SAP ABAP Message Class FTVV_MESSAGES (Reporting Financial Assets Management)
Basic Data
Hierarchy
☛
EA-FINSERV (Software Component) SAP Enterprise Extension Financial Services
⤷
FIN-FSCM-TRM (Application Component) Treasury and Risk Management
⤷
FTVV (Package) TR - Objects from FVV in both Loans/Securities areas

⤷

⤷

Attributes
Message class | ![]() |
FTVV_MESSAGES |
Short Description | ![]() |
Reporting Financial Assets Management |
Changed On | ![]() |
20130531 |
Last Changed At | ![]() |
105616 |
Messages
# | Message | Message Short Text | Documentation status | Authorization check |
---|---|---|---|---|
1 | ![]() |
********** General messages *********************** | ||
2 | ![]() |
Loan no. &1 does not exist in company code &2 | Space: object requires documentation | |
3 | ![]() |
Loan no. &1 is already available in company code &2 | Space: object requires documentation | |
4 | ![]() |
Data inconsistency in table & (key missing) | ||
5 | ![]() |
Position the cursor on a valid entry | Space: object requires documentation | |
6 | ![]() |
Choose a processing option | Space: object requires documentation | |
7 | ![]() |
No loan partner exists for loan no. & | ||
8 | ![]() |
Loan no. is not between & and & | ||
9 | ![]() |
Loan number not numerical | Space: object requires documentation | |
10 | ![]() |
No change made to loan no. & | ||
11 | ![]() |
Product type &1 is not permitted for product category &2 | Space: object requires documentation | |
12 | ![]() |
Product type & is not a loan product type | ||
13 | ![]() |
No data entered | ||
14 | ![]() |
Select one entry only | Space: object requires documentation | |
15 | ![]() |
For prod. type &1, number range interval &2 entered does not exist | Space: object requires documentation | |
16 | ![]() |
Error during number assignment | ||
17 | ![]() |
Internal number assignment to be used for product type &1 | ||
18 | ![]() |
Loan no. &1 is in company code &2 | ||
19 | ![]() |
Borrower &1 does not exist | Space: object requires documentation | |
20 | ![]() |
Loan no. &1 belongs to product category &2 | Space: object requires documentation | |
21 | ![]() |
Enter data in full | Space: object requires documentation | |
22 | ![]() |
Create main loan partner | Space: object requires documentation | |
23 | ![]() |
Create a collateral object for the loan | Space: object requires documentation | |
24 | ![]() |
Create encumbrance on real estate for loan on | Space: object requires documentation | |
25 | ![]() |
Create a condition | Space: object requires documentation | |
26 | ![]() |
Enter valid OK-code | Space: object requires documentation | |
27 | ![]() |
Check run was terminated - no data saved | ||
28 | ![]() |
Check run was terminated | ||
29 | ![]() |
Status was changed - Check run will be carried out | ||
30 | ![]() |
You are not authorized for this action | ||
31 | ![]() |
Error during creation in table &1 | ||
32 | ![]() |
Encumbr.on real estate and objects have to be copied together | ||
33 | ![]() |
Date is in the future | ||
34 | ![]() |
Enter loan number | Space: object requires documentation | |
35 | ![]() |
Error in number assignment for object &1, group &2, sy-subrc = &3 | Space: object requires documentation | |
36 | ![]() |
No partner was selected | ||
37 | ![]() |
The loan number assigned is already in the critical area | ||
38 | ![]() |
Loan cannot be created. Last number has been assigned | ||
39 | ![]() |
No loan found | ||
40 | ![]() |
Partner and role type do not match up (natural or legal person) | ||
41 | ![]() |
&1 with role &2 already exists | ||
42 | ![]() |
No main loan partner exists for investment no. &1 | Space: object requires documentation | |
43 | ![]() |
Create main loan partner first | Space: object requires documentation | |
44 | ![]() |
No object exists for loan no. &1 | ||
45 | ![]() |
No collateral exists for loan no. &1 | ||
46 | ![]() |
Define field selection | Space: object requires documentation | |
47 | ![]() |
Loan has not been released, data will be saved | ||
48 | ![]() |
