Table/Structure Field list used by SAP ABAP Function Module MAP2E_CM61M_TO_BAPI_MRP_CONTRO (cm61m -> bapi_mrp_control_param)
SAP ABAP Function Module
MAP2E_CM61M_TO_BAPI_MRP_CONTRO (cm61m -> bapi_mrp_control_param) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | BAPI_MRP_CONTROL_PARAM - ADJUSTMENT_INDICATOR | Adjustment of Planned Independent Requirements | ||
| 2 | BAPI_MRP_CONTROL_PARAM - ADJUSTMENT_PERIOD | Period of adjustment for planned independent requirements | ||
| 3 | BAPI_MRP_CONTROL_PARAM - ATP_FULL_CONF_LOGIC | ATP check by full confirmation logic | ||
| 4 | BAPI_MRP_CONTROL_PARAM - AVAIL_SAFETY_STCK | Share of safety stock which can be used for planning | ||
| 5 | BAPI_MRP_CONTROL_PARAM - BWD_CONS | Consumption period: backward | ||
| 6 | BAPI_MRP_CONTROL_PARAM - CHECK_RULE | Checking rule for the availability check | ||
| 7 | BAPI_MRP_CONTROL_PARAM - CONF_MATERIAL | Configurable material | ||
| 8 | BAPI_MRP_CONTROL_PARAM - CONSUMMODE | Consumption mode | ||
| 9 | BAPI_MRP_CONTROL_PARAM - COVERAGE_HOR_01 | Planning horizon for range of coverage 01 | ||
| 10 | BAPI_MRP_CONTROL_PARAM - COVERAGE_HOR_02 | Planning horizon for range of coverage 02 | ||
| 11 | BAPI_MRP_CONTROL_PARAM - COVERAGE_SAFETY_STCK | Calculate safety stock based on range of coverage | ||
| 12 | BAPI_MRP_CONTROL_PARAM - CREATE_MRP_LIST | Creation Indicator for MRP Lists | ||
| 13 | BAPI_MRP_CONTROL_PARAM - CREATE_PURREQ | Creation Indicator for Purchase Requisitions | ||
| 14 | BAPI_MRP_CONTROL_PARAM - CREATE_SCHED_LINES | Automatic Schedule Lines (Scheduling Agreements) | ||
| 15 | BAPI_MRP_CONTROL_PARAM - DAYS_PER_PERIOD | Number of days per range of coverage period | ||
| 16 | BAPI_MRP_CONTROL_PARAM - DECIMAL_RD | No. of decimal places to which rounding should be performed | ||
| 17 | BAPI_MRP_CONTROL_PARAM - DET_BOM_EXPL_DATE | Determine Explosion Date for BOM and Routing | ||
| 18 | BAPI_MRP_CONTROL_PARAM - END_ADJUSTMENT_PERIOD | End of adjustment period for planned independent reqmts | ||
| 19 | BAPI_MRP_CONTROL_PARAM - END_PLAN_HORIZON | End of planning horizon | ||
| 20 | BAPI_MRP_CONTROL_PARAM - END_REP_LEAD_TIME | End of replenishment lead time | ||
| 21 | BAPI_MRP_CONTROL_PARAM - END_REQ_PERIOD | End of the requirements period for time-phased MRP | ||
| 22 | BAPI_MRP_CONTROL_PARAM - END_RESCHED_HORIZON | End of rescheduling horizon (date) | ||
| 23 | BAPI_MRP_CONTROL_PARAM - END_ROLL_FWD_PERIOD | End of roll forward period | ||
| 24 | BAPI_MRP_CONTROL_PARAM - EXCLUDE_BULK_ITEMS | Do Not Explode Bulk Material Items | ||
| 25 | BAPI_MRP_CONTROL_PARAM - FIRMING_TYPE | Firming Type of the Planning Result | ||
| 26 | BAPI_MRP_CONTROL_PARAM - FIRM_DATE | Manual firming date | ||
| 27 | BAPI_MRP_CONTROL_PARAM - FIRM_DATE_CHANGED | Indicator: MFXDT changed | ||
| 28 | BAPI_MRP_CONTROL_PARAM - FIRM_PRINTED_SCHED_LINES | Firm Only Schedule Lines Transmitted to Vendor by Purchasing | ||
| 29 | BAPI_MRP_CONTROL_PARAM - FWD_CONS | Consumption period: forward | ||
| 30 | BAPI_MRP_CONTROL_PARAM - GRP_REQMNT | Relevant for requirements grouping for project stock | ||
