SAP ABAP Message Class OM Message Number 449 (Material ledger for valuation area & successfully activated)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       MB0C (Package) Customizing R/3 inventory management
Attribute
Message class OM  
Short Description Customizing: Materials Management    
Message Number 449  
Documentation status      
Authorization check Error Message      
Changed On    
Message Text
Material ledger for valuation area & successfully activated
Help Document

Diagnosis

You have indicated that the material ledger is to be active for one or more valuation areas.

Data has to be converted for these valuation areas after activation. This ensures consistent valuation data and the material ledger is flagged internally as being in production.

System Response

You can only go into production with Materials Management in these valuation areas once you have converted the data after activation of the material ledger.

Procedure

  1. Note the valuation areas for which you have flagged the material ledger as being active.
  2. Print out this system message.
  3. Save your Customizing settings.
  4. Convert the data for the material ledger.

Two different scenarios must be distinguished:

  • You wish to activate the material ledger in a system that has no live data and then transport the Customizing settings to a live system.
    In this case you have to ensure that data for the production startup for the material legder is converted before you start work with Materials Management.
  • You wish to activate the material ledger in a system that has live data.
    Immediately after you have activated the material ledger, you must convert the data.
    Choose Controlling -> Accounting -> Actual costing/ Material ledger -> Utilities -> Production startup.

History
Last changed on/by 20110908  SAP 
SAP Release Created in