Message Number list used by SAP ABAP Class /MRSS/CL_SGE_ASSIGNMENT (Scheduling Engine Assignment)
SAP ABAP Class
/MRSS/CL_SGE_ASSIGNMENT (Scheduling Engine Assignment) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
![]() |
![]() |
|||
1 | ![]() |
/MRSS/SGE - 468 | Assignment precedes validity period for resource &1 | |
2 | ![]() |
/MRSS/SGE - 334 | HR transfer for resource &1 complete | |
3 | ![]() |
/MRSS/SGE - 338 | Assignment exceeds validity period for resource &1 | |
4 | ![]() |
/MRSS/SGE - 353 | Work center of demand is not assigned to an organizational unit | |
5 | ![]() |
/MRSS/SGE - 359 | Assignment cannot be changed; split is already confirmed | |
6 | ![]() |
/MRSS/SGE - 395 | Start and end dates must be in the planning period between &1 and &2 | |
7 | ![]() |
/MRSS/SGE - 395 | Start and end dates must be in the planning period between &1 and &2 | |
8 | ![]() |
/MRSS/SGE - 396 | Start date &1 is earlier than the start date &2 of the planning period | |
9 | ![]() |
/MRSS/SGE - 396 | Start date &1 is earlier than the start date &2 of the planning period | |
10 | ![]() |
/MRSS/SGE - 397 | End date &1 is later than the end date of the planning period, &2 | |
11 | ![]() |
/MRSS/SGE - 397 | End date &1 is later than the end date of the planning period, &2 | |
12 | ![]() |
/MRSS/SGE - 408 | Start date &1, end date &2 must be in the planning period &3 - &4 | |
13 | ![]() |
/MRSS/SGE - 442 | Demand time frame was chosen for employee search | |
14 | ![]() |
/MRSS/SGE - 465 | Assignment is created/updated based on demand dates; assign. follows dem. | |
15 | ![]() |
/MRSS/SGE - 333 | HR transfer for resource &1 is in process | |
16 | ![]() |
/MRSS/SGE - 479 | Could not create assignment for tool resource | |
17 | ![]() |
/MRSS/SGE - 481 | Tool demand was created | |
18 | ![]() |
/MRSS/SGE - 654 | Technical object &1 of demand &2 is not available for the assignment | |
19 | ![]() |
/MRSS/SGE - 804 | Site supervisor indicator must be changed to assignments btw &1 and &2 | |
20 | ![]() |
/MRSS/SGE - 805 | Site Supervisor cannot be set, it is set in another Asgn.of the Operation | |
21 | ![]() |
/MRSS/SGE - 811 | Start time of preparation is later than end time of preparation (&1) | |
22 | ![]() |
/MRSS/SGE - 812 | Wrap-up phase cannot overlap with the assignment (&1) | |
23 | ![]() |
/MRSS/SGE - 813 | Start time of wrap-up is later than end time of wrap-up (&1) | |
24 | ![]() |
/MRSS/SGE - 814 | Arrival time cannot overlap with the preparation phase | |
25 | ![]() |
/MRSS/SGE - 817 | Preparation end is overlapping with assignment & | |
26 | ![]() |
/MRSS/SGE - 818 | Travel time is colliding with preparation for & | |
27 | ![]() |
/MRSS/SGE - 903 | No capacity slots found for the resource | |
28 | ![]() |
/MRSS/SGE - 215 | Type of assignment is not permitted (&1) | |
29 | ![]() |
/MRSS/SGE - 001 | Start time of assignment is later than the end time | |
30 | ![]() |
/MRSS/SGE - 010 | Cannot determine duration of the demand | |
31 | ![]() |
/MRSS/SGE - 010 | Cannot determine duration of the demand | |
32 | ![]() |
/MRSS/SGE - 012 | Assignment demand cannot be changed | |
33 | ![]() |
/MRSS/SGE - 017 | Start time must be earlier than end time | |
34 | ![]() |
/MRSS/SGE - 017 | Start time must be earlier than end time | |
35 | ![]() |
/MRSS/SGE - 026 | Start date &1 is earlier than the start date &2 of the planning period | |
36 | ![]() |
/MRSS/SGE - 027 | End date &1 is later than the end date of the planning period, &2 | |
37 | ![]() |
/MRSS/SGE - 059 | Assignment duration is less than the minimum duration (&1 minutes) | |
38 | ![]() |
/MRSS/SGE - 060 | Utilization must be greater than 0% and less than or equal to 100% | |
39 | ![]() |
/MRSS/SGE - 190 | Resource &1 is not valid in period | |
40 | ![]() |
/MRSS/SGE - 202 | Assignment &1 was changed by user &2 | |
41 | ![]() |
/MRSS/SGE - 203 | Assignment &1 was deleted previously | |
42 | ![]() |
/MRSS/SGE - 000 | Critical exception error has occurred; contact your system administrator | |
43 | ![]() |
/MRSS/SGE - 219 | Could not create assignment for resource &1 | |
44 | ![]() |
/MRSS/SGE - 226 | Assignment is not within the validity of the team | |
45 | ![]() |
/MRSS/SGE - 227 | Assignment for resource &1 is outside validity of team | |
46 | ![]() |
/MRSS/SGE - 235 | Error: external check class for demand type &1 | |
47 | ![]() |
/MRSS/SGE - 247 | Assignment probability must be 100% or less | |
48 | ![]() |
/MRSS/SGE - 255 | Demand &1 is indicated as no longer changeable | |
49 | ![]() |
/MRSS/SGE - 256 | Travel time cannot overlap with the assignment &1) | |
50 | ![]() |
/MRSS/SGE - 265 | Start time of arrival is later than end time of arrival (&1) | |
51 | ![]() |
/MRSS/SGE - 266 | Start time of departure is later than end time of departure (&1) | |
52 | ![]() |
/MRSS/SGE - 285 | Not all resources are displayed (insufficient authorization) | |
53 | ![]() |
/MRSS/SGE - 308 | Cannot assign tool since assignment for demand &1 is capacitive | |
54 | ![]() |
/MRSS/SGE - 313 | Cannot create assignment |