SAP ABAP Message Class PPELUI (Messages of iPPE Workbench Express)
Basic Data
Hierarchy
☛
EA-IPPE (Software Component) SAP iPPE
⤷ AP-PPE (Application Component) Integrated Product and Process Engineering
⤷ CPPELUI (Package) iPPE: Interface for Maintaining Production Versions
⤷ AP-PPE (Application Component) Integrated Product and Process Engineering
⤷ CPPELUI (Package) iPPE: Interface for Maintaining Production Versions
Attributes
Message class | PPELUI | |
Short Description | Messages of iPPE Workbench Express | |
Changed On | 20040316 | |
Last Changed At | 094307 |
Messages
# | Message | Message Short Text | Documentation status | Authorization check |
---|---|---|---|---|
1 | 000 | The change number &1 has no date validity | Space: object requires documentation | |
2 | 001 | Change number &1 does not exist | The short text describes the object sufficiently | |
3 | 002 | &1 &2 were loaded and updated | Space: object requires documentation | |
4 | 003 | The selected &1 &2 is not consistent with the current user profile | Space: object requires documentation | |
5 | 004 | &1 &2 does not exist | The short text describes the object sufficiently | |
6 | 005 | &1 &2 already exists | The short text describes the object sufficiently | |
7 | 006 | The copied &1 contain errors | Space: object requires documentation | |
8 | 007 | The routing data are incomplete | Space: object requires documentation | |
9 | 008 | Inconsistent &1 were removed from the results | Space: object requires documentation | |
10 | 009 | The product structure cannot be used | Space: object requires documentation | |
11 | 010 | The process structure cannot be used | Space: object requires documentation | |
12 | 011 | Name is invalid in iPPE Workbench Express | Space: object requires documentation | |
13 | 012 | &1 cannot be reset | Space: object requires documentation | |
14 | 013 | The function cannot be executed for the selected object | Space: object requires documentation | |
15 | 014 | Incorrect data still found. Check your entries | Space: object requires documentation | |
16 | 015 | Inconsistent changes made at same object | Space: object requires documentation | |
17 | 016 | First select a line | Space: object requires documentation | |
18 | 017 | Internal Error | Space: object requires documentation | |
19 | 018 | You can only switch to display mode after you have saved | Space: object requires documentation | |
20 | 019 | The &1 has already been loaded | Space: object requires documentation | |
21 | 020 | The Customizing for the profile or the user settings contain errors | Space: object requires documentation | |
22 | 021 | The product decomposition could not be determined | Space: object requires documentation | |
23 | 022 | Error during creation. Check your entries | Space: object requires documentation | |
24 | 023 | An error has occurred in the iPPE Workbench Professional | Space: object requires documentation | |
25 | 024 | The changes were saved successfully | Space: object requires documentation | |
26 | 025 | Switch to change mode first | Space: object requires documentation | |
27 | 026 | You cannot select a blank row | Space: object requires documentation | |
28 | 027 | Processing was terminated | Space: object requires documentation | |
29 | 028 | The product structure cannot be configured | Space: object requires documentation | |
30 | 029 | Specify a class | Space: object requires documentation | |
31 | 030 | Enter a class type | Space: object requires documentation | |
32 | 031 | The selected combination of class and class type is invalid | Space: object requires documentation | |
33 | 032 | Maintenance was cancelled | Space: object requires documentation | |
34 | 033 | The selected combination of class and class type was copied | Space: object requires documentation | |
35 | 034 | The selected &1 was included in the worklist | Space: object requires documentation | |
36 | 035 | You cannot move the row in the selected direction | Space: object requires documentation | |
37 | 036 | The external key of &1 is incomplete | Space: object requires documentation | |
38 | 037 | No operation specified | Space: object requires documentation | |
39 | 038 | No activity specified | Space: object requires documentation | |
40 | 039 | No mode was specified | Space: object requires documentation | |
41 | 040 | Neither a &1 or variant were specified | Space: object requires documentation | |
42 | 041 | No routing header was specified | Space: object requires documentation | |