| 31 | BAPI_MRP_CONTROL_PARAM - GRP_REQMTS | Indicator for Requirements Grouping | ||
| 32 | BAPI_MRP_CONTROL_PARAM - INCLUDE_EXT_REQ | Reorder point planning with external requirements | ||
| 33 | BAPI_MRP_CONTROL_PARAM - IND_DIR_PROC_PROD | Indicator: direct procurement/production MRP | ||
| 34 | BAPI_MRP_CONTROL_PARAM - ISSUE_STORAGE_LOCATION_SELECT | Issue Storage Location Selection | ||
| 35 | BAPI_MRP_CONTROL_PARAM - MAN_TIME_FENCE | Planning time fence set manually (MFXDT) | ||
| 36 | BAPI_MRP_CONTROL_PARAM - MAX_COVERAGE_01 | Target Range of Coverage in Period 01 | ||
| 37 | BAPI_MRP_CONTROL_PARAM - MAX_COVERAGE_02 | Target Range of Coverage in Period 01 | ||
| 38 | BAPI_MRP_CONTROL_PARAM - MAX_COVERAGE_03 | Target Range of Coverage in Period 01 | ||
| 39 | BAPI_MRP_CONTROL_PARAM - MAX_NUM_DAYS_WO_MRP | Number of Days After Which the Material Must Be Planned | ||
| 40 | BAPI_MRP_CONTROL_PARAM - MIN_COVERAGE_01 | Target Range of Coverage in Period 01 | ||
| 41 | BAPI_MRP_CONTROL_PARAM - MIN_COVERAGE_02 | Target Range of Coverage in Period 01 | ||
| 42 | BAPI_MRP_CONTROL_PARAM - MIN_COVERAGE_03 | Target Range of Coverage in Period 01 | ||
| 43 | BAPI_MRP_CONTROL_PARAM - MRP_RELEVANCY_DEP_REQUIREMENTS | MRP relevancy for dependent requirements | ||
| 44 | BAPI_MRP_CONTROL_PARAM - NUM_PERIODS | Number of periods for determining the average | ||
| 45 | BAPI_MRP_CONTROL_PARAM - OP_FIRM_DATE | Date of firm planned order last copied from MRP | ||
| 46 | BAPI_MRP_CONTROL_PARAM - OP_FIRM_DATE_CHANGED | Indicator:OPFDT changed | ||
| 47 | BAPI_MRP_CONTROL_PARAM - ORD_RESERVATIONS | Dependent reservation - standard orders | ||
| 48 | BAPI_MRP_CONTROL_PARAM - PERIOD_IND | Period for Calculating the Dynamic Safety Stock | ||
| 49 | BAPI_MRP_CONTROL_PARAM - PERIOD_LENGTH_TYPE | Period length type for calculating the average | ||
| 50 | BAPI_MRP_CONTROL_PARAM - PIR_W_ASSEMBLY | Single-Character Flag | ||
| 51 | BAPI_MRP_CONTROL_PARAM - PIR_W_O_ASSEMBLY | Single-Character Flag | ||
| 52 | BAPI_MRP_CONTROL_PARAM - PLANNING_IND | Planning Indicator | ||
| 53 | BAPI_MRP_CONTROL_PARAM - PLANNING_TIME_FENCE | End of planning time fence (date) | ||
| 54 | BAPI_MRP_CONTROL_PARAM - PLAN_HORIZON | Planning horizon | ||
| 55 | BAPI_MRP_CONTROL_PARAM - PLAN_REGULARLY | Indicator: plan material regularly | ||
| 56 | BAPI_MRP_CONTROL_PARAM - PLAN_VARIANT | Planning Variant | ||
| 57 | BAPI_MRP_CONTROL_PARAM - PLND_DELRY | Planned delivery time in days | ||
| 58 | BAPI_MRP_CONTROL_PARAM - PL_TI_FNCE | Planning time fence | ||
| 59 | BAPI_MRP_CONTROL_PARAM - PM_QM_RESERVATIONS | Dependent reservation - plant maintenance orders and network | ||
| 60 | BAPI_MRP_CONTROL_PARAM - PUR_REQ_REL | Delivery schedule for a stock transfer requisition | ||
| 61 | BAPI_MRP_CONTROL_PARAM - PUR_REQ_TYPE_STANDARD | MRP:doc.type purchase requisitions for standard purchase ord | ||
| 62 | BAPI_MRP_CONTROL_PARAM - PUR_REQ_TYPE_STKTRANS | MRP: purchase requisition for stock transfer - document type | ||
| 63 | BAPI_MRP_CONTROL_PARAM - PUR_REQ_TYPE_SUBCONT | MRP: Document type purchase requisition for subcontracting | ||
