Table/Structure Field list used by SAP ABAP Function Module CO_SE_PRODORD_CHANGE (Change Production Order: Header, Sequences, Operations, Prod. Res./Tools)
SAP ABAP Function Module CO_SE_PRODORD_CHANGE (Change Production Order: Header, Sequences, Operations, Prod. Res./Tools) is using
pages: 1 2 
# Object Type Object Name Object Description Note
     
1 Table/Structure Field  BAPIRET2 - TYPE Message type: S Success, E Error, W Warning, I Info, A Abort
2 Table/Structure Field  BAPI_PP_ORDER_CHANGE - BASIC_END_DATE Basic finish date
3 Table/Structure Field  BAPI_PP_ORDER_CHANGE - BASIC_END_TIME Basic finish (time)
4 Table/Structure Field  BAPI_PP_ORDER_CHANGE - BASIC_START_DATE Basic start date
5 Table/Structure Field  BAPI_PP_ORDER_CHANGE - BASIC_START_TIME Basic start time
6 Table/Structure Field  BAPI_PP_ORDER_CHANGE - BUSINESS_AREA Business Area
7 Table/Structure Field  BAPI_PP_ORDER_CHANGE - EXPLODE_NEW New Input Values
8 Table/Structure Field  BAPI_PP_ORDER_CHANGE - EXPLOSION_DATE Date of BOM Explosion/Routing Transfer
9 Table/Structure Field  BAPI_PP_ORDER_CHANGE - GOODS_RECIPIENT Goods recipient
10 Table/Structure Field  BAPI_PP_ORDER_CHANGE - GR_PROC_TIME Goods receipt processing time in days
11 Table/Structure Field  BAPI_PP_ORDER_CHANGE - MRP_CONTROLLER MRP controller for the order
12 Table/Structure Field  BAPI_PP_ORDER_CHANGE - MRP_DISTR_KEY MRP Distribution Key
13 Table/Structure Field  BAPI_PP_ORDER_CHANGE - ORDER_PRIORITY Order priority
14 Table/Structure Field  BAPI_PP_ORDER_CHANGE - POSITION_NUMBER Order item number
15 Table/Structure Field  BAPI_PP_ORDER_CHANGE - PROD_VERSION Production Version
16 Table/Structure Field  BAPI_PP_ORDER_CHANGE - PROFIT_CENTER Profit Center
17 Table/Structure Field  BAPI_PP_ORDER_CHANGE - QUANTITY Total order quantity
18 Table/Structure Field  BAPI_PP_ORDER_CHANGE - QUANTITY_UOM Common unit of measure for all order items
19 Table/Structure Field  BAPI_PP_ORDER_CHANGE - ROUTING_COUNTER Group Counter
20 Table/Structure Field  BAPI_PP_ORDER_CHANGE - ROUTING_GROUP Key for Task List Group
21 Table/Structure Field  BAPI_PP_ORDER_CHANGE - ROUTING_TYPE Task List Type
22 Table/Structure Field  BAPI_PP_ORDER_CHANGE - SCRAP_QUANTITY Total scrap quantity in the order
23 Table/Structure Field  BAPI_PP_ORDER_CHANGE - SEQUENCE_NUMBER Seq. number order
24 Table/Structure Field  BAPI_PP_ORDER_CHANGE - STOCK_TYPE Stock Type
25 Table/Structure Field  BAPI_PP_ORDER_CHANGE - STORAGE_LOCATION Storage location
26 Table/Structure Field  BAPI_PP_ORDER_CHANGE - UNLOADING_POINT Unloading Point
27 Table/Structure Field  BAPI_PP_ORDER_CHANGEX - BASIC_END_DATE Updated information in related user data field
28 Table/Structure Field  BAPI_PP_ORDER_CHANGEX - BASIC_START_DATE Updated information in related user data field
29 Table/Structure Field  BAPI_PP_ORDER_CHANGEX - BUSINESS_AREA Updated information in related user data field
30 Table/Structure Field  BAPI_PP_ORDER_CHANGEX - EXPLOSION_DATE Updated information in related user data field
31 Table/Structure Field  BAPI_PP_ORDER_CHANGEX - GOODS_RECIPIENT Updated information in related user data field
32 Table/Structure Field  BAPI_PP_ORDER_CHANGEX - GR_PROC_TIME Updated information in related user data field
33 Table/Structure Field  BAPI_PP_ORDER_CHANGEX - MRP_CONTROLLER Updated information in related user data field
34 Table/Structure Field  BAPI_PP_ORDER_CHANGEX - MRP_DISTR_KEY Updated information in related user data field
35 Table/Structure Field  BAPI_PP_ORDER_CHANGEX - ORDER_PRIORITY Updated information in related user data field
36 Table/Structure Field  BAPI_PP_ORDER_CHANGEX - PROD_VERSION Updated information in related user data field
37 Table/Structure Field  BAPI_PP_ORDER_CHANGEX - PROFIT_CENTER Updated information in related user data field
38 Table/Structure Field  BAPI_PP_ORDER_CHANGEX - QUANTITY Updated information in related user data field
39 Table/Structure Field  BAPI_PP_ORDER_CHANGEX - QUANTITY_UOM Updated information in related user data field
40 Table/Structure Field  BAPI_PP_ORDER_CHANGEX - ROUTING Updated information in related user data field
41 Table/Structure Field  BAPI_PP_ORDER_CHANGEX - SCRAP_QUANTITY Updated information in related user data field
42 Table/Structure Field  BAPI_PP_ORDER_CHANGEX - SEQUENCE_NUMBER Updated information in related user data field
43 Table/Structure Field  BAPI_PP_ORDER_CHANGEX - STOCK_TYPE Updated information in related user data field
44 Table/Structure Field  BAPI_PP_ORDER_CHANGEX - STORAGE_LOCATION Updated information in related user data field
45 Table/Structure Field  BAPI_PP_ORDER_CHANGEX - UNLOADING_POINT Updated information in related user data field
46 Table/Structure Field  CAUFVD - AUFNR Order Number
47 Table/Structure Field  CAUFVD - AUTYP Order category
48 Table/Structure Field  CAUFVD - WERKS Plant
49 Table/Structure Field  CAUFVTAB - AUFNR Order Number
50 Table/Structure Field  CAUFVTAB - AUTYP Order category
51 Table/Structure Field  CAUFVTAB - WERKS Plant
52 Table/Structure Field  COSE_S_HEADER - BASIC_END_DATE Basic finish date
53 Table/Structure Field  COSE_S_HEADER - BASIC_END_DATE_X Updated information in related user data field
54 Table/Structure Field  COSE_S_HEADER - BASIC_END_TIME Basic finish (time)
55 Table/Structure Field  COSE_S_HEADER - BASIC_START_DATE Basic start date
56 Table/Structure Field  COSE_S_HEADER - BASIC_START_DATE_X Updated information in related user data field
57 Table/Structure Field  COSE_S_HEADER - BASIC_START_TIME Basic start time
58 Table/Structure Field  COSE_S_HEADER - BUSINESS_AREA Business Area
59 Table/Structure Field  COSE_S_HEADER - BUSINESS_AREA_X Updated information in related user data field
60 Table/Structure Field  COSE_S_HEADER - EXPLODE_NEW New Input Values
61 Table/Structure Field  COSE_S_HEADER - EXPLOSION_DATE Date of BOM Explosion/Routing Transfer
62 Table/Structure Field  COSE_S_HEADER - EXPLOSION_DATE_X Updated information in related user data field
