SAP ABAP Table Field REEX_WBS_ELEMENT-PRCTR (Profit Center)
Hierarchy
☛ EA-FIN (Software Component) EA-FIN
   ⤷ RE-FX-BD (Application Component) Basic Data
     ⤷ RE_EX_PS (Package) RE: Project System (Interface to Project System)
Basic Data
Table REEX_WBS_ELEMENT     WBS Element (PRPS)
Field PRCTR     Profit Center
Position 22    
Field Attributes
Key    
Mandatory    
Data Element PRCTR     Profit Center
Check Table CEPC     Profit Center Master Data Table
Nesting depth for includes 3    
Internal ABAP Type C     Character String
Internal Length in Bytes 10    
Reference table      
Name of Include      
Reference Field (CURR or QTY)      
Check module    
NOT NULL forced       Any NULL or NOT NULL
Data Type in ABAP Dictionary CHAR     Character String
Length (No. of Characters) 10    
Number of Decimal Places 0    
Domain name PRCTR     Profit center
Origin of an input help (F4) P     Input help implemented with check table
DD: Flag if it is a table       No / FALSE
DD: Depth for structured types 0    
DD: Component Type E     Data element
Type of Object Referenced       No Information
DD: Indicator for a Language Field       Not selected as language field
Position of the field in the table 0    
History
Last changed by/on SAP  20130529 
SAP Release Created in 500