# |
Screen |
Short Description |
1 |
0100 |
Display Quantity Structure Data (BOM, Routing...) |
2 |
0111 |
Initial screen: create or change material cost estimate |
3 |
0113 |
Request Display of Cost Estimate of Single-Level BOM |
4 |
0141 |
Create Request Screen for Manual Cost Estimate |
5 |
0142 |
Change Request Screen for Manual Cost Estimate |
6 |
0143 |
Display Request Screen for Manual Cost Estimate |
7 |
0400 |
Online screen for date control |
8 |
0410 |
Entry of Type Kept in Stock |
9 |
0420 |
Entry of Transfer Control ID |
10 |
0430 |
Error handling (only cost KF, allow maximum errors) |
11 |
0500 |
Header Data for All Screens of Manual Cost Estimate |
12 |
0501 |
Header Data for All Screens of Automatic Cost Estimate |
13 |
0600 |
Selection screen for a validity period for manual cost est. |
14 |
0601 |
Selection Screen of Validity Period for Automatic Cost Est |
15 |
0700 |
Parallel Costing - Dispatcher Screen |
16 |
0800 |
Test screen as initial screen for sales order costing |
17 |
1000 |
Low-Level Code Overview |
18 |
2000 |
Screen for ALV Display |
19 |
2001 |
Material/assembly/material component - overview |
20 |
2002 |
Material/assembly/material component - overview (Rel. 2.1) |
21 |
2003 |
Dialog Box for Positioning Cursor on Overview Screens |
22 |
2004 |
Material/single-lev. BOM/mat. component: Overview (pre-4.5A) |
23 |
2010 |
Dialog Screen for Specifying Print Parameters for USER EXIT |
24 |
2100 |
Total Overview for a Material |
25 |
2101 |
Dialog Box for Display of Costing Dates |
26 |
2102 |
Selection screen for costing variants in the costing run |
27 |
2103 |
Selection screen for cost views for cost component display |
28 |
2104 |
Dialog Box for Display of Manual Costs |
29 |
2105 |
Dialog Screen for Displaying Administrative Data |
30 |
2106 |
Dialog Screen for Displaying the Valuation Data |
31 |
2110 |
Header Information on Detail Screen |
32 |
2111 |
Header Information on Detail Screen for Config. Materials |
33 |
2150 |
Cost overview for an assembly |
34 |
2151 |
Cost overview for a material component |
35 |
2160 |
Valuation Data for a Single-Level BOM |
36 |
2161 |
Valuation Data for Material Component |
37 |
2162 |
Valuation Data for an Assembly on POPUP |
38 |
2163 |
Valuation Data for a Material Component on POPUP |
39 |
2200 |
Detail Screen for Material Cost Estimate from 3.0 |
40 |
2201 |
Display Costs Total/Fixed Detail Screen Release 3.0 |
41 |
2202 |
Display Costs Total/Variable Detail Screen Release 3.0 |
42 |
2210 |
Dialog Screen for Entering Configuration Parameters |
43 |
3000 |
Update query |
44 |
4001 |
Request Screen for Creating Costing Run |
45 |
4002 |
Request Screen: Change Costing Run |
46 |
4003 |
Request Screen: Display Costing Run |
47 |
4004 |
Request Screen: Execute Costing Run |
48 |
4010 |
Selection screen for costing run |
49 |
4050 |
Costing Run: General Data |
50 |
4051 |
Subscreen for Costing Run with One Costing Variant |
51 |
4052 |
Subbscreen for Costing Run with More Than One Costing Vrnt |
52 |
