Calculate safety stock based on range of coverage | |
158 | ![]() |
CM61M - RWNTG | Number of days per range of coverage period | |
159 | ![]() |
CM61M - RWPER | Period for Calculating the Dynamic Safety Stock | |
160 | ![]() |
CM61M - RYBED | Time-phased planning with requirements (MRP) | |
161 | ![]() |
CM61M - SBDIS | Share of safety stock which can be used for planning | |
162 | ![]() |
CM61M - SCFLG | Indicator: General Subcontracting Logic | |
163 | ![]() |
CM61M - SETYP | Single-Character Flag | |
164 | ![]() |
CM61M - STDPD | Configurable material | |
165 | ![]() |
CM61M - SUMAU | Total sales order requirements | |
166 | ![]() |
CM61M - U1BED | Release for stock transfer order | |
167 | ![]() |
CM61M - U2BED | Delivery schedule for a stock transfer requisition | |
168 | ![]() |
CM61M - U4BED | Delivery schedule for stock transport scheduling agreement | |
169 | ![]() |
CM61M - UMLDB | Indicator for Stock Transfer with MRP Areas | |
170 | ![]() |
CM61M - UMTER | End of rescheduling horizon (date) | |
171 | ![]() |
CM61M - UMTHZ | Rescheduling horizon | |
172 | ![]() |
CM61M - USEQU | Quota arrangement usage | |
173 | ![]() |
CM61M - VERTR | Start date of order proposals allowed in the past | |
174 | ![]() |
CM61M - VINT1 | Consumption period: backward | |
175 | ![]() |
CM61M - VINT2 | Consumption period: forward | |
176 | ![]() |
CM61M - VPLAN | Single-Character Flag | |
177 | ![]() |
CM61M - VPLAV | Single-Character Flag | |
178 | ![]() |
CM61M - VRMOD | Consumption mode | |
179 | ![]() |
CM61M - VTYPE | Planning Variant | |
180 | ![]() |
CM61M - VWVER | Tolerance value for displacement in the future | |
181 | ![]() |
CM61M - VWVOR | Tolerance value for bringing forward receipt elements | |
182 | ![]() |
CM61M - WERTU | Value Updating in Material Master Record | |
183 | ![]() |
CM61M - WZTER | End of replenishment lead time | |
184 | ![]() |
CM61M - XFAT1 | Firm Only Schedule Lines Transmitted to Vendor by Purchasing | |
185 | ![]() |
MDFDI - MFDAT | Set manual firming date: Date to set | |
186 | ![]() |
MDFDI - MFNAM | Set manual firming date: User | |
187 | ![]() |
MDFDI - MFXDT | Manual firming date | |
188 | ![]() |
MDFDI - OPFDT | Date of firm planned order last copied from MRP |