63 Table/Structure Field  COSE_S_HEADER - GOODS_RECIPIENT Goods recipient
64 Table/Structure Field  COSE_S_HEADER - GOODS_RECIPIENT_X Updated information in related user data field
65 Table/Structure Field  COSE_S_HEADER - GR_PROC_TIME Goods receipt processing time in days
66 Table/Structure Field  COSE_S_HEADER - GR_PROC_TIME_X Updated information in related user data field
67 Table/Structure Field  COSE_S_HEADER - MRP_CONTROLLER MRP controller for the order
68 Table/Structure Field  COSE_S_HEADER - MRP_CONTROLLER_X Updated information in related user data field
69 Table/Structure Field  COSE_S_HEADER - MRP_DISTR_KEY MRP Distribution Key
70 Table/Structure Field  COSE_S_HEADER - MRP_DISTR_KEY_X Updated information in related user data field
71 Table/Structure Field  COSE_S_HEADER - ORDER_PRIORITY Order priority
72 Table/Structure Field  COSE_S_HEADER - ORDER_PRIORITY_X Updated information in related user data field
73 Table/Structure Field  COSE_S_HEADER - POSITION_NUMBER Order item number
74 Table/Structure Field  COSE_S_HEADER - PROD_VERSION Production Version
75 Table/Structure Field  COSE_S_HEADER - PROD_VERSION_X Updated information in related user data field
76 Table/Structure Field  COSE_S_HEADER - PROFIT_CENTER Profit Center
77 Table/Structure Field  COSE_S_HEADER - PROFIT_CENTER_X Updated information in related user data field
78 Table/Structure Field  COSE_S_HEADER - QUANTITY Total order quantity
79 Table/Structure Field  COSE_S_HEADER - QUANTITY_UOM Common unit of measure for all order items
80 Table/Structure Field  COSE_S_HEADER - QUANTITY_UOM_X Updated information in related user data field
81 Table/Structure Field  COSE_S_HEADER - QUANTITY_X Updated information in related user data field
82 Table/Structure Field  COSE_S_HEADER - ROUTING_COUNTER Group Counter
83 Table/Structure Field  COSE_S_HEADER - ROUTING_GROUP Key for Task List Group
84 Table/Structure Field  COSE_S_HEADER - ROUTING_TYPE Task List Type
85 Table/Structure Field  COSE_S_HEADER - ROUTING_X Updated information in related user data field
86 Table/Structure Field  COSE_S_HEADER - SCRAP_QUANTITY Total scrap quantity in the order
87 Table/Structure Field  COSE_S_HEADER - SCRAP_QUANTITY_X Updated information in related user data field
88 Table/Structure Field  COSE_S_HEADER - SEQ_NUMBER Seq. number order
89 Table/Structure Field  COSE_S_HEADER - SEQ_NUMBER_X Updated information in related user data field
90 Table/Structure Field  COSE_S_HEADER - STOCK_TYPE Stock Type
91 Table/Structure Field  COSE_S_HEADER - STOCK_TYPE_X Updated information in related user data field
92 Table/Structure Field  COSE_S_HEADER - STORAGE_LOCATION Storage location
93 Table/Structure Field  COSE_S_HEADER - STORAGE_LOCATION_X Updated information in related user data field
94 Table/Structure Field  COSE_S_HEADER - UNLOADING_POINT Unloading Point
95 Table/Structure Field  COSE_S_HEADER - UNLOADING_POINT_X Updated information in related user data field
96 Table/Structure Field  COSE_S_OPERATION - BASE_QUANTITY Base Quantity
97 Table/Structure Field  COSE_S_OPERATION - BASE_QUANTITY_X Updated information in related user data field
98 Table/Structure Field  COSE_S_OPERATION - CONTROL_KEY Control key
99 Table/Structure Field  COSE_S_OPERATION - DEALLOCATE_INDICATOR Indicator: Deallocate Operation
100 Table/Structure Field  COSE_S_OPERATION - DELETION_IND Indicator: Delete Object
101 Table/Structure Field  COSE_S_OPERATION - DISPATCH_INDICATOR Indicator: Dispatch Operation
102 Table/Structure Field  COSE_S_OPERATION - EARLIEST_END_EXEC_DATE Earliest scheduled finish: Execution (date)
103 Table/Structure Field  COSE_S_OPERATION - EARLIEST_END_EXEC_DATE_X Updated information in related user data field
104 Table/Structure Field  COSE_S_OPERATION - EARLIEST_END_EXEC_TIME Earliest scheduled finish: Execution (time)
105 Table/Structure Field  COSE_S_OPERATION - EARLIEST_END_EXEC_TIME_X Updated information in related user data field
106 Table/Structure Field  COSE_S_OPERATION - EARLIEST_END_WAIT_DATE Earliest scheduled finish: Wait (date)
107 Table/Structure Field  COSE_S_OPERATION - EARLIEST_END_WAIT_DATE_X Updated information in related user data field
108 Table/Structure Field  COSE_S_OPERATION - EARLIEST_END_WAIT_TIME Earliest scheduled finish: Wait (time)
109 Table/Structure Field  COSE_S_OPERATION - EARLIEST_END_WAIT_TIME_X Updated information in related user data field
110 Table/Structure Field  COSE_S_OPERATION - EARLIEST_START_EXEC_DATE Earliest scheduled start: Execution (date)
111 Table/Structure Field  COSE_S_OPERATION - EARLIEST_START_EXEC_DATE_X Updated information in related user data field
112 Table/Structure Field  COSE_S_OPERATION - EARLIEST_START_EXEC_TIME Earliest scheduled start: Execution (time)
113 Table/Structure Field  COSE_S_OPERATION - EARLIEST_START_EXEC_TIME_X Updated information in related user data field
114 Table/Structure Field  COSE_S_OPERATION - EARLIEST_START_PROC_DATE Earliest scheduled start: Processing (date)
115 Table/Structure Field  COSE_S_OPERATION - EARLIEST_START_PROC_DATE_X Updated information in related user data field
116 Table/Structure Field  COSE_S_OPERATION - EARLIEST_START_PROC_TIME Earliest scheduled start: Processing (time)
117 Table/Structure Field  COSE_S_OPERATION - EARLIEST_START_PROC_TIME_X Updated information in related user data field
118 Table/Structure Field  COSE_S_OPERATION - EARLIEST_START_TEARDOWN_DATE Earliest scheduled start: Teardown (date)
119 Table/Structure Field  COSE_S_OPERATION - EARLIEST_START_TEARDOWN_DATE_X Updated information in related user data field
120 Table/Structure Field  COSE_S_OPERATION - EARLIEST_START_TEARDOWN_TIME Earliest scheduled start: Teardown (time)
121 Table/Structure Field  COSE_S_OPERATION - EARLIEST_START_TEARDOWN_TIME_X Updated information in related user data field
122 Table/Structure Field  COSE_S_OPERATION - EARLIEST_START_WAIT_DATE Earliest scheduled start: Wait (date)
123 Table/Structure Field  COSE_S_OPERATION - EARLIEST_START_WAIT_DATE_X Updated information in related user data field