| 64 | BAPI_MRP_CONTROL_PARAM - QTY_UPDATE | Quantity Updating in Material Master Record | ||
| 65 | BAPI_MRP_CONTROL_PARAM - QUOTAUSAGE | Quota arrangement usage | ||
| 66 | BAPI_MRP_CONTROL_PARAM - REPL_LEAD_TIME | End of replenishment lead time | ||
| 67 | BAPI_MRP_CONTROL_PARAM - REP_MAN_TYPE | Single-Character Flag | ||
| 68 | BAPI_MRP_CONTROL_PARAM - RESCHED_HORIZON | Rescheduling horizon | ||
| 69 | BAPI_MRP_CONTROL_PARAM - ROLL_FWD_IND | Indicator: delete firm planned orders | ||
| 70 | BAPI_MRP_CONTROL_PARAM - ROLL_FWD_PERIOD | Roll forward period for the master plan | ||
| 71 | BAPI_MRP_CONTROL_PARAM - SCHEDULING_W_PUR_DOCS | Scheduling according to purchasing info record or agreement | ||
| 72 | BAPI_MRP_CONTROL_PARAM - SCHED_LINES_REL | Delivery schedule for stock transport scheduling agreement | ||
| 73 | BAPI_MRP_CONTROL_PARAM - SELECTION_DATE | Above selection date | ||
| 74 | BAPI_MRP_CONTROL_PARAM - SET_FIRM_DATE | Set manual firming date: Date to set | ||
| 75 | BAPI_MRP_CONTROL_PARAM - START_IN_PAST | Start date of order proposals allowed in the past | ||
| 76 | BAPI_MRP_CONTROL_PARAM - STK_TRANSFER | Indicator for Stock Transfer with MRP Areas | ||
| 77 | BAPI_MRP_CONTROL_PARAM - STK_TRANS_REL | Release for stock transfer order | ||
| 78 | BAPI_MRP_CONTROL_PARAM - SUBCONT_LOGIC | Indicator: General Subcontracting Logic | ||
| 79 | BAPI_MRP_CONTROL_PARAM - SUBC_REQMT | Material staging reqmts (subcontr. reqmts) MRP element BB | ||
| 80 | BAPI_MRP_CONTROL_PARAM - TARGET_COVERAGE_01 | Target Range of Coverage in Period 01 | ||
| 81 | BAPI_MRP_CONTROL_PARAM - TARGET_COVERAGE_02 | Target Range of Coverage in Period 02 | ||
| 82 | BAPI_MRP_CONTROL_PARAM - TARGET_COVERAGE_03 | Target Range of Coverage in the Rest of the Period | ||
| 83 | BAPI_MRP_CONTROL_PARAM - TIME_STAMP | Last Change to Planned Order: Time Stamp | ||
| 84 | BAPI_MRP_CONTROL_PARAM - TOL_VAL_DISPLACEMENT | Tolerance value for displacement in the future | ||
| 85 | BAPI_MRP_CONTROL_PARAM - TOL_VAL_FORWARD | Tolerance value for bringing forward receipt elements | ||
| 86 | BAPI_MRP_CONTROL_PARAM - TOTALSALES | Total sales order requirements | ||
| 87 | BAPI_MRP_CONTROL_PARAM - TOTAL_REQMNTS | Aggregated dependent requirements | ||
| 88 | BAPI_MRP_CONTROL_PARAM - TPL_PLANNING_DATE | Next planning date for time-phased planning | ||
| 89 | BAPI_MRP_CONTROL_PARAM - TPL_W_REQ | Time-phased planning with requirements (MRP) | ||
| 90 | BAPI_MRP_CONTROL_PARAM - USER_FIRM_DATE | Set manual firming date: User | ||
| 91 | BAPI_MRP_CONTROL_PARAM - VAL_UPDATE | Value Updating in Material Master Record | ||
| 92 | BAPI_MRP_CONTROL_PARAM - W_O_PHANTOMS | No requirements for phantom assembly | ||
| 93 | CM61M - A1BED | Dependent reservation - standard orders | ||
| 94 | CM61M - A2BED | Dependent reservation - plant maintenance orders and network | ||
| 95 | CM61M - AGREQ | Aggregated dependent requirements | ||
| 96 | CM61M - AHDIS | MRP relevancy for dependent requirements | ||
| 97 | CM61M - ANDEC | No. of decimal places to which rounding should be performed | ||
