Message Number list used by SAP ABAP Class /MRSS/CL_SGE_ASSIGNMENT (Scheduling Engine Assignment)
SAP ABAP Class
/MRSS/CL_SGE_ASSIGNMENT (Scheduling Engine Assignment) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | /MRSS/SGE - 468 | Assignment precedes validity period for resource &1 | ||
| 2 | /MRSS/SGE - 334 | HR transfer for resource &1 complete | ||
| 3 | /MRSS/SGE - 338 | Assignment exceeds validity period for resource &1 | ||
| 4 | /MRSS/SGE - 353 | Work center of demand is not assigned to an organizational unit | ||
| 5 | /MRSS/SGE - 359 | Assignment cannot be changed; split is already confirmed | ||
| 6 | /MRSS/SGE - 395 | Start and end dates must be in the planning period between &1 and &2 | ||
| 7 | /MRSS/SGE - 395 | Start and end dates must be in the planning period between &1 and &2 | ||
| 8 | /MRSS/SGE - 396 | Start date &1 is earlier than the start date &2 of the planning period | ||
| 9 | /MRSS/SGE - 396 | Start date &1 is earlier than the start date &2 of the planning period | ||
| 10 | /MRSS/SGE - 397 | End date &1 is later than the end date of the planning period, &2 | ||
| 11 | /MRSS/SGE - 397 | End date &1 is later than the end date of the planning period, &2 | ||
| 12 | /MRSS/SGE - 408 | Start date &1, end date &2 must be in the planning period &3 - &4 | ||
| 13 | /MRSS/SGE - 442 | Demand time frame was chosen for employee search | ||
| 14 | /MRSS/SGE - 465 | Assignment is created/updated based on demand dates; assign. follows dem. | ||
| 15 | /MRSS/SGE - 333 | HR transfer for resource &1 is in process | ||
| 16 | /MRSS/SGE - 479 | Could not create assignment for tool resource | ||
| 17 | /MRSS/SGE - 481 | Tool demand was created | ||
| 18 | /MRSS/SGE - 654 | Technical object &1 of demand &2 is not available for the assignment | ||
| 19 | /MRSS/SGE - 804 | Site supervisor indicator must be changed to assignments btw &1 and &2 | ||
| 20 | /MRSS/SGE - 805 | Site Supervisor cannot be set, it is set in another Asgn.of the Operation | ||
| 21 | /MRSS/SGE - 811 | Start time of preparation is later than end time of preparation (&1) | ||
| 22 | /MRSS/SGE - 812 | Wrap-up phase cannot overlap with the assignment (&1) | ||
| 23 | /MRSS/SGE - 813 | Start time of wrap-up is later than end time of wrap-up (&1) | ||
| 24 | /MRSS/SGE - 814 | Arrival time cannot overlap with the preparation phase | ||
| 25 | /MRSS/SGE - 817 | Preparation end is overlapping with assignment & | ||
| 26 | /MRSS/SGE - 818 | Travel time is colliding with preparation for & | ||
| 27 | /MRSS/SGE - 903 | No capacity slots found for the resource | ||
| 28 | /MRSS/SGE - 215 | Type of assignment is not permitted (&1) | ||
| 29 | /MRSS/SGE - 001 | Start time of assignment is later than the end time | ||
| 30 | /MRSS/SGE - 010 | Cannot determine duration of the demand | ||
| 31 | /MRSS/SGE - 010 | Cannot determine duration of the demand | ||
| 32 | /MRSS/SGE - 012 | Assignment demand cannot be changed | ||
| 33 | /MRSS/SGE - 017 | Start time must be earlier than end time | ||
| 34 | /MRSS/SGE - 017 | Start time must be earlier than end time | ||
| 35 | /MRSS/SGE - 026 | Start date &1 is earlier than the start date &2 of the planning period | ||
| 36 | /MRSS/SGE - 027 | End date &1 is later than the end date of the planning period, &2 | ||
| 37 | /MRSS/SGE - 059 | Assignment duration is less than the minimum duration (&1 minutes) | ||
| 38 | /MRSS/SGE - 060 | Utilization must be greater than 0% and less than or equal to 100% | ||
| 39 | /MRSS/SGE - 190 | Resource &1 is not valid in period | ||
| 40 | /MRSS/SGE - 202 | Assignment &1 was changed by user &2 | ||
| 41 | /MRSS/SGE - 203 | Assignment &1 was deleted previously | ||
| 42 | /MRSS/SGE - 000 | Critical exception error has occurred; contact your system administrator | ||
| 43 | /MRSS/SGE - 219 | Could not create assignment for resource &1 | ||
| 44 | /MRSS/SGE - 226 | Assignment is not within the validity of the team | ||
| 45 | /MRSS/SGE - 227 | Assignment for resource &1 is outside validity of team | ||
| 46 | /MRSS/SGE - 235 | Error: external check class for demand type &1 | ||
| 47 | /MRSS/SGE - 247 | Assignment probability must be 100% or less | ||
| 48 | /MRSS/SGE - 255 | Demand &1 is indicated as no longer changeable | ||
| 49 | /MRSS/SGE - 256 | Travel time cannot overlap with the assignment &1) | ||
| 50 | /MRSS/SGE - 265 | Start time of arrival is later than end time of arrival (&1) | ||
| 51 | /MRSS/SGE - 266 | Start time of departure is later than end time of departure (&1) | ||
| 52 | /MRSS/SGE - 285 | Not all resources are displayed (insufficient authorization) | ||
| 53 | /MRSS/SGE - 308 | Cannot assign tool since assignment for demand &1 is capacitive | ||
| 54 | /MRSS/SGE - 313 | Cannot create assignment |