124 Table/Structure Field  COSE_S_OPERATION - EARLIEST_START_WAIT_TIME Earliest scheduled start: Wait (time)
125 Table/Structure Field  COSE_S_OPERATION - EARLIEST_START_WAIT_TIME_X Updated information in related user data field
126 Table/Structure Field  COSE_S_OPERATION - LATEST_END_EXEC_DATE Latest scheduled finish: Execution (date)
127 Table/Structure Field  COSE_S_OPERATION - LATEST_END_EXEC_DATE_X Updated information in related user data field
128 Table/Structure Field  COSE_S_OPERATION - LATEST_END_EXEC_TIME Latest scheduled finish: Execution (time)
129 Table/Structure Field  COSE_S_OPERATION - LATEST_END_EXEC_TIME_X Updated information in related user data field
130 Table/Structure Field  COSE_S_OPERATION - LATEST_END_WAIT_DATE Latest scheduled finish: Wait time (date)
131 Table/Structure Field  COSE_S_OPERATION - LATEST_END_WAIT_DATE_X Updated information in related user data field
132 Table/Structure Field  COSE_S_OPERATION - LATEST_END_WAIT_TIME Latest scheduled finish: Wait time
133 Table/Structure Field  COSE_S_OPERATION - LATEST_END_WAIT_TIME_X Updated information in related user data field
134 Table/Structure Field  COSE_S_OPERATION - LATEST_START_EXEC_DATE Latest scheduled start: Execution (date)
135 Table/Structure Field  COSE_S_OPERATION - LATEST_START_EXEC_DATE_X Updated information in related user data field
136 Table/Structure Field  COSE_S_OPERATION - LATEST_START_EXEC_TIME Latest scheduled start: Execution (time)
137 Table/Structure Field  COSE_S_OPERATION - LATEST_START_EXEC_TIME_X Updated information in related user data field
138 Table/Structure Field  COSE_S_OPERATION - LATEST_START_PROC_DATE Latest scheduled start: Processing (date)
139 Table/Structure Field  COSE_S_OPERATION - LATEST_START_PROC_DATE_X Updated information in related user data field
140 Table/Structure Field  COSE_S_OPERATION - LATEST_START_PROC_TIME Latest scheduled start: Processing (time)
141 Table/Structure Field  COSE_S_OPERATION - LATEST_START_PROC_TIME_X Updated information in related user data field
142 Table/Structure Field  COSE_S_OPERATION - LATEST_START_TEARDOWN_DATE Latest scheduled start: Teardown (date)
143 Table/Structure Field  COSE_S_OPERATION - LATEST_START_TEARDOWN_DATE_X Updated information in related user data field
144 Table/Structure Field  COSE_S_OPERATION - LATEST_START_TEARDOWN_TIME Latest scheduled start: Teardown (time)
145 Table/Structure Field  COSE_S_OPERATION - LATEST_START_TEARDOWN_TIME_X Updated information in related user data field
146 Table/Structure Field  COSE_S_OPERATION - LATEST_START_WAIT_DATE Latest scheduled start: Wait time (date)
147 Table/Structure Field  COSE_S_OPERATION - LATEST_START_WAIT_DATE_X Updated information in related user data field
148 Table/Structure Field  COSE_S_OPERATION - LATEST_START_WAIT_TIME Latest scheduled start: Wait time
149 Table/Structure Field  COSE_S_OPERATION - LATEST_START_WAIT_TIME_X Updated information in related user data field
150 Table/Structure Field  COSE_S_OPERATION - MATERIAL_GROUP Material Group
151 Table/Structure Field  COSE_S_OPERATION - MATERIAL_GROUP_X Updated information in related user data field
152 Table/Structure Field  COSE_S_OPERATION - OPERATION Operation/Activity Number
153 Table/Structure Field  COSE_S_OPERATION - OVERLAP_CONT_FLOW Indicator: continuous flow production
154 Table/Structure Field  COSE_S_OPERATION - OVERLAP_CONT_FLOW_X Updated information in related user data field
155 Table/Structure Field  COSE_S_OPERATION - OVERLAP_MIN_TIME Minimum overlap time
156 Table/Structure Field  COSE_S_OPERATION - OVERLAP_MIN_TIME_UNIT Unit for the minimum overlap time
157 Table/Structure Field  COSE_S_OPERATION - OVERLAP_MIN_TIME_UNIT_X Updated information in related user data field
158 Table/Structure Field  COSE_S_OPERATION - OVERLAP_MIN_TIME_X Updated information in related user data field
159 Table/Structure Field  COSE_S_OPERATION - OVERLAP_OPTIONAL Optional overlapping
160 Table/Structure Field  COSE_S_OPERATION - OVERLAP_OPTIONAL_X Updated information in related user data field
161 Table/Structure Field  COSE_S_OPERATION - OVERLAP_REQUIRED Required overlapping
162 Table/Structure Field  COSE_S_OPERATION - OVERLAP_REQUIRED_X Updated information in related user data field
163 Table/Structure Field  COSE_S_OPERATION - PURCHASING_GROUP Purchasing group
164 Table/Structure Field  COSE_S_OPERATION - PURCHASING_GROUP_X Updated information in related user data field
165 Table/Structure Field  COSE_S_OPERATION - SEND_AHEAD_MIN_QUANTITY Minimum Send-Ahead Quantity
166 Table/Structure Field  COSE_S_OPERATION - SEND_AHEAD_MIN_QUANTITY_X Updated information in related user data field
167 Table/Structure Field  COSE_S_OPERATION - SEQUENCE Sequence
168 Table/Structure Field  COSE_S_OPERATION - SEQ_NUMBER Sequence number operation
169 Table/Structure Field  COSE_S_OPERATION - SEQ_NUMBER_X Updated information in related user data field
170 Table/Structure Field  COSE_S_OPERATION - SHORT_TEXT Operation short text
171 Table/Structure Field  COSE_S_OPERATION - SHORT_TEXT_X Updated information in related user data field
172 Table/Structure Field  COSE_S_OPERATION - SPLIT_MAX_NUMBER Maximum number of splits
173 Table/Structure Field  COSE_S_OPERATION - SPLIT_MAX_NUMBER_X Updated information in related user data field
174 Table/Structure Field  COSE_S_OPERATION - SPLIT_MIN_PROC_TIME Minimum processing time
175 Table/Structure Field  COSE_S_OPERATION - SPLIT_MIN_PROC_TIME_UNIT Unit for the minimum processing time
176 Table/Structure Field  COSE_S_OPERATION - SPLIT_MIN_PROC_TIME_UNIT_X Updated information in related user data field
177 Table/Structure Field  COSE_S_OPERATION - SPLIT_MIN_PROC_TIME_X Updated information in related user data field
178 Table/Structure Field  COSE_S_OPERATION - SPLIT_REQUIRED_INDICATOR Required splitting
179 Table/Structure Field  COSE_S_OPERATION - SPLIT_REQUIRED_INDICATOR_X Updated information in related user data field
