SAP ABAP Message Class MM Message Number 171 (Lot size dependent in-house production time will be reset)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       MG (Package) Application development R/3 material master prior to 3.0
Attribute
Message class MM  
Short Description Messages for material master maintenance and Customizing    
Message Number 171  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20110908   
Message Text
Lot size dependent in-house production time will be reset
Help Document

Diagnosis

You have specified a lot size independent in-house production time. A lot size dependent in-house production time was previously assigned to the material.

System Response

The system cancels the lot size dependent in-house production time.

Procedure

History
Last changed on/by 20110908  SAP 
SAP Release Created in