| 98 | CM61M - ANDIS | Number of Days After Which the Material Must Be Planned | ||
| 99 | CM61M - BANER | Creation Indicator for Purchase Requisitions | ||
| 100 | CM61M - BARTL | MRP: Document type purchase requisition for subcontracting | ||
| 101 | CM61M - BARTU | MRP: purchase requisition for stock transfer - document type | ||
| 102 | CM61M - BBBED | Material staging reqmts (subcontr. reqmts) MRP element BB | ||
| 103 | CM61M - BESAL | Determine Explosion Date for BOM and Routing | ||
| 104 | CM61M - BSART | MRP:doc.type purchase requisitions for standard purchase ord | ||
| 105 | CM61M - DISER | Creation Indicator for MRP Lists | ||
| 106 | CM61M - ENDWZ | End of replenishment lead time | ||
| 107 | CM61M - EXSGT | Do Not Explode Bulk Material Items | ||
| 108 | CM61M - FIXTR | End of planning time fence (date) | ||
| 109 | CM61M - FKOBS | ATP check by full confirmation logic | ||
| 110 | CM61M - FXART | Firming Type of the Planning Result | ||
| 111 | CM61M - FXHOR | Planning time fence | ||
| 112 | CM61M - GRREL | Relevant for requirements grouping for project stock | ||
| 113 | CM61M - GTERM | Scheduling according to purchasing info record or agreement | ||
| 114 | CM61M - ICBED | Reorder point planning with external requirements | ||
| 115 | CM61M - KZBED | Indicator for Requirements Grouping | ||
| 116 | CM61M - KZDRB | Indicator: direct procurement/production MRP | ||
| 117 | CM61M - KZREG | Indicator: plan material regularly | ||
| 118 | CM61M - LIFKZ | Automatic Schedule Lines (Scheduling Agreements) | ||
| 119 | CM61M - MARW1 | Target Range of Coverage in Period 01 | ||
| 120 | CM61M - MARW2 | Target Range of Coverage in Period 01 | ||
| 121 | CM61M - MARW3 | Target Range of Coverage in Period 01 | ||
| 122 | CM61M - MENGU | Quantity Updating in Material Master Record | ||
| 123 | CM61M - MFDAT | Set manual firming date: Date to set | ||
| 124 | CM61M - MFHKZ | Planning time fence set manually (MFXDT) | ||
| 125 | CM61M - MFNAM | Set manual firming date: User | ||
| 126 | CM61M - MFXDT | Manual firming date | ||
| 127 | CM61M - MFXKZ | Indicator: MFXDT changed | ||
| 128 | CM61M - MIRW1 | Target Range of Coverage in Period 01 | ||
| 129 | CM61M - MIRW2 | Target Range of Coverage in Period 01 | ||
| 130 | CM61M - MIRW3 | Target Range of Coverage in Period 01 | ||
| 131 | CM61M - NODUM | No requirements for phantom assembly | ||
| 132 | CM61M - OPFDT | Date of firm planned order last copied from MRP | ||
| 133 | CM61M - OPFKZ | Indicator:OPFDT changed | ||
| 134 | CM61M - OSELT | Above selection date | ||
| 135 | CM61M - PLAHZ | Planning horizon | ||
| 136 | CM61M - PLIFZ | Planned delivery time in days | ||
| 137 | CM61M - PLNKZ | Planning Indicator | ||
| 138 | CM61M - PLSEL | Issue Storage Location Selection | ||
| 139 | CM61M - PLTER | End of planning horizon | ||
| 140 | CM61M - PRREG | Checking rule for the availability check | ||
| 141 | CM61M - PSTMP | Last Change to Planned Order: Time Stamp | ||
| 142 | CM61M - RESHZ | Roll forward period for the master plan | ||