180 Table/Structure Field  COSE_S_OPERATION - STANDARD_VALUE_01 Standard Value
181 Table/Structure Field  COSE_S_OPERATION - STANDARD_VALUE_01_UNIT Unit of measure for the standard value
182 Table/Structure Field  COSE_S_OPERATION - STANDARD_VALUE_01_UNIT_X Updated information in related user data field
183 Table/Structure Field  COSE_S_OPERATION - STANDARD_VALUE_01_X Updated information in related user data field
184 Table/Structure Field  COSE_S_OPERATION - STANDARD_VALUE_02 Standard Value
185 Table/Structure Field  COSE_S_OPERATION - STANDARD_VALUE_02_UNIT Unit of measure for the standard value
186 Table/Structure Field  COSE_S_OPERATION - STANDARD_VALUE_02_UNIT_X Updated information in related user data field
187 Table/Structure Field  COSE_S_OPERATION - STANDARD_VALUE_02_X Updated information in related user data field
188 Table/Structure Field  COSE_S_OPERATION - STANDARD_VALUE_03 Standard Value
189 Table/Structure Field  COSE_S_OPERATION - STANDARD_VALUE_03_UNIT Unit of measure for the standard value
190 Table/Structure Field  COSE_S_OPERATION - STANDARD_VALUE_03_UNIT_X Updated information in related user data field
191 Table/Structure Field  COSE_S_OPERATION - STANDARD_VALUE_03_X Updated information in related user data field
192 Table/Structure Field  COSE_S_OPERATION - STANDARD_VALUE_04 Standard Value
193 Table/Structure Field  COSE_S_OPERATION - STANDARD_VALUE_04_UNIT Unit of measure for the standard value
194 Table/Structure Field  COSE_S_OPERATION - STANDARD_VALUE_04_UNIT_X Updated information in related user data field
195 Table/Structure Field  COSE_S_OPERATION - STANDARD_VALUE_04_X Updated information in related user data field
196 Table/Structure Field  COSE_S_OPERATION - STANDARD_VALUE_05 Standard Value
197 Table/Structure Field  COSE_S_OPERATION - STANDARD_VALUE_05_UNIT Unit of measure for the standard value
198 Table/Structure Field  COSE_S_OPERATION - STANDARD_VALUE_05_UNIT_X Updated information in related user data field
199 Table/Structure Field  COSE_S_OPERATION - STANDARD_VALUE_05_X Updated information in related user data field
200 Table/Structure Field  COSE_S_OPERATION - STANDARD_VALUE_06 Standard Value
201 Table/Structure Field  COSE_S_OPERATION - STANDARD_VALUE_06_UNIT Unit of measure for the standard value
202 Table/Structure Field  COSE_S_OPERATION - STANDARD_VALUE_06_UNIT_X Updated information in related user data field
203 Table/Structure Field  COSE_S_OPERATION - STANDARD_VALUE_06_X Updated information in related user data field
204 Table/Structure Field  COSE_S_OPERATION - SUB_OPERATION Suboperation
205 Table/Structure Field  COSE_S_OPERATION - USER_DEFINED_KEY Key word ID for user-defined fields
206 Table/Structure Field  COSE_S_OPERATION - USER_DEFINED_KEY_X Updated information in related user data field
207 Table/Structure Field  COSE_S_OPERATION - USER_FIELD_00_CHARACTER User field with 20 characters
208 Table/Structure Field  COSE_S_OPERATION - USER_FIELD_00_CHARACTER_X Updated information in related user data field
209 Table/Structure Field  COSE_S_OPERATION - USER_FIELD_01_CHARACTER User field with 20 characters
210 Table/Structure Field  COSE_S_OPERATION - USER_FIELD_01_CHARACTER_X Updated information in related user data field
211 Table/Structure Field  COSE_S_OPERATION - USER_FIELD_02_CHARACTER User field with 10 characters
212 Table/Structure Field  COSE_S_OPERATION - USER_FIELD_02_CHARACTER_X Updated information in related user data field
213 Table/Structure Field  COSE_S_OPERATION - USER_FIELD_03_CHARACTER User field with 10 characters
214 Table/Structure Field  COSE_S_OPERATION - USER_FIELD_03_CHARACTER_X Updated information in related user data field
215 Table/Structure Field  COSE_S_OPERATION - USER_FIELD_04_QUANTITY User field for quantity (length 10.3)
216 Table/Structure Field  COSE_S_OPERATION - USER_FIELD_04_QUANTITY_X Updated information in related user data field
217 Table/Structure Field  COSE_S_OPERATION - USER_FIELD_04_UNIT User field: Unit for quantity fields
218 Table/Structure Field  COSE_S_OPERATION - USER_FIELD_04_UNIT_X Updated information in related user data field
219 Table/Structure Field  COSE_S_OPERATION - USER_FIELD_05_QUANTITY User field for quantity (length 10.3)
220 Table/Structure Field  COSE_S_OPERATION - USER_FIELD_05_QUANTITY_X Updated information in related user data field
221 Table/Structure Field  COSE_S_OPERATION - USER_FIELD_05_UNIT User field: Unit for quantity fields
222 Table/Structure Field  COSE_S_OPERATION - USER_FIELD_05_UNIT_X Updated information in related user data field
223 Table/Structure Field  COSE_S_OPERATION - USER_FIELD_06_QUANTITY User-defined field for values (length 10,3)
224 Table/Structure Field  COSE_S_OPERATION - USER_FIELD_06_QUANTITY_X Updated information in related user data field
225 Table/Structure Field  COSE_S_OPERATION - USER_FIELD_06_UNIT User field: Unit for value fields
226 Table/Structure Field  COSE_S_OPERATION - USER_FIELD_06_UNIT_X Updated information in related user data field
227 Table/Structure Field  COSE_S_OPERATION - USER_FIELD_07_QUANTITY User-defined field for values (length 10,3)
228 Table/Structure Field  COSE_S_OPERATION - USER_FIELD_07_QUANTITY_X Updated information in related user data field
229 Table/Structure Field  COSE_S_OPERATION - USER_FIELD_07_UNIT User field: Unit for value fields
230 Table/Structure Field  COSE_S_OPERATION - USER_FIELD_07_UNIT_X Updated information in related user data field
231 Table/Structure Field  COSE_S_OPERATION - USER_FIELD_08_DATE User field for date
232 Table/Structure Field  COSE_S_OPERATION - USER_FIELD_08_DATE_X Updated information in related user data field
233 Table/Structure Field  COSE_S_OPERATION - USER_FIELD_09_DATE User field for date
234 Table/Structure Field  COSE_S_OPERATION - USER_FIELD_09_DATE_X Updated information in related user data field
235 Table/Structure Field  COSE_S_OPERATION - USER_FIELD_10_INDICATOR User-defined field: Indicator for reports
236 Table/Structure Field  COSE_S_OPERATION - USER_FIELD_10_INDICATOR_X Updated information in related user data field