4100 |
Costing run: overview screen |
53 |
4200 |
Costing Run: Selection of Costing Variant |
54 |
4201 |
Dialog Screen for Date Control for Costing Run |
55 |
4202 |
Select Costing Variant for Run |
56 |
4203 |
Dialog Screen for Selection of Update Parameters |
57 |
4204 |
Dialog Screen for Selection of Print Parameters |
58 |
5050 |
Sales order costing: Header data |
59 |
8999 |
Reference for Screens in Work Area CK |
60 |
9999 |
|
|
|
|
# |
GUI Status |
Short Description |
1 |
B0111A |
AUTO. COST EST.MAT.: REQUEST SCREEN:CK13 |
2 |
B0111H |
AUTO. COST EST.MAT.: REQUEST SCREEN:CK11 |
3 |
B2000H |
AUTO. COST EST.MAT.:MAT. OVERVIEW/ASSEMBLY OVERVIEW:CK11 |
4 |
B2100A |
AUTO. COST EST.MAT.:DETAIL SCR:CK13 |
5 |
B2100H |
AUTO. COST EST.MAT.:DETAIL SCR:CK11 |
6 |
D1000H |
AUTO. COST EST.MAT.:LOW-LVL CODE OVERVW:CK11 |
7 |
E2210A |
Detail Screen Settings |
8 |
E2210H |
Detail Screen Settings |
9 |
E2210V |
Detail Screen Settings |
10 |
E2210X |
Detail Screen Settings |
11 |
KAALLX |
SALES ORDER COSTING: MATERIAL OVERVIEW |
12 |
KABGRX |
SALES ORDER COSTING: ASSEMBLY OVERVIEW |
13 |
KADISX |
SALES ORDER COSTING: OVERVIEW OF LOW-LEVEL CODES |
14 |
KAGESX |
SALES ORDER COSTING: DETAIL SCREEN |
15 |
KAROHX |
SALES ORDER COSTING: OVERVIEW MATERIAL COMPS |
16 |
L4000A |
COSTING RUN MAT.:REQEST SCREEN:CK43 |
17 |
L4000H |
COSTING RUN MAT.:REQUEST SCREEN:CK41 |
18 |
L4000V |
COSTING RUN MAT.:REQUEST SCREEN:CK42 |
19 |
L4000X |
COSTING RUN MAT.:REQUEST SCREEN:CK64 |
20 |
L4100A |
COSTING RUN MAT.:GENERAL DATA:CK43 |
21 |
L4100H |
COSTING RUN MAT.:GENERAL DATA:CK41 |
22 |
L4100V |
COSTING RUN MAT.:GENERAL DATA:CK42 |
23 |
L4100X |
COSTING RUN MAT.:GENERAL DATA:CK64 |
24 |
L4200A |
COSTING RUN MAT.:OVERVIEW CST.VAR.:CK43 |
25 |
L4200H |
COSTING RUN MAT.:OVERVIEW CST.VAR.:CK41 |
26 |
L4200V |
COSTING RUN MAT.:OVERVIEW CST.VAR.:CK42 |
27 |
L4200X |
COSTING RUN MAT.:OVERVIEW CST.VAR.:CK64 |
28 |
LUALLA |
COSTING RUN MAT.:MAT. OVERVIEW:CK43 |
29 |
LUALLV |
COSTING RUN MAT.:MAT. OVERVIEW:CK42 |
30 |
LUALLX |
COSTING RUN MAT.:MAT. OVERVIEW:CK64 |
31 |
LUBGRA |
COSTING RUN MAT.:ASSEMBLY OVERVIEW:CK43 |
32 |
LUBGRV |
COSTING RUN MAT.:ASSEMBLY OVERVIEW:CK42 |
33 |
LUBGRX |
COSTING RUN MAT.:ASSEMBLY OVERVIEW:CK64 |
34 |
LUDISA |
COSTING RUN MAT.:LOW-LVL CODE OVERVIEW:CK43 |
35 |
LUDISV |
COSTING RUN MAT.:LOW-LVL CODE OVERVIEW:CK42 |
36 |
LUDISX |
COSTING RUN MAT.:LOW-LVL CODE OVERVIEW:CK64 |
37 |
LUGESA |
COSTING RUN MAT.:DETAIL SCREEN:CK43 |
38 |
LUGESV |
COSTING RUN MAT.:DETAIL SCREEN:CK42 |
39 |
LUGESX |
COSTING RUN MAT.:DETAIL SCREEN:CK64 |
40 |
LUROHA |
COSTING RUN MAT.:MAT.COMP.OVERVIEW:CK43 |
41 |
LUROHV |
COSTING RUN MAT.:MAT.COMP.OVERVIEW:CK42 |
42 |
LUROHX |
COSTING RUN MAT.:MAT.COMP.OVERVIEW:CK64 |
43 |
M0141A |
ADDITIVE COST EST.:REQ. SCREEN:CK73 |
44 |
M0141H |
ADDITIVE COST EST.:REQ. SCREEN:CK71 |
45 |
M0141V |
ADDITIVE COST EST.:REQ. SCREEN:CK72 |
46 |
M0143A |
ADDITIVE COST EST.:REQ. SCREEN:CK73 |
47 |
PRINTA |
Printout User Exit |
48 |
PRINTH |
Printout User Exit |
49 |
