SAP ABAP Message Class VY Message Number 122 (Shipment costs already calculated for shipment &1)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
VTRA (Package) Shipment costs
⤷
⤷
Attribute
| Message class | VY | ||
| Short Description | Messages for freight processing | ||
| Message Number | |
122 | |
| Documentation status | |||
| Authorization check Error Message | |||
| Changed On | 20100310 |
Message Text
Shipment costs already calculated for shipment &1
Help Document
Diagnosis
If you want to create a shipment cost document, the shipment must meet the following requirements:
- Transporation planning must be completed for this shipment. This means that the shipment must have the status Planned.
- The overall status of the shipment must have at least the value specified in the shipment cost type.
- The shipment must be relevant for shipment costs calculation. This is indicated with the overall shipment costs calculation status in the shipment header.
A shipment is relevant for shipment costs calculation if the shipment header or at least one of the shipment stages is relevant for shipment costs calculation. - A shipment cost document must not yet exist for this shipment.
System Response
Procedure
History
| Last changed on/by | 20140121 | SAP | |
| SAP Release Created in |