237 Table/Structure Field  COSE_S_OPERATION - USER_FIELD_11_INDICATOR User-defined field: Indicator for reports
238 Table/Structure Field  COSE_S_OPERATION - USER_FILED_11_INDICATOR_X Updated information in related user data field
239 Table/Structure Field  COSE_S_OPERATION - WORK_CENTER Work center
240 Table/Structure Field  COSE_S_OPERATION - WORK_CENTER_X Updated information in related user data field
241 Table/Structure Field  COSE_S_OPR_CHANGE - ARBPL Work center
242 Table/Structure Field  COSE_S_OPR_CHANGE - ARBPL_X Updated information in related user data field
243 Table/Structure Field  COSE_S_OPR_CHANGE - BMSCH Base Quantity
244 Table/Structure Field  COSE_S_OPR_CHANGE - BMSCH_X Updated information in related user data field
245 Table/Structure Field  COSE_S_OPR_CHANGE - CY_SEQNRV Sequence number operation
246 Table/Structure Field  COSE_S_OPR_CHANGE - CY_SEQNRV_X Updated information in related user data field
247 Table/Structure Field  COSE_S_OPR_CHANGE - DEALLOCATE_OPR Indicator: Deallocate Operation
248 Table/Structure Field  COSE_S_OPR_CHANGE - DISPATCH_OPR Indicator: Dispatch Operation
249 Table/Structure Field  COSE_S_OPR_CHANGE - EKGRP Purchasing group
250 Table/Structure Field  COSE_S_OPR_CHANGE - EKGRP_X Updated information in related user data field
251 Table/Structure Field  COSE_S_OPR_CHANGE - FLIES Indicator: continuous flow production
252 Table/Structure Field  COSE_S_OPR_CHANGE - FLIES_X Updated information in related user data field
253 Table/Structure Field  COSE_S_OPR_CHANGE - FSAVD Earliest scheduled start: Execution (date)
254 Table/Structure Field  COSE_S_OPR_CHANGE - FSAVD_X Updated information in related user data field
255 Table/Structure Field  COSE_S_OPR_CHANGE - FSAVZ Earliest scheduled start: Execution (time)
256 Table/Structure Field  COSE_S_OPR_CHANGE - FSAVZ_X Updated information in related user data field
257 Table/Structure Field  COSE_S_OPR_CHANGE - FSEDD Earliest scheduled finish: Execution (date)
258 Table/Structure Field  COSE_S_OPR_CHANGE - FSEDD_X Updated information in related user data field
259 Table/Structure Field  COSE_S_OPR_CHANGE - FSEDZ Earliest scheduled finish: Execution (time)
260 Table/Structure Field  COSE_S_OPR_CHANGE - FSEDZ_X Updated information in related user data field
261 Table/Structure Field  COSE_S_OPR_CHANGE - FSELD Earliest scheduled finish: Wait (date)
262 Table/Structure Field  COSE_S_OPR_CHANGE - FSELD_X Updated information in related user data field
263 Table/Structure Field  COSE_S_OPR_CHANGE - FSELZ Earliest scheduled finish: Wait (time)
264 Table/Structure Field  COSE_S_OPR_CHANGE - FSELZ_X Updated information in related user data field
265 Table/Structure Field  COSE_S_OPR_CHANGE - FSSAD Earliest scheduled start: Teardown (date)
266 Table/Structure Field  COSE_S_OPR_CHANGE - FSSAD_X Updated information in related user data field
267 Table/Structure Field  COSE_S_OPR_CHANGE - FSSAZ Earliest scheduled start: Teardown (time)
268 Table/Structure Field  COSE_S_OPR_CHANGE - FSSAZ_X Updated information in related user data field
269 Table/Structure Field  COSE_S_OPR_CHANGE - FSSBD Earliest scheduled start: Processing (date)
270 Table/Structure Field  COSE_S_OPR_CHANGE - FSSBD_X Updated information in related user data field
271 Table/Structure Field  COSE_S_OPR_CHANGE - FSSBZ Earliest scheduled start: Processing (time)
272 Table/Structure Field  COSE_S_OPR_CHANGE - FSSBZ_X Updated information in related user data field
273 Table/Structure Field  COSE_S_OPR_CHANGE - FSSLD Earliest scheduled start: Wait (date)
274 Table/Structure Field  COSE_S_OPR_CHANGE - FSSLD_X Updated information in related user data field
275 Table/Structure Field  COSE_S_OPR_CHANGE - FSSLZ Earliest scheduled start: Wait (time)
276 Table/Structure Field  COSE_S_OPR_CHANGE - FSSLZ_X Updated information in related user data field
277 Table/Structure Field  COSE_S_OPR_CHANGE - LTXA1 Operation short text
278 Table/Structure Field  COSE_S_OPR_CHANGE - LTXA1_X Updated information in related user data field
279 Table/Structure Field  COSE_S_OPR_CHANGE - MATKL Material Group
280 Table/Structure Field  COSE_S_OPR_CHANGE - MATKL_X Updated information in related user data field
281 Table/Structure Field  COSE_S_OPR_CHANGE - MINWE Minimum Send-Ahead Quantity
282 Table/Structure Field  COSE_S_OPR_CHANGE - MINWE_X Updated information in related user data field
283 Table/Structure Field  COSE_S_OPR_CHANGE - PLNFL Sequence
284 Table/Structure Field  COSE_S_OPR_CHANGE - SLWID Key word ID for user-defined fields
285 Table/Structure Field  COSE_S_OPR_CHANGE - SLWID_X Updated information in related user data field
286 Table/Structure Field  COSE_S_OPR_CHANGE - SPLIM Maximum number of splits
287 Table/Structure Field  COSE_S_OPR_CHANGE - SPLIM_X Updated information in related user data field
288 Table/Structure Field  COSE_S_OPR_CHANGE - SPMUS Required splitting
289 Table/Structure Field  COSE_S_OPR_CHANGE - SPMUS_X Updated information in related user data field
290 Table/Structure Field  COSE_S_OPR_CHANGE - SSAVD Latest scheduled start: Execution (date)
291 Table/Structure Field  COSE_S_OPR_CHANGE - SSAVD_X Updated information in related user data field
292 Table/Structure Field  COSE_S_OPR_CHANGE - SSAVZ Latest scheduled start: Execution (time)
293 Table/Structure Field  COSE_S_OPR_CHANGE - SSAVZ_X Updated information in related user data field
294 Table/Structure Field  COSE_S_OPR_CHANGE - SSEDD Latest scheduled finish: Execution (date)
295 Table/Structure Field  COSE_S_OPR_CHANGE - SSEDD_X Updated information in related user data field
296 Table/Structure Field  COSE_S_OPR_CHANGE - SSEDZ Latest scheduled finish: Execution (time)
297 Table/Structure Field  COSE_S_OPR_CHANGE - SSEDZ_X Updated information in related user data field
298 Table/Structure Field  COSE_S_OPR_CHANGE - SSELD Latest scheduled finish: Wait time (date)
299 Table/Structure Field  COSE_S_OPR_CHANGE - SSELD_X Updated information in related user data field