Loan no. & has not yet been released | ||
49 | ![]() |
Object no. & for loan has not been released | ||
50 | ![]() |
Partner & for loan has not been released | ||
51 | ![]() |
The loan number assigned is already in the critical area | ||
52 | ![]() |
Number range object &1 with interval &2 is not defined | Space: object requires documentation | |
53 | ![]() |
Number range object &1 with interval &2 has to be internal | ||
54 | ![]() |
Loan number &1 not found in company code &2 | ||
55 | ![]() |
Internal error &1 when changing loan &2 &3 | ||
56 | ![]() |
Acct assignment ref. do not exist, posting is not possible | ||
57 | ![]() |
Acct assignment reference could not be determined | Space: object requires documentation | |
58 | ![]() |
Maintain reason for restraint on disposal | Space: object requires documentation | |
59 | ![]() |
Contracts belong to different product types | Space: object requires documentation | |
60 | ![]() |
Sample loan does not belong to product type &1 | ||
61 | ![]() |
No number range for sample loans is assigned to the product type &1 | ||
62 | ![]() |
Sample loan no. &1 not available | Space: object requires documentation | |
63 | ![]() |
A sample loan must be created without any sample references | ||
64 | ![]() |
No sample loans exist for CoCd &1 and product category &2 | Space: object requires documentation | |
65 | ![]() |
Manual rollover processing is not possible | ||
66 | ![]() |
Loan has been entered in the rollover file & & & & | ||
67 | ![]() |
Partner &1 is not assigned to contract &2 | ||
68 | ![]() |
Application date cannot be after approval date | ||
69 | ![]() |
Approval date cannot be after commitment date | ||
70 | ![]() |
Error &1 whilst inserting a record for subsidies (&2) | ||
71 | ![]() |
Error &1 whilst changing a record for subsidies (&2) | ||
72 | ![]() |
Error &1 whilst deleting a record for subsidies (&2) | ||
73 | ![]() |
Error &1 whilst locking the table for subsidies | ||
74 | ![]() |
Table for subsidies locked by &1 | ||
75 | ![]() |
Select an entry | Space: object requires documentation | |
76 | ![]() |
&1 is not maintained as &2 | ||
77 | ![]() |
You have no authorization for this loan | ||
78 | ![]() |
No records with PN / available in conditions | ||
79 | ![]() |
Record is &1 | ||
80 | ![]() |
Enter a movement type | Space: object requires documentation | |
81 | ![]() |
Warning: Loan repaid on schedule | Space: object requires documentation | |
82 | ![]() |
Loan is completely settled | Space: object requires documentation | |
83 | ![]() |
Amount cannot be larger than commitment capital (&1 &2) | ||
84 | ![]() |
Data for account assignment reference determination not maintained | Space: object requires documentation | |
85 | ![]() |
Neither planned nor actual principle selected | Space: object requires documentation | |
86 | ![]() |
Disbursement not possible. Create interest conditions first | Space: object requires documentation | |
87 | ![]() |
You are not authorized to maintain the regulatory reporting data | ||
88 | ![]() |
Customer number of main loan partner cannot be determined | Space: object requires documentation | |
89 | ![]() |
No withholding amount for incidental costs with alternative payee | ||
90 | ![]() |
Conversion &1 &2 on &3 not possible | ||
91 | ![]() |
Conversion ratio from currency &1 to &2 on &3 is not maintained | ||
92 | ![]() |
Original doc. &1 for residual item &2 cannot be read or is invalid | Space: object requires documentation | |
93 | ![]() |
Maintain the name of flow type &1 in the configuration menu. | Space: object requires documentation | |
94 | ![]() |
Product type &1 not maintained in the configuration menu | Space: object requires documentation | |
95 | ![]() |
Product type &1 not maintained for company code &2 | Space: object requires documentation | |
96 | ![]() |
Release object &1 not defined in the configuration menu | Space: object requires documentation | |
97 | ![]() |
Maintain usage type &1 for rental unit in configuration menu | Space: object requires documentation | |
98 | ![]() |
Activity category must not be maintained for this product type | Space: object requires documentation | |
99 | ![]() |
Status must not be maintained for this product type | Space: object requires documentation | |
100 | ![]() |
Condition change for loan &1 was saved | ||
101 | ![]() |
Transaction code &1 not entered in table TDA10 | Space: object requires documentation | |
102 | ![]() |
Entry & & & is missing in table TDA11 | ||
103 | ![]() |
Table &1 not maintained | Space: object requires documentation | |
104 | ![]() |
General ledger account from table T037S unknown | ||
105 | ![]() |
No entry for business type &1 exists in table &2 | ||
106 | ![]() |
& & saved | ||
107 | ![]() |
& & was created in company code & | ||
108 | ![]() |
Error in management of locking objects | ||
109 | ![]() |
Contract no. & is blocked by user & at present | ||
110 | ![]() |
Order no. & created for contract no. & | ||
111 | ![]() |
& no. & was reversed or deleted | ||
112 | ![]() |
Reactivation of & no. & saved | ||
113 | ![]() |
Order settlement for contract no. & was saved | ||
114 | ![]() |
Disbursement was posted and saved | ||
115 | ![]() |
No entry for product type & with ref. acct. ass. & in tab. & | ||
116 | ![]() |
Flow type &1 not permitted for this transaction | ||
117 | ![]() |
Reservation no. & was activated | ||
118 | ![]() |
Payment block was set | ||
119 | ![]() |
$ flows for an activity will be updated | Space: object requires documentation | |
120 | ![]() |
Invalid selection | ||
121 | ![]() |
No bank details ID found | Space: object requires documentation | |
122 | ![]() |
No bank details ID selected | Space: object requires documentation | |
123 | ![]() |
Partner not found | ||
124 | ![]() |
Incoming payment created | ||
125 | ![]() |
Check bank details ID | Space: object requires documentation | |
126 | ![]() |
Customer does not exist | ||
127 | ![]() |
Account is incorrect | Space: object requires documentation | |
128 | ![]() |
Chart of accounts not found | ||
129 | ![]() |
Company code not found | Space: object requires documentation | |
130 | ![]() |
Account not found | ||
131 | ![]() |
Customer number not found | ||
132 | ![]() |
Acct assignment not found | ||
133 | ![]() |
An incoming payment has already been created | Space: object requires documentation | |
134 | ![]() |
Status for product type & not defined | Space: object requires documentation | |
135 | ![]() |
Impermissible control of withholding indicator in incid.expenses | ||
136 | ![]() |
No interest calculation type in LC or FC selected | Space: object requires documentation | |
137 | ![]() |
Bank details ID not yet maintained | Space: object requires documentation | |
138 | ![]() |
Select a role category | Space: object requires documentation | |
139 | ![]() |
Pmnt method &1 is for incoming payments - maintain bank details ID | Space: object requires documentation | |
140 | ![]() |
Net disbursement amount is negative. Correct this. | Space: object requires documentation | |
141 | ![]() |
No display/selection of loans for which there is no authorization | Space: object requires documentation | |
142 | ![]() |
Prio.level 99 requires flow type with cancel.IP-ID 03 or 04 | ||
143 | ![]() |
Transaction was cancelled | ||
144 | ![]() |
'Date from' cannot be after 'Date to' | ||
145 | ![]() |
Internal error. Repeat your action | Space: object requires documentation | |
146 | ![]() |
Internal error; table & unknown | ||
147 | ![]() |
Table & could not be & | ||
148 | ![]() |
No items to pay interest on were selected | ||
149 | ![]() |
Conditions will be displayed | ||
150 | ![]() |
Define a dunning block for posting to a customer account | Space: object requires documentation | |
151 | ![]() |
********* Status error messages ****************************** | ||
152 | ![]() |
Loan & not in status & | ||
153 | ![]() |
Select a new status | Space: object requires documentation | |
154 | ![]() |
The & has a delete flag | ||
155 | ![]() |
The & has a delete flag | ||
156 | ![]() |
The necessary subsequent status is not possible | ||
157 | ![]() |
Loan & transferred to status & | ||
158 | ![]() |
Status & does not exist | ||
159 | ![]() |
Status &1 does not belong to loans given | ||
160 | ![]() |
Release records to be released | ||
161 | ![]() |
Loan cannot be overredeemed on &1 for capital available on &2 | Space: object requires documentation | |
162 | ![]() |
Application has already been approved - only display function possible | Space: object requires documentation | |
163 | ![]() |
Reductions can only be entered in contract status | ||
164 | ![]() |
Function is not permitted for the product type & | ||
165 | ![]() |
The non-acceptance reason is not allowed | ||
166 | ![]() |
The loan is no longer active. Function not possible | Space: object requires documentation | |
167 | ![]() |
The loan is flagged for deletion | ||
168 | ![]() |
Offers/Contracts already exist for this application | ||
169 | ![]() |
Loan & is still active | ||
170 | ![]() |
No customer is assigned to the main loan partner / issuer | Space: object requires documentation | |
171 | ![]() |
Check calculation basis (&1) for repayment | Space: object requires documentation | |
172 | ![]() |
Data is missing for repayment clearing | ||
173 | ![]() |
Data is missing for interest adjustment | ||
174 | ![]() |
Uns. repayment more than/equal to rem. cap. & => & | ||
175 | ![]() |
Immediate settlement selected in spite of settlement item | ||
176 | ![]() |
Commitment capital is zero | ||
177 | ![]() |
Payment method &1 not permitted for this partner | Space: object requires documentation | |
178 | ![]() |
Payment method &: Bank details required for the partner | ||
179 | ![]() |
No bank details with direct debit authorization exist for partner | ||
180 | ![]() |
No direct debit authorization exists for bank details & | ||
181 | ![]() |
The main loan partner does not have a customer acct: Posting not possible | Space: object requires documentation | |
182 | ![]() |
Payment method &1 is not available in this country | Space: object requires documentation | |
183 | ![]() |
No customer is assigned to the partner | Space: object requires documentation | |
184 | ![]() |
Partners who are not main loan partners require a payment method | Space: object requires documentation | |
185 | ![]() |
Old account assignment reference &1 will be replaced by &2 | Space: object requires documentation | |
186 | ![]() |
Cash flow could not be generated: No customer account available | Space: object requires documentation | |
187 | ![]() |
Client &: posting cont. & in flow type & not allowed (change customizing) | ||
188 | ![]() |
Client &: posting control & in cond. & not allowed (change customizing) | ||
189 | ![]() |
Client &, condition group &: condition type & does not exist | ||
190 | ![]() |
Client &, CoCd &, contract &: condition type & does not exist | ||
191 | ![]() |
Client &1, CoCd &2, contract &3, cond.type &: posting control not allowed | ||
192 | ![]() |
Date is before order number &1 (reverse/delete this first) | Space: object requires documentation | |
193 | ![]() |
Calculation date is before acc./def. posting of &1 (reverse first) | Space: object requires documentation | |
194 | ![]() |
No discount was calculated | ||
195 | ![]() |
Functions for capital reductions are not permitted | Space: object requires documentation | |
196 | ![]() |
Loan has already been repaid - only display function possible | Space: object requires documentation | |
197 | ![]() |
The loan is not yet disbursed | ||
198 | ![]() |
Condition cannot be deleted/deactivated | ||
199 | ![]() |
Rollover exists - no changes which affect the capital are permitted | Space: object requires documentation | |
200 | ![]() |
Condition header is already inactive | Space: object requires documentation | |
201 | ![]() |
Enter an amount | Space: object requires documentation | |
202 | ![]() |
Term end is before term start | ||
203 | ![]() |
No conditions exist for & no. & | ||
204 | ![]() |
Condition with contract no. