SAP ABAP Table WCA2 (WCM: Work and Requirements)
Hierarchy
☛
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
⤷
PM-WCM (Application Component) Work Clearance Management
⤷
WCM (Package) WCM: Work Clearance Management

⤷

⤷

Basic Data
Table Category | TRANSP | Transparent table |
Transparent table | WCA2 |
![]() |
Short Description | WCM: Work and Requirements |
Delivery and Maintenance
Pool/cluster | ||
Delivery Class | A | Application Table (Master- and Transaction Data) |
Data Browser/Table View Maintenance | Display/Maintenance Allowed with Restrictions |
Components
![]() |
Field | Key | Data Element | Domain | Data Type |
Length | Decimal Places |
Short Description | Check table |
---|---|---|---|---|---|---|---|---|---|
1 | ![]() |
MANDT | MANDT | CLNT | 3 | 0 | Client | T000 | |
2 | ![]() |
J_OBJNR | J_OBJNR | CHAR | 22 | 0 | Object number | ONR00 | |
3 | ![]() |
0 | 0 | WCM: Work | |||||
4 | ![]() |
WCEWK01 | WCDWK | CHAR | 1 | 0 | Hot Work A | ||
5 | ![]() |
WCEWK02 | WCDWK | CHAR | 1 | 0 | Hot Work B in Classified Areas | ||
6 | ![]() |
WCEWK03 | WCDWK | CHAR | 1 | 0 | Entry to Confined Spaces | ||
7 | ![]() |
WCEWK04 | WCDWK | CHAR | 1 | 0 | Isolation and Testing or Bypassing of Safety Systems | ||
8 | ![]() |
WCEWK05 | WCDWK | CHAR | 1 | 0 | Work on Hydrocarbon Systems (CmHn) | ||
9 | ![]() |
WCEWK06 | WCDWK | CHAR | 1 | 0 | Pressure Testing | ||
10 | ![]() |
WCEWK07 | WCDWK | CHAR | 1 | 0 | Work over Open Sea | ||
11 | ![]() |
WCEWK08 | WCDWK | CHAR | 1 | 0 | Work with Hazardous Substances | ||
12 | ![]() |
WCEWK09 | WCDWK | CHAR | 1 | 0 | Work with Radioactive Materials | ||
13 | ![]() |
WCEWK10 | WCDWK | CHAR | 1 | 0 | Well Operation/Well Intervention | ||
14 | ![]() |
WCEWK11 | WCDWK | CHAR | 1 | 0 | Work with Explosives | ||
15 | ![]() |
WCEWK12 | WCDWK | CHAR | 1 | 0 | Critical Lifting Operations | ||
16 | ![]() |
WCEWK13 | WCDWK | CHAR | 1 | 0 | Other Activities/Critical Operations | ||
17 | ![]() |
WCEWK14 | WCDWK | CHAR | 1 | 0 | Nightwork | ||
18 | ![]() |
WCEWK15 | WCDWK | CHAR | 1 | 0 | Work at Height | ||
19 | ![]() |
WCEWK16 | WCDWK | CHAR | 1 | 0 | Overhead Work | ||
20 | ![]() |
WCEWK17 | WCDWK | CHAR | 1 | 0 | Replacing Lamps | ||
21 | ![]() |
WCEWK18 | WCDWK | CHAR | 1 | 0 | Work in Manholes | ||
22 | ![]() |
WCEWK19 | WCDWK | CHAR | 1 | 0 | Cleaning Work | ||
23 | ![]() |
WCEWK20 | WCDWK | CHAR | 1 | 0 | Demolition Work | ||
24 | ![]() |
WCEWK21 | WCDWK | CHAR | 1 | 0 | Work on Ventilation | ||
25 | ![]() |
WCEWK22 | WCDWK | CHAR | 1 | 0 | Work on Water Supply | ||
26 | ![]() |
WCEWK23 | WCDWK | CHAR | 1 | 0 | Work on Gas Plant | ||
27 | ![]() |
WCEWK24 | WCDWK | CHAR | 1 | 0 | Simultaneous Works | ||
28 | ![]() |
WCEWK25 | WCDWK | CHAR | 1 | 0 | Restructuring Work | ||
29 | ![]() |
WCEWK26 | WCDWK | CHAR | 1 | 0 | Painting Work | ||
30 | ![]() |
WCEWK27 | WCDWK | CHAR | 1 | 0 | Checking | ||
31 | ![]() |
WCEWK28 | WCDWK | CHAR | 1 | 0 | More Work | ||
32 | ![]() |
0 | 0 | WCM: Requirements | |||||
33 | ![]() |
WCENEED01 | WCDNEED | CHAR | 1 | 0 | Depressurization | ||
34 | ![]() |
WCENEED02 | WCDNEED | CHAR | 1 | 0 | Draining/Emptying | ||
35 | ![]() |
WCENEED03 | WCDNEED | CHAR | 1 | 0 | Cleaning/Hydrocarbon Freeing | ||
36 | ![]() |
WCENEED04 | WCDNEED | CHAR | 1 | 0 | Venting/Installation of Extra Ventilation | ||
37 | ![]() |
WCENEED05 | WCDNEED | CHAR | 1 | 0 | Prevent Release of Oil and Gas in the Work Area | ||
38 | ![]() |
WCENEED06 | WCDNEED | CHAR | 1 | 0 | Measures Against Radioactive Radiation | ||
39 | ![]() |
WCENEED07 | WCDNEED | CHAR | 1 | 0 | Regular Inspection of the Work Area | ||
40 | ![]() |
WCENEED08 | WCDNEED | CHAR | 1 | 0 | Gas Measurements Prior to/During Working Period | ||
41 | ![]() |
WCENEED09 | WCDNEED | CHAR | 1 | 0 | Fire Prevention | ||
42 | ![]() |
WCENEED10 | WCDNEED | CHAR | 1 | 0 | Continuous Guard/Radio | ||
43 | ![]() |
WCENEED11 | WCDNEED | CHAR | 1 | 0 | Drains Blocked/Covered | ||
44 | ![]() |
WCENEED12 | WCDNEED | CHAR | 1 | 0 | Set Up Barriers and Safety Signs | ||
45 | ![]() |
WCENEED13 | WCDNEED | CHAR | 1 | 0 | PA Announcements | ||
46 | ![]() |
WCENEED14 | WCDNEED | CHAR | 1 | 0 | Welding Machine Safely Located and Earthed | ||
47 | ![]() |
WCENEED15 | WCDNEED | CHAR | 1 | 0 | Follow Requirements for Work on Open Sea | ||
48 | ![]() |
WCENEED16 | WCDNEED | CHAR | 1 | 0 | Follow Requirements for Work At Height | ||
49 | ![]() |
WCENEED17 | WCDNEED | CHAR | 1 | 0 | HSE Datasheet Known and Available | ||
50 | ![]() |
WCENEED18 | WCDNEED | CHAR | 1 | 0 | Job Safety Analysis (JSA) | ||
51 | ![]() |
WCENEED19 | WCDNEED | CHAR | 1 | 0 | Lockout/Tagout | ||
52 | ![]() |
WCENEED20 | WCDNEED | CHAR | 1 | 0 | Provide Extinguishing Media | ||
53 | ![]() |
WCENEED21 | WCDNEED | CHAR | 1 | 0 | Set Up Fire Watch | ||
54 | ![]() |
WCENEED22 | WCDNEED | CHAR | 1 | 0 | Inform External Bodies | ||
55 | ![]() |
WCENEED23 | WCDNEED | CHAR | 1 | 0 | On-Site Instruction | ||
56 | ![]() |
WCENEED24 | WCDNEED | CHAR | 1 | 0 | Additional Protective Equipment | ||
57 | ![]() |
WCENEED25 | WCDNEED | CHAR | 1 | 0 | Maintain Initial List | ||
58 | ![]() |
WCENEED26 | WCDNEED | CHAR | 1 | 0 | Safety Staff | ||
59 | ![]() |
WCENEED27 | WCDNEED | CHAR | 1 | 0 | More Measures | ||
60 | ![]() |
WCENEED28 | WCDNEED | CHAR | 1 | 0 | Secure Installations | ||
61 | ![]() |
0 | 0 | WCM: I/O Administration Data (Create) | |||||
62 | ![]() |
WCECRNAME | USNAM | CHAR | 12 | 0 | Created by | ||
63 | ![]() |
WCECRDATE | DATUM | DATS | 8 | 0 | Date on Which the Object Was Created | ||
64 | ![]() |
WCECRTIME | UZEIT | TIMS | 6 | 0 | Time at Which Object was Created | ||
65 | ![]() |
0 | 0 |
Foreign Keys
![]() |
Source Table | Source Column | Foreign Table | Foreign Column | Dependency Factor | Cardinality left | Cardinality right |
---|---|---|---|---|---|---|---|
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
1 | WCA2 | MANDT | ![]() |
![]() |
|||
2 | WCA2 | OBJNR | ![]() |
![]() |
History
Last changed by/on | SAP | 20130529 |
SAP Release Created in | 605 |