| 143 | CM61M - RESPL | Indicator: delete firm planned orders | ||
| 144 | CM61M - RESVP | Period of adjustment for planned independent requirements | ||
| 145 | CM61M - RHDAT | Next planning date for time-phased planning | ||
| 146 | CM61M - RHEND | End of the requirements period for time-phased MRP | ||
| 147 | CM61M - RSTER | End of roll forward period | ||
| 148 | CM61M - RVPKZ | Adjustment of Planned Independent Requirements | ||
| 149 | CM61M - RVPTR | End of adjustment period for planned independent reqmts | ||
| 150 | CM61M - RW1DT | Planning horizon for range of coverage 01 | ||
| 151 | CM61M - RW1TG | Target Range of Coverage in Period 01 | ||
| 152 | CM61M - RW2DT | Planning horizon for range of coverage 02 | ||
| 153 | CM61M - RW2TG | Target Range of Coverage in Period 02 | ||
| 154 | CM61M - RW3TG | Target Range of Coverage in the Rest of the Period | ||
| 155 | CM61M - RWANZ | Number of periods for determining the average | ||
| 156 | CM61M - RWART | Period length type for calculating the average | ||
| 157 | CM61M - RWFLG | Calculate safety stock based on range of coverage | ||
| 158 | CM61M - RWNTG | Number of days per range of coverage period | ||
| 159 | CM61M - RWPER | Period for Calculating the Dynamic Safety Stock | ||
| 160 | CM61M - RYBED | Time-phased planning with requirements (MRP) | ||
| 161 | CM61M - SBDIS | Share of safety stock which can be used for planning | ||
| 162 | CM61M - SCFLG | Indicator: General Subcontracting Logic | ||
| 163 | CM61M - SETYP | Single-Character Flag | ||
| 164 | CM61M - STDPD | Configurable material | ||
| 165 | CM61M - SUMAU | Total sales order requirements | ||
| 166 | CM61M - U1BED | Release for stock transfer order | ||
| 167 | CM61M - U2BED | Delivery schedule for a stock transfer requisition | ||
| 168 | CM61M - U4BED | Delivery schedule for stock transport scheduling agreement | ||
| 169 | CM61M - UMLDB | Indicator for Stock Transfer with MRP Areas | ||
| 170 | CM61M - UMTER | End of rescheduling horizon (date) | ||
| 171 | CM61M - UMTHZ | Rescheduling horizon | ||
| 172 | CM61M - USEQU | Quota arrangement usage | ||
| 173 | CM61M - VERTR | Start date of order proposals allowed in the past | ||
| 174 | CM61M - VINT1 | Consumption period: backward | ||
| 175 | CM61M - VINT2 | Consumption period: forward | ||
| 176 | CM61M - VPLAN | Single-Character Flag | ||
| 177 | CM61M - VPLAV | Single-Character Flag | ||
| 178 | CM61M - VRMOD | Consumption mode | ||
| 179 | CM61M - VTYPE | Planning Variant | ||
| 180 | CM61M - VWVER | Tolerance value for displacement in the future | ||
| 181 | CM61M - VWVOR | Tolerance value for bringing forward receipt elements | ||
| 182 | CM61M - WERTU | Value Updating in Material Master Record | ||
| 183 | CM61M - WZTER | End of replenishment lead time | ||
| 184 | CM61M - XFAT1 | Firm Only Schedule Lines Transmitted to Vendor by Purchasing | ||
| 185 | MDFDI - MFDAT | Set manual firming date: Date to set | ||
| 186 | MDFDI - MFNAM | Set manual firming date: User | ||
| 187 | MDFDI - MFXDT | Manual firming date | ||
| 188 | MDFDI - OPFDT | Date of firm planned order last copied from MRP |