43 | 042 | You can make no further changes when renaming | Space: object requires documentation | |
44 | 043 | No variant name was specified | Space: object requires documentation | |
45 | 044 | No resource name was specified | Space: object requires documentation | |
46 | 045 | All data has been updated | Space: object requires documentation | |
47 | 046 | The standard configuration will be stored when you next save | Space: object requires documentation | |
48 | 047 | The variant &1 has no standard configuration | Space: object requires documentation | |
49 | 048 | Only existing operations can be used | Space: object requires documentation | |
50 | 049 | Layout size of tables was restored | Space: object requires documentation | |
51 | 050 | The last changes made were reset | Space: object requires documentation | |
52 | 051 | Entry is incomplete | Space: object requires documentation | |
53 | 052 | No primary resource was specified | Space: object requires documentation | |
54 | 053 | All available details are displayed | Space: object requires documentation | |
55 | 054 | All available details hidden | Space: object requires documentation | |
56 | 055 | The required entry field &1 is still blank | Space: object requires documentation | |
57 | 056 | Only one object can be renamed for each maintenance step | Space: object requires documentation | |
58 | 057 | The end date &1 comes before the start date &2 | Space: object requires documentation | |
59 | 058 | Filter activated | Space: object requires documentation | |
60 | 059 | Filter deactivated | Space: object requires documentation | |
61 | 060 | The change number &1 is not active | Space: object requires documentation | |
62 | 061 | Change no. &1 is not valid for maintaining the product or process struct. | Space: object requires documentation | |
63 | 062 | The change number &1 was activated for maintenance | Space: object requires documentation | |
64 | 063 | The change number was reset for maintenance | Space: object requires documentation | |
65 | 064 | Primary resource is required to view/maintain secondary resources | Space: object requires documentation | |
66 | 065 | The indicator for fixed quantity requires an entry for the quantity | Space: object requires documentation | |
67 | 066 | The quantity and unit of measure must always be specified together | Space: object requires documentation | |
68 | 067 | Specify a new routing header | Space: object requires documentation | |
69 | 068 | You cannot remove descriptions | Space: object requires documentation | |
70 | 069 | The entry is invalid for &1 | Space: object requires documentation | |
71 | 070 | &1 &2 &3 &4 | Space: object requires documentation | |
72 | 071 | Configurable &1 cannot be used | Space: object requires documentation | |
73 | 072 | Only existing activities can be used | Space: object requires documentation | |
74 | 073 | No changes were made | Space: object requires documentation | |
75 | 074 | The user setting were saved | Space: object requires documentation | |
76 | 075 | Cost profiles can only be used for SNP routings | Space: object requires documentation | |
77 | 076 | Cost profile &1 does not exist | Space: object requires documentation | |
78 | 077 | No values for this selection | Space: object requires documentation | |
79 | 078 | The routing contains no objects | Space: object requires documentation | |
80 | 079 | No components have been maintained | Space: object requires documentation | |
81 | 080 | The &1 is locked by another user | Space: object requires documentation | |
82 | 081 | You cannot maintain object dependencies for routing &1 | Space: object requires documentation | |
83 | 082 | No routing was maintained | Space: object requires documentation | |
84 | 083 | No &1 was selected | Space: object requires documentation | |
85 | 084 | The selected function requires a routing of type &1 | Space: object requires documentation | |
86 | 085 | Save your entries first | Space: object requires documentation | |
87 | 086 | The name &1 does not specify a routing header | Space: object requires documentation | |
88 | 087 | The specified name &1 for the routing header cannot be used | Space: object requires documentation | |
89 | 088 | &1 cannot be used | Space: object requires documentation | |
90 | 089 | An error occurred when copying | Space: object requires documentation | |
91 | 090 | &1 &2 does not exist | Space: object requires documentation | |
92 | 091 | Choose a copy option | Space: object requires documentation |
History
Last changed on/by | 20040316 | SAP | |
SAP Release Created in | 200 |