Message Number list used by SAP ABAP Class /MRSS/CL_SGE_SINGLE_RESOURCE (Scheduling Engine: Single Resource)
SAP ABAP Class
/MRSS/CL_SGE_SINGLE_RESOURCE (Scheduling Engine: Single Resource) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | /MRSS/OPT - 020 | Could not calculate distance | ||
| 2 | /MRSS/SGE - 204 | Time allocation &1 was changed by user &2 | ||
| 3 | /MRSS/SGE - 901 | Links are not allowed for external resources | ||
| 4 | /MRSS/SGE - 649 | No valid time interval found for resource &1 | ||
| 5 | /MRSS/SGE - 634 | Resource &1 was skipped for demand &1; capacity information is missing | ||
| 6 | /MRSS/SGE - 633 | Demand & was skipped; default asg. type is not concrete or stretched | ||
| 7 | /MRSS/SGE - 630 | Demand &1: slots for assignments found for resource &2 | ||
| 8 | /MRSS/SGE - 628 | No capacity information found for resource &1 | ||
| 9 | /MRSS/SGE - 627 | Demand &1 was skipped; technical object is blocked | ||
| 10 | /MRSS/SGE - 439 | Breaks cannot be moved beyond the permitted intervals &1 - &2 | ||
| 11 | /MRSS/SGE - 366 | Enter a daily work schedule | ||
| 12 | /MRSS/SGE - 347 | Team &1 cannot be assigned to demand item &2 | ||
| 13 | /MRSS/SGE - 334 | HR transfer for resource &1 complete | ||
| 14 | /MRSS/SGE - 333 | HR transfer for resource &1 is in process | ||
| 15 | /MRSS/SGE - 288 | Duration of link is outside validity period of team | ||
| 16 | /MRSS/SGE - 284 | Resource &1 does not have any information about the geolocation | ||
| 17 | /MRSS/SGE - 205 | Time allocation &1 was deleted previously | ||
| 18 | /MRSS/SGE - 190 | Resource &1 is not valid in period | ||
| 19 | /MRSS/SGE - 190 | Resource &1 is not valid in period | ||
| 20 | /MRSS/SGE - 079 | No geolocation is available for resource &1 | ||
| 21 | /MRSS/SGE - 077 | Duration of time allocation must be greater than 0 | ||
| 22 | /MRSS/SGE - 075 | Cannot change resource of a time allocation | ||
| 23 | /MRSS/SGE - 068 | Time allocation is not available | ||
| 24 | /MRSS/SGE - 067 | Time allocation type is missing | ||
| 25 | /MRSS/SGE - 018 | Resource &1 is not a personnel resource | ||
| 26 | /MRSS/SGE - 017 | Start time must be earlier than end time | ||
| 27 | /MRSS/SGE - 017 | Start time must be earlier than end time | ||
| 28 | /MRSS/SGE - 017 | Start time must be earlier than end time | ||
| 29 | /MRSS/SGE - 011 | Link possible between personnel resource and tool only | ||
| 30 | /MRSS/SGE - 003 | Tool resource &1 cannot be assigned to item &2 | ||
| 31 | /MRSS/SGE - 002 | Personnel resource &1 cannot be assigned to item &2 |