300 Table/Structure Field  COSE_S_OPR_CHANGE - SSELZ Latest scheduled finish: Wait time
301 Table/Structure Field  COSE_S_OPR_CHANGE - SSELZ_X Updated information in related user data field
302 Table/Structure Field  COSE_S_OPR_CHANGE - SSSAD Latest scheduled start: Teardown (date)
303 Table/Structure Field  COSE_S_OPR_CHANGE - SSSAD_X Updated information in related user data field
304 Table/Structure Field  COSE_S_OPR_CHANGE - SSSAZ Latest scheduled start: Teardown (time)
305 Table/Structure Field  COSE_S_OPR_CHANGE - SSSAZ_X Updated information in related user data field
306 Table/Structure Field  COSE_S_OPR_CHANGE - SSSBD Latest scheduled start: Processing (date)
307 Table/Structure Field  COSE_S_OPR_CHANGE - SSSBD_X Updated information in related user data field
308 Table/Structure Field  COSE_S_OPR_CHANGE - SSSBZ Latest scheduled start: Processing (time)
309 Table/Structure Field  COSE_S_OPR_CHANGE - SSSBZ_X Updated information in related user data field
310 Table/Structure Field  COSE_S_OPR_CHANGE - SSSLD Latest scheduled start: Wait time (date)
311 Table/Structure Field  COSE_S_OPR_CHANGE - SSSLD_X Updated information in related user data field
312 Table/Structure Field  COSE_S_OPR_CHANGE - SSSLZ Latest scheduled start: Wait time
313 Table/Structure Field  COSE_S_OPR_CHANGE - SSSLZ_X Updated information in related user data field
314 Table/Structure Field  COSE_S_OPR_CHANGE - UEKAN Optional overlapping
315 Table/Structure Field  COSE_S_OPR_CHANGE - UEKAN_X Updated information in related user data field
316 Table/Structure Field  COSE_S_OPR_CHANGE - UEMUS Required overlapping
317 Table/Structure Field  COSE_S_OPR_CHANGE - UEMUS_X Updated information in related user data field
318 Table/Structure Field  COSE_S_OPR_CHANGE - USE04 User field: Unit for quantity fields
319 Table/Structure Field  COSE_S_OPR_CHANGE - USE04_X Updated information in related user data field
320 Table/Structure Field  COSE_S_OPR_CHANGE - USE05 User field: Unit for quantity fields
321 Table/Structure Field  COSE_S_OPR_CHANGE - USE05_X Updated information in related user data field
322 Table/Structure Field  COSE_S_OPR_CHANGE - USE06 User field: Unit for value fields
323 Table/Structure Field  COSE_S_OPR_CHANGE - USE06_X Updated information in related user data field
324 Table/Structure Field  COSE_S_OPR_CHANGE - USE07 User field: Unit for value fields
325 Table/Structure Field  COSE_S_OPR_CHANGE - USE07_X Updated information in related user data field
326 Table/Structure Field  COSE_S_OPR_CHANGE - USR00 User field with 20 characters
327 Table/Structure Field  COSE_S_OPR_CHANGE - USR00_X Updated information in related user data field
328 Table/Structure Field  COSE_S_OPR_CHANGE - USR01 User field with 20 characters
329 Table/Structure Field  COSE_S_OPR_CHANGE - USR01_X Updated information in related user data field
330 Table/Structure Field  COSE_S_OPR_CHANGE - USR02 User field with 10 characters
331 Table/Structure Field  COSE_S_OPR_CHANGE - USR02_X Updated information in related user data field
332 Table/Structure Field  COSE_S_OPR_CHANGE - USR03 User field with 10 characters
333 Table/Structure Field  COSE_S_OPR_CHANGE - USR03_X Updated information in related user data field
334 Table/Structure Field  COSE_S_OPR_CHANGE - USR04 User field for quantity (length 10.3)
335 Table/Structure Field  COSE_S_OPR_CHANGE - USR04_X Updated information in related user data field
336 Table/Structure Field  COSE_S_OPR_CHANGE - USR05 User field for quantity (length 10.3)
337 Table/Structure Field  COSE_S_OPR_CHANGE - USR05_X Updated information in related user data field
338 Table/Structure Field  COSE_S_OPR_CHANGE - USR06 User-defined field for values (length 10,3)
339 Table/Structure Field  COSE_S_OPR_CHANGE - USR06_X Updated information in related user data field
340 Table/Structure Field  COSE_S_OPR_CHANGE - USR07 User-defined field for values (length 10,3)
341 Table/Structure Field  COSE_S_OPR_CHANGE - USR07_X Updated information in related user data field
342 Table/Structure Field  COSE_S_OPR_CHANGE - USR08 User field for date
343 Table/Structure Field  COSE_S_OPR_CHANGE - USR08_X Updated information in related user data field
344 Table/Structure Field  COSE_S_OPR_CHANGE - USR09 User field for date
345 Table/Structure Field  COSE_S_OPR_CHANGE - USR09_X Updated information in related user data field
346 Table/Structure Field  COSE_S_OPR_CHANGE - USR10 User-defined field: Indicator for reports
347 Table/Structure Field  COSE_S_OPR_CHANGE - USR10_X Updated information in related user data field
348 Table/Structure Field  COSE_S_OPR_CHANGE - USR11 User-defined field: Indicator for reports
349 Table/Structure Field  COSE_S_OPR_CHANGE - USR11_X Updated information in related user data field
350 Table/Structure Field  COSE_S_OPR_CHANGE - UVORN Suboperation
351 Table/Structure Field  COSE_S_OPR_CHANGE - VGE01 Unit of measure for the standard value
352 Table/Structure Field  COSE_S_OPR_CHANGE - VGE01_X Updated information in related user data field
353 Table/Structure Field  COSE_S_OPR_CHANGE - VGE02 Unit of measure for the standard value
354 Table/Structure Field  COSE_S_OPR_CHANGE - VGE02_X Updated information in related user data field
355 Table/Structure Field  COSE_S_OPR_CHANGE - VGE03 Unit of measure for the standard value
356 Table/Structure Field  COSE_S_OPR_CHANGE - VGE03_X Updated information in related user data field
357 Table/Structure Field  COSE_S_OPR_CHANGE - VGE04 Unit of measure for the standard value
358 Table/Structure Field  COSE_S_OPR_CHANGE - VGE04_X Updated information in related user data field
359 Table/Structure Field  COSE_S_OPR_CHANGE - VGE05 Unit of measure for the standard value
360 Table/Structure Field  COSE_S_OPR_CHANGE - VGE05_X Updated information in related user data field
361 Table/Structure Field  COSE_S_OPR_CHANGE - VGE06 Unit of measure for the standard value
362 Table/Structure Field  COSE_S_OPR_CHANGE - VGE06_X Updated information in related user data field
