SAP ABAP Message Class KY Message Number 244 (Report & cannot be executed)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ KC (Package) Cost Accounting Controlling EIS
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ KC (Package) Cost Accounting Controlling EIS
Attribute
Message class | KY | ||
Short Description | Messages for SAP-EIS: Presentation | ||
Message Number | 244 | ||
Documentation status | |||
Authorization check Error Message | |||
Changed On |
Message Text
Report & cannot be executed
Help Document
Diagnosis
After a certain change, report can no longer be changed. The possible changes are as follows:
Form
Global variable (e.g. variable was changed from optional entry to compulsory entry)
Key-figures (e.g which the report uses were deleted)
Characteristics (e.g. all the characteristics which the report uses were deleted)
The system tried to adjust the reports affected as far as possible. However, a change was made which requires that the report be recopied to the report portfolio.
System Response
Procedure
You should delete report . If you want to have a report in the report portfolio which corresponds to this report, you need to copy it to the report portfolio again.
History
Last changed on/by | 19980529 | SAP | |
SAP Release Created in |