SAP ABAP Message Class REEXCO (Messages for CO Integration)
Basic Data
Hierarchy
☛
EA-FIN (Software Component) EA-FIN
⤷
RE-FX-CO (Application Component) Real Estate Controlling
⤷
RE_EX_CO (Package) RE: Controlling
⤷
⤷
Attributes
| Message class | REEXCO | |
| Short Description | Messages for CO Integration | |
| Changed On | 20131127 | |
| Last Changed At | 181532 |
Messages
| # | Message | Message Short Text | Documentation status | Authorization check |
|---|---|---|---|---|
| 1 | Activity &1 is not possible for object &2 | Space: object requires documentation | ||
| 2 | Object &1 does not exist | Space: object requires documentation | ||
| 3 | Selection variant &1 does not exist | Space: object requires documentation | ||
| 4 | Enter a selection variant | Space: object requires documentation | ||
| 5 | Enter an object | Space: object requires documentation | ||
| 6 | Settlement type &1 does not exist | Space: object requires documentation | ||
| 7 | Allocation rule &1 was already used - new validity to &2/&3 | Space: object requires documentation | ||
| 8 | Cost element &1 is not valid in entire period &2 - &3 | The short text describes the object sufficiently | ||
| 9 | Single object not possible in background processing | The short text describes the object sufficiently | ||
| 10 | Cost center &1 &2 (&3) does not exist | The short text describes the object sufficiently | ||
| 11 | Cost center &1 is in wrong controlling area (&2 <> &3) | The short text describes the object sufficiently | ||
| 12 | &1 is in wrong controlling area (&2 not &3) | The short text describes the object sufficiently | ||
| 13 | Enter controlling area or company code for cost center | The short text describes the object sufficiently | ||
| 14 | Enter a controlling area | The short text describes the object sufficiently | ||
| 15 | Copy of cash flow in CO plan data - mode: &1 | Space: object requires documentation | ||
| 16 | Started on &1 at &2 by user &3 | Space: object requires documentation | ||
| 17 | Support mode activated | Space: object requires documentation | ||
| 18 | Contract Selection | Space: object requires documentation | ||
| 19 | Contract &1/&2 is not active | Space: object requires documentation | ||
| 20 | Processing of cash flow | Space: object requires documentation | ||
| 21 | CO interface | Space: object requires documentation | ||
| 22 | Number of selected contracts: &1 | Space: object requires documentation | ||
| 23 | Cost element not found for account symbol &1 | Space: object requires documentation | ||
| 24 | Processing of Object &1 | Space: object requires documentation | ||
| 25 | Adjustment factor for condition type &1 is not unique | Space: object requires documentation | ||
| 26 | &1: object type not supported | Space: object requires documentation | ||
| 27 | Enter a positive value | Space: object requires documentation | ||
| 28 | Company codes are assigned to different controlling areas | The short text describes the object sufficiently | ||
| 29 | Cost center &1 is not assigned to company code &4 from &2 to &3 | Space: object requires documentation | ||
| 30 | &1 is in a different company code (&2 <> &3) | Space: object requires documentation | ||
| 31 | Planning not possible for cost element &1 | The short text describes the object sufficiently | ||
| 32 | The amount is adjusted based on period distribution from &1 to &2 | The short text describes the object sufficiently | ||
| 33 | Transfer of measurement to statistical key figure: &1 - &2 - &3 | Space: object requires documentation | ||
| 34 | Period &2 - &3 --Mode: &4 | The short text describes the object sufficiently | ||
| 35 | Object &1: &2 | Space: object requires documentation | ||
| 36 | Measurement &1 cannot be converted to statistical key figure &2 | The short text describes the object sufficiently | ||
| 37 | No statistical key figure was found | Space: object requires documentation | ||
| 38 | Statistical key figure: &1 | The short text describes the object sufficiently | ||
| 39 | Statistical key figure &1 is not of type 'fixed value' | Space: object requires documentation | ||
| 40 | Enter a key date | The short text describes the object sufficiently | ||
| 41 | Amount determined for key date &1: &2 &3 | The short text describes the object sufficiently | ||
| 42 | Object is used in settlement rules (number: &1) | The short text describes the object sufficiently | ||
| 43 | &1 &2 &3 &4 | Space: object requires documentation |
History
| Last changed on/by | 20131127 | SAP | |
| SAP Release Created in | 200 |