363 Table/Structure Field  COSE_S_OPR_CHANGE - VGW01 Standard Value
364 Table/Structure Field  COSE_S_OPR_CHANGE - VGW01_X Updated information in related user data field
365 Table/Structure Field  COSE_S_OPR_CHANGE - VGW02 Standard Value
366 Table/Structure Field  COSE_S_OPR_CHANGE - VGW02_X Updated information in related user data field
367 Table/Structure Field  COSE_S_OPR_CHANGE - VGW03 Standard Value
368 Table/Structure Field  COSE_S_OPR_CHANGE - VGW03_X Updated information in related user data field
369 Table/Structure Field  COSE_S_OPR_CHANGE - VGW04 Standard Value
370 Table/Structure Field  COSE_S_OPR_CHANGE - VGW04_X Updated information in related user data field
371 Table/Structure Field  COSE_S_OPR_CHANGE - VGW05 Standard Value
372 Table/Structure Field  COSE_S_OPR_CHANGE - VGW05_X Updated information in related user data field
373 Table/Structure Field  COSE_S_OPR_CHANGE - VGW06 Standard Value
374 Table/Structure Field  COSE_S_OPR_CHANGE - VGW06_X Updated information in related user data field
375 Table/Structure Field  COSE_S_OPR_CHANGE - VORNR Operation/Activity Number
376 Table/Structure Field  COSE_S_OPR_CHANGE - ZEIMB Unit for the minimum processing time
377 Table/Structure Field  COSE_S_OPR_CHANGE - ZEIMB_X Updated information in related user data field
378 Table/Structure Field  COSE_S_OPR_CHANGE - ZEIMU Unit for the minimum overlap time
379 Table/Structure Field  COSE_S_OPR_CHANGE - ZEIMU_X Updated information in related user data field
380 Table/Structure Field  COSE_S_OPR_CHANGE - ZMINB Minimum processing time
381 Table/Structure Field  COSE_S_OPR_CHANGE - ZMINB_X Updated information in related user data field
382 Table/Structure Field  COSE_S_OPR_CHANGE - ZMINU Minimum overlap time
383 Table/Structure Field  COSE_S_OPR_CHANGE - ZMINU_X Updated information in related user data field
384 Table/Structure Field  COSE_S_OPR_CREATE - ARBPL Work center
385 Table/Structure Field  COSE_S_OPR_CREATE - BMSCH Base Quantity
386 Table/Structure Field  COSE_S_OPR_CREATE - CY_SEQNRV Sequence number operation
387 Table/Structure Field  COSE_S_OPR_CREATE - DISPATCH_OPR Indicator: Dispatch Operation
388 Table/Structure Field  COSE_S_OPR_CREATE - EKGRP Purchasing group
389 Table/Structure Field  COSE_S_OPR_CREATE - FLIES Indicator: continuous flow production
390 Table/Structure Field  COSE_S_OPR_CREATE - FSAVD Earliest scheduled start: Execution (date)
391 Table/Structure Field  COSE_S_OPR_CREATE - FSAVZ Earliest scheduled start: Execution (time)
392 Table/Structure Field  COSE_S_OPR_CREATE - FSEDD Earliest scheduled finish: Execution (date)
393 Table/Structure Field  COSE_S_OPR_CREATE - FSEDZ Earliest scheduled finish: Execution (time)
394 Table/Structure Field  COSE_S_OPR_CREATE - FSELD Earliest scheduled finish: Wait (date)
395 Table/Structure Field  COSE_S_OPR_CREATE - FSELZ Earliest scheduled finish: Wait (time)
396 Table/Structure Field  COSE_S_OPR_CREATE - FSSAD Earliest scheduled start: Teardown (date)
397 Table/Structure Field  COSE_S_OPR_CREATE - FSSAZ Earliest scheduled start: Teardown (time)
398 Table/Structure Field  COSE_S_OPR_CREATE - FSSBD Earliest scheduled start: Processing (date)
399 Table/Structure Field  COSE_S_OPR_CREATE - FSSBZ Earliest scheduled start: Processing (time)
400 Table/Structure Field  COSE_S_OPR_CREATE - FSSLD Earliest scheduled start: Wait (date)
401 Table/Structure Field  COSE_S_OPR_CREATE - FSSLZ Earliest scheduled start: Wait (time)
402 Table/Structure Field  COSE_S_OPR_CREATE - LTXA1 Operation short text
403 Table/Structure Field  COSE_S_OPR_CREATE - MATKL Material Group
404 Table/Structure Field  COSE_S_OPR_CREATE - MINWE Minimum Send-Ahead Quantity
405 Table/Structure Field  COSE_S_OPR_CREATE - PLNFL Sequence
406 Table/Structure Field  COSE_S_OPR_CREATE - SLWID Key word ID for user-defined fields
407 Table/Structure Field  COSE_S_OPR_CREATE - SPLIM Maximum number of splits
408 Table/Structure Field  COSE_S_OPR_CREATE - SPMUS Required splitting
409 Table/Structure Field  COSE_S_OPR_CREATE - SSAVD Latest scheduled start: Execution (date)
410 Table/Structure Field  COSE_S_OPR_CREATE - SSAVZ Latest scheduled start: Execution (time)
411 Table/Structure Field  COSE_S_OPR_CREATE - SSEDD Latest scheduled finish: Execution (date)
412 Table/Structure Field  COSE_S_OPR_CREATE - SSEDZ Latest scheduled finish: Execution (time)
413 Table/Structure Field  COSE_S_OPR_CREATE - SSELD Latest scheduled finish: Wait time (date)
414 Table/Structure Field  COSE_S_OPR_CREATE - SSELZ Latest scheduled finish: Wait time
415 Table/Structure Field  COSE_S_OPR_CREATE - SSSAD Latest scheduled start: Teardown (date)
416 Table/Structure Field  COSE_S_OPR_CREATE - SSSAZ Latest scheduled start: Teardown (time)
417 Table/Structure Field  COSE_S_OPR_CREATE - SSSBD Latest scheduled start: Processing (date)
418 Table/Structure Field  COSE_S_OPR_CREATE - SSSBZ Latest scheduled start: Processing (time)
419 Table/Structure Field  COSE_S_OPR_CREATE - SSSLD Latest scheduled start: Wait time (date)
420 Table/Structure Field  COSE_S_OPR_CREATE - SSSLZ Latest scheduled start: Wait time
421 Table/Structure Field  COSE_S_OPR_CREATE - STEUS Control key
422 Table/Structure Field  COSE_S_OPR_CREATE - UEKAN Optional overlapping
423 Table/Structure Field  COSE_S_OPR_CREATE - UEMUS Required overlapping
424 Table/Structure Field  COSE_S_OPR_CREATE - USE04 User field: Unit for quantity fields
425 Table/Structure Field  COSE_S_OPR_CREATE - USE05 User field: Unit for quantity fields
426 Table/Structure Field  COSE_S_OPR_CREATE - USE06 User field: Unit for value fields
427 Table/Structure Field  COSE_S_OPR_CREATE - USE07 User field: Unit for value fields
428 Table/Structure Field  COSE_S_OPR_CREATE - USR00 User field with 20 characters
429 Table/Structure Field  COSE_S_OPR_CREATE - USR01 User field with 20 characters
430 Table/Structure Field  COSE_S_OPR_CREATE - USR02 User field with 10 characters
431 Table/Structure Field  COSE_S_OPR_CREATE - USR03 User field with 10 characters
