SAP ABAP Table BAPISCHDL2 (Comm. Fields for Sales Doc. Schedule Line (Confirmation))
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM-BF (Application Component) Basic Functions
⤷
VACR (Package) B2R: Development Class for BAPI structures
⤷
⤷
Basic Data
| Table Category | INTTAB | Structure |
| Structure | BAPISCHDL2 |
|
| Short Description | Comm. Fields for Sales Doc. Schedule Line (Confirmation) |
Delivery and Maintenance
| Pool/cluster | ||
| Delivery Class | ||
| Data Browser/Table View Maintenance | Display/Maintenance Allowed with Restrictions |
Components
| |
Field | Key | Data Element | Domain | Data Type |
Length | Decimal Places |
Short Description | Check table |
|---|---|---|---|---|---|---|---|---|---|
| 1 | |
POSNR_VA | POSNR | NUMC | 6 | 0 | Sales Document Item | ||
| 2 | |
REFETENR | ETENR | NUMC | 4 | 0 | Reference Schedule Line Number | * | |
| 3 | |
BMENG | MENG13 | QUAN | 13 | 3 | Confirmed quantity | ||
| 4 | |
EDATU | DATUM | DATS | 8 | 0 | Schedule line date | ||
| 5 | |
EZEIT_VBEP | UZEIT | TIMS | 6 | 0 | Arrival time | ||
| 6 | |
TDDAT_D | DATUM | DATS | 8 | 0 | Transportation Planning Date | ||
| 7 | |
TDUHR | TIME_SHIPP | TIMS | 6 | 0 | Transp. Planning Time (Local, Relating to a Shipping Point) | ||
| 8 | |
MBDAT | DATUM | DATS | 8 | 0 | Material Staging/Availability Date | ||
| 9 | |
MBUHR | TIME_PLANT | TIMS | 6 | 0 | Material Staging Time (Local, Relating to a Plant) | ||
| 10 | |
LDDAT | DATUM | DATS | 8 | 0 | Loading Date | ||
| 11 | |
LDUHR | TIME_SHIPP | TIMS | 6 | 0 | Loading Time (Local Time Relating to a Shipping Point) | ||
| 12 | |
WADAT | DATUM | DATS | 8 | 0 | Goods Issue Date | ||
| 13 | |
WAUHR | TIME_PLANT | TIMS | 6 | 0 | Time of Goods Issue (Local, Relating to a Plant) | ||
| 14 | |
ETENR | ETENR | NUMC | 4 | 0 | Schedule line | * |
History
| Last changed by/on | SAP | 20060411 |
| SAP Release Created in | 30A |