PRINTV |
Printout User Exit |
50 |
PRINTX |
Printout User Exit |
51 |
P_DR_H |
Specify Print Parameters |
52 |
P_VB_H |
Specify Update Parameters |
53 |
R2000H |
AUTO. COST EST. MAT.:MAT.COMP.OVERVIEW:CK11 |
54 |
SELEKA |
CHOOSE->NEXT SCREEN/ENTER->SAME SCREEN:CK.. |
55 |
SELEKH |
CHOOSE->NEXT SCREEN/ENTER->SAME SCREEN:CK.. |
56 |
SELEKV |
CHOOSE->NEXT SCREEN/ENTER->SAME SCREEN:CK.. |
57 |
SELEKX |
CHOOSE->NEXT SCREEN/ENTER->SAME SCREEN:CK64 |
58 |
T0400A |
ENTER->ORIG.SCREEN:CK.. |
59 |
T0400H |
ENTER->ORIG.SCREEN:CK.. |
60 |
T0400V |
ENTER->ORIG.SCREEN:CK.. |
61 |
T0400X |
ENTER->ORIG.SCREEN:CK64 |
62 |
V3000H |
ENTER->NEXT SCREEN:CK.. |
63 |
V3000V |
ENTER->NEXT SCREEN:CK.. |
64 |
XX-700 |
Parallel Costing Run -Dispatcher- |
|
|
|
# |
GUI Title |
Short Description |
1 |
060 |
Costing Run - Parallel Processing |
2 |
40A |
Display Costing Run (Material): Initial Screen |
3 |
40H |
Create Costing Run (Material): Initial Screen |
4 |
40V |
Change Costing Run (Material): Initial Screen |
5 |
40X |
Execute Costing Run (Material): Initial Screen |
6 |
41A |
Display Costing Run (Material): General Data |
7 |
41H |
Create Costing Run (Material): General Data |
8 |
41V |
Change Costing Run (Material): General Data |
9 |
41X |
Execute Costing Run (Material): General Data |
10 |
42A |
Display Costing Run (Material): Costing Variant Selection |
11 |
42H |
Create Costing Run (Material): Costing Variant Selection |
12 |
42V |
Change Costing Run (Material): Costing Variant Selection |
13 |
42X |
Execute Costing Run (Material): Costing Variant Selection |
14 |
43A |
Display Costing Run (Material): Costing Level Overview |
15 |
43H |
Create Costing Run (Material): Costing Level Overview |
16 |
43V |
Change Costing Run (Material): Costing Level Overview |
17 |
43X |
Execute Costing Run (Material): Costing Level Overview |
18 |
44A |
Display Costing Run (Material): Material Overview |
19 |
44H |
Create Costing Run (Material): Material Overview |
20 |
44V |
Change Costing Run (Material): Material Overview |
21 |
44X |
Execute Costing Run (Material): Material Overview |
22 |
45A |
Display Costing Run (Material): Assembly Overview |
23 |
45H |
Create Costing Run (Material): Assembly Overview |
24 |
45V |
Change Costing Run (Material): Assembly Overview |
25 |
45X |
Execute Costing Run (Material): Assembly Overview |
26 |
46A |
Display Costing Run (Material): Material Component Overview |
27 |
46V |
Change Costing Run (Material): Material Component Overview |
28 |
46X |
Execute Costing Run (Material): Material Component Overview |
29 |
47A |
Display Costing Run (Material): Costing Date for Material |
30 |
47V |
Change Costing Run (Material): Costing Date for Material |
31 |
47X |
Execute Costing Run (Material): Costing Date for Material |
32 |
53X |
Sales Order Costing: Costing Level Overview |
33 |
54X |
Sales Order Costing: List of Materials |
34 |
55X |
Sales Order Costing: Assembly Overview |
35 |
56X |
Sales Order Costing: Overview of Material Components |
36 |
57X |