432 Table/Structure Field  COSE_S_OPR_CREATE - USR04 User field for quantity (length 10.3)
433 Table/Structure Field  COSE_S_OPR_CREATE - USR05 User field for quantity (length 10.3)
434 Table/Structure Field  COSE_S_OPR_CREATE - USR06 User-defined field for values (length 10,3)
435 Table/Structure Field  COSE_S_OPR_CREATE - USR07 User-defined field for values (length 10,3)
436 Table/Structure Field  COSE_S_OPR_CREATE - USR08 User field for date
437 Table/Structure Field  COSE_S_OPR_CREATE - USR09 User field for date
438 Table/Structure Field  COSE_S_OPR_CREATE - USR10 User-defined field: Indicator for reports
439 Table/Structure Field  COSE_S_OPR_CREATE - USR11 User-defined field: Indicator for reports
440 Table/Structure Field  COSE_S_OPR_CREATE - UVORN Suboperation
441 Table/Structure Field  COSE_S_OPR_CREATE - VGE01 Unit of measure for the standard value
442 Table/Structure Field  COSE_S_OPR_CREATE - VGE02 Unit of measure for the standard value
443 Table/Structure Field  COSE_S_OPR_CREATE - VGE03 Unit of measure for the standard value
444 Table/Structure Field  COSE_S_OPR_CREATE - VGE04 Unit of measure for the standard value
445 Table/Structure Field  COSE_S_OPR_CREATE - VGE05 Unit of measure for the standard value
446 Table/Structure Field  COSE_S_OPR_CREATE - VGE06 Unit of measure for the standard value
447 Table/Structure Field  COSE_S_OPR_CREATE - VGW01 Standard Value
448 Table/Structure Field  COSE_S_OPR_CREATE - VGW02 Standard Value
449 Table/Structure Field  COSE_S_OPR_CREATE - VGW03 Standard Value
450 Table/Structure Field  COSE_S_OPR_CREATE - VGW04 Standard Value
451 Table/Structure Field  COSE_S_OPR_CREATE - VGW05 Standard Value
452 Table/Structure Field  COSE_S_OPR_CREATE - VGW06 Standard Value
453 Table/Structure Field  COSE_S_OPR_CREATE - VORNR Operation/Activity Number
454 Table/Structure Field  COSE_S_OPR_CREATE - ZEIMB Unit for the minimum processing time
455 Table/Structure Field  COSE_S_OPR_CREATE - ZEIMU Unit for the minimum overlap time
456 Table/Structure Field  COSE_S_OPR_CREATE - ZMINB Minimum processing time
457 Table/Structure Field  COSE_S_OPR_CREATE - ZMINU Minimum overlap time
458 Table/Structure Field  COSE_S_OPR_DELETE - PLNFL Sequence
459 Table/Structure Field  COSE_S_OPR_DELETE - UVORN Suboperation
460 Table/Structure Field  COSE_S_OPR_DELETE - VORNR Operation/Activity Number
461 Table/Structure Field  COSE_S_OPR_USER_STAT - PLNFL Sequence
462 Table/Structure Field  COSE_S_OPR_USER_STAT - UVORN Suboperation
463 Table/Structure Field  COSE_S_OPR_USER_STAT - VORNR Operation/Activity Number
464 Table/Structure Field  COSE_S_PRT - DELETION_IND Indicator: Delete Object
465 Table/Structure Field  COSE_S_PRT - DOCUMENT_NO Document number
466 Table/Structure Field  COSE_S_PRT - DOCUMENT_PART Document part
467 Table/Structure Field  COSE_S_PRT - DOCUMENT_TYPE Document Type
468 Table/Structure Field  COSE_S_PRT - DOCUMENT_VERSION Document version
469 Table/Structure Field  COSE_S_PRT - END_OFFSET Offset to finish of production resource/tool usage
470 Table/Structure Field  COSE_S_PRT - END_OFFSET_UOM Offset unit for end of production resource/tool usage
471 Table/Structure Field  COSE_S_PRT - END_OFFSET_UOM_X Updated information in related user data field
472 Table/Structure Field  COSE_S_PRT - END_OFFSET_X Updated information in related user data field
473 Table/Structure Field  COSE_S_PRT - END_REF_DATE Reference date for end of production resource/tool usage
474 Table/Structure Field  COSE_S_PRT - END_REF_DATE_X Updated information in related user data field
475 Table/Structure Field  COSE_S_PRT - EQUIPMENT Equipment Number
476 Table/Structure Field  COSE_S_PRT - MATERIAL Material Number
477 Table/Structure Field  COSE_S_PRT - MISC_PRT Production resources and tools
478 Table/Structure Field  COSE_S_PRT - OPERATION Operation/Activity Number
479 Table/Structure Field  COSE_S_PRT - PLANT Production resources/tools in plant
480 Table/Structure Field  COSE_S_PRT - PRT_CATEGORY Production resources/tools category
481 Table/Structure Field  COSE_S_PRT - PRT_ITEM_NO Item Number for Production Resource/Tool
482 Table/Structure Field  COSE_S_PRT - QUANTITY Standard value for the PRT quantity
483 Table/Structure Field  COSE_S_PRT - QUANTITY_FORMULA Formula for calculating the total quantity of PRT
484 Table/Structure Field  COSE_S_PRT - QUANTITY_FORMULA_X Updated information in related user data field
485 Table/Structure Field  COSE_S_PRT - QUANTITY_UOM Quantity unit of production resource/tool
486 Table/Structure Field  COSE_S_PRT - QUANTITY_UOM_X Updated information in related user data field
487 Table/Structure Field  COSE_S_PRT - QUANTITY_X Updated information in related user data field
488 Table/Structure Field  COSE_S_PRT - SEQUENCE Sequence
489 Table/Structure Field  COSE_S_PRT - START_OFFSET Offset to start of production resource/tool usage
490 Table/Structure Field  COSE_S_PRT - START_OFFSET_UOM Offset unit for start of prod. resource/tool usage
491 Table/Structure Field  COSE_S_PRT - START_OFFSET_UOM_X Updated information in related user data field
492 Table/Structure Field  COSE_S_PRT - START_OFFSET_X Updated information in related user data field
493 Table/Structure Field  COSE_S_PRT - START_REF_DATE Reference date to start of production resource/tool usage
494 Table/Structure Field  COSE_S_PRT - START_REF_DATE_X Updated information in related user data field
495 Table/Structure Field  COSE_S_PRT - STEUF Control key for management of production resources/tools
496 Table/Structure Field  COSE_S_PRT - TEXT First line of text for production resources/tools
497 Table/Structure Field  COSE_S_PRT - TEXT_X Updated information in related user data field
498 Table/Structure Field  COSE_S_PRT - USAGE_VALUE Standard usage value for production resources/tools
499 Table/Structure Field  COSE_S_PRT - USAGE_VALUE_FORMULA Formula for calculating the total usage value of PRT
500 Table/Structure Field  COSE_S_PRT - USAGE_VALUE_FORMULA_X Updated information in related user data field