SAP ABAP Table Field BAPI_PP_ORDER_CHANGE-ORDER_PRIORITY (Order priority)
Hierarchy
☛ SAP_APPL (Software Component) Logistics and Accounting
   ⤷ PP-SFC (Application Component) Production Orders
     ⤷ COBAPI (Package) BAPIs for Production and Process Orders
Basic Data
Table BAPI_PP_ORDER_CHANGE     Transfer Structure for Changing Production Orders
Field ORDER_PRIORITY     Order priority
Position 13    
Field Attributes
Key    
Mandatory    
Data Element CO_APRIO     Order priority
Check Table      
Nesting depth for includes 0    
Internal ABAP Type C     Character String
Internal Length in Bytes 1    
Reference table      
Name of Include      
Reference Field (CURR or QTY)      
Check module    
NOT NULL forced       Any NULL or NOT NULL
Data Type in ABAP Dictionary CHAR     Character String
Length (No. of Characters) 1    
Number of Decimal Places 0    
Domain name CHAR1     One-Character Field Without Check
Origin of an input help (F4)       No input help exists
DD: Flag if it is a table       No / FALSE
DD: Depth for structured types 0    
DD: Component Type E     Data element
Type of Object Referenced       No Information
DD: Indicator for a Language Field       Not selected as language field
Position of the field in the table 0    
History
Last changed by/on SAP  20110901 
SAP Release Created in 500