Sales Order Costing: Costing Data for Material |
37 |
60A |
Selection: Validity Period |
38 |
60V |
Selection: Validity Period |
39 |
B1A |
Display Material Cost Estimate: Initial Screen |
40 |
B1H |
Create Material Cost Estimate: Initial Screen |
41 |
B2H |
Create Material Cost Estimate: Assembly Overview |
42 |
B3A |
Display Material Cost Estimate: Material Costing Data |
43 |
B3H |
Create Material Cost Estimate: Material Costing Data |
44 |
D1A |
Display Material Cost Estimate: Costing Level Overview |
45 |
D1H |
Create Material Cost Estimate: Costing Level Overview |
46 |
D1V |
Change Material Cost Estimate: Costing Level Overview |
47 |
D2A |
Printout via User Exit |
48 |
D2H |
Printout via User Exit |
49 |
D2V |
Printout via User Exit |
50 |
D2X |
Printout via User Exit |
51 |
E1A |
Settings for Cost Display |
52 |
E1H |
Settings for Cost Display |
53 |
E1V |
Settings for Cost Display |
54 |
E1X |
Settings for Cost Display |
55 |
F0A |
Error Handling |
56 |
F0H |
Error Handling |
57 |
F0V |
Error Handling |
58 |
F0X |
Error Handling |
59 |
H1A |
History of Cost Estimate |
60 |
H1H |
History of Cost Estimate |
61 |
H1V |
History of Cost Estimate |
62 |
H1X |
History of Cost Estimate |
63 |
K1A |
Selection: Costing Variant |
64 |
K1H |
Selection: Costing Variant |
65 |
K1V |
Selection: Costing Variant |
66 |
K1X |
Selection: Costing Variant |
67 |
KLA |
Selection: Costing Run |
68 |
KLV |
Selection: Costing Run |
69 |
L1A |
Display Material Cost Estimate: Material Overview |
70 |
L1H |
Create Material Cost Estimate: Material Overview |
71 |
L1V |
Change Material Cost Estimate: Material Overview |
72 |
M1A |
Display Additive Cost Estimate: Initial Screen |
73 |
M1H |
Create Additive Cost Estimate: Initial Screen |
74 |
M1V |
Change Additive Cost Estimate: Initial Screen |
75 |
M2A |
Additive Costs |
76 |
M2H |
Additive Costs |
77 |
M2V |
Additive Costs |
78 |
M2X |
Additive Costs |
79 |
P1A |
Update Parameters |
80 |
P1H |
Update Parameters |
81 |
P1V |
Update Parameters |
82 |
P1X |
Update Parameters |
83 |
P2A |
Print Parameters |
84 |
P2H |
Print Parameters |
85 |
P2V |
Print Parameters |
86 |
P2X |
Print Parameters |
87 |
POA |
Position Cursor |
88 |
POH |
Position Cursor |
89 |
POV |
Position Cursor |
90 |
POX |
Position Cursor |
91 |
R2H |
Create Material Cost Estimate: Material Component Overview |
92 |
S1A |
View Selection |
93 |
S1H |
View Selection |
94 |
S1V |
View Selection |
95 |
S1X |
View Selection |
96 |
STH |
Control Data |
97 |
T1A |
Costing Dates |
98 |
T1H |
Costing Dates |
99 |
T1V |
Costing Dates |
100 |
T1X |
Costing Dates |
101 |
T2A |
Quantity Structure: & & |
102 |
T2H |
Quantity Structure: & & |
103 |
T2V |
Quantity Structure: & & |
104 |
T2X |
Quantity Structure: & & |
105 |
T3A |
Entry: Configured Material |
106 |
U1H |
Transfer Control |
107 |
U1V |
Transfer Control |
108 |
V1H |
Update Parameters |
109 |
V1V |
Update Parameters |
110 |
W1A |
Valuation Data |
111 |
W1H |
Valuation Data |
112 |
W1V |
Valuation Data |
113 |
W1X |
Valuation Data |
|
|
|