SAP ABAP Table VCRCA (Change Document Structure; generated by RSSCD000)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       CR (Package) R/3 Application development: PP Resources
Basic Data
Table Category INTTAB    Structure 
Structure VCRCA   Table Relationship Diagram
Short Description Change Document Structure; generated by RSSCD000    
Delivery and Maintenance
Pool/cluster      
Delivery Class      
Data Browser/Table View Maintenance     Display/Maintenance Allowed with Restrictions 
Components
     
Field Key Data Element Domain Data
Type
Length Decimal
Places
Short Description Check
table
1 .INCLUDE       0   0   Work Center Capacity Allocation  
2 MANDT MANDT MANDT CLNT 3   0   Client T000
3 OBJTY CR_OBJTY CR_OBJTY CHAR 2   0   Object types of the CIM resource  
4 OBJID CR_OBJID CR_OBJID NUMC 8   0   Object ID of the resource CRID
5 CANUM CR_CAPNUM NUM4 NUMC 4   0   Capacity allocation number  
6 BEGDA BEGDATUM DATUM DATS 8   0   Start Date  
7 ENDDA ENDDATUM DATUM DATS 8   0   End Date  
8 AEDAT_KAPA AEDTM DATUM DATS 8   0   Changed on  
9 AENAM_KAPA USRNAME CHAR12 CHAR 12   0   User Name  
10 KAPID KAPID KAPID NUMC 8   0   Capacity ID KAKO
11 FORK1 AP_FORM_K1 AP_FORMEL CHAR 6   0   Formula for setup capacity requirements TC25
12 FORK2 AP_FORM_K2 AP_FORMEL CHAR 6   0   Formula for processing capacity requirements TC25
13 FORK3 AP_FORM_K3 AP_FORMEL CHAR 6   0   Formula for teardown capacity requirements TC25
14 FORKN AP_FORM_KN AP_FORMEL CHAR 6   0   Formula for cap. reqmts. for other types of int. processing TC25
15 PROZT AP_PROZ_KA AWAHR NUMC 3   0   Percentage share of available capacity  
16 VERT1 CR_VERT1 CR_VERTL CHAR 8   0   Distribution of capacity requirements (Planned/prod.order) TC29
17 VERT2 CR_VERT2 CR_VERTL CHAR 8   0   Key for distributing requirements over processing time TC29
18 VERT3 CR_VERT3 CR_VERTL CHAR 8   0   Distribution key for teardown requirements TC29
19 VERTN CR_VERTN CR_VERTL CHAR 8   0   Distr.cap.reqmts (plant maint.,process order, network) TC29
20 CAROL CR_CAPROLE TEXT40 CHAR 40   0   Role of work center capacity  
21 ISTBED_KZ CY_ISTBEDKZ CY_ISTBEDKZ CHAR 1   0   Calculation of actual capacity requirements  
22 VGWT1 CY_VGWT1 PARAMID CHAR 6   0   Actual requirements for operation segment setup *
23 VGWT2 CY_VGWT2 PARAMID CHAR 6   0   Actual requirements for operation segment processing *
24 VGWT3 CY_VGWT3 PARAMID CHAR 6   0   Actual capacity requirements for operation segment teardown *
25 VGWTN CY_VGWTN PARAMID CHAR 6   0   Actual capacity requirements for in-house processing *
26 CAP_BACKFLUSH_SU CAP_BACKFLUSH CAP_BACKFLUSH NUMC 1   0   Control: Calc. of Remaining Req./Duration After Confirmation  
27 CAP_BACKFLUSH_PR CAP_BACKFLUSH CAP_BACKFLUSH NUMC 1   0   Control: Calc. of Remaining Req./Duration After Confirmation  
28 CAP_BACKFLUSH_TD CAP_BACKFLUSH CAP_BACKFLUSH NUMC 1   0   Control: Calc. of Remaining Req./Duration After Confirmation  
29 .INCLUDE       0   0   Structures for generating change document update programs  
30 KZ CDCHNGIND CDCHNGIND CHAR 1   0   Change type (U, I, E, D)  
Foreign Keys
Source Table Source Column Foreign Table Foreign Column Dependency Factor Cardinality left Cardinality right
1 VCRCA FORK1 TC25 IDENT REF C CN
2 VCRCA FORK2 TC25 IDENT REF C N
3 VCRCA FORK3 TC25 IDENT REF C CN
4 VCRCA FORKN TC25 IDENT REF C CN
5 VCRCA KAPID KAKO KAPID REF 1 CN
6 VCRCA MANDT T000 MANDT KEY 1 CN
7 VCRCA OBJID CRID OBJID KEY 1 CN
8 VCRCA VERT1 TC29 VERTL REF C CN
9 VCRCA VERT2 TC29 VERTL REF C CN
10 VCRCA VERT3 TC29 VERTL REF C N
11 VCRCA VERTN TC29 VERTL REF C CN
History
Last changed by/on SAP  20050825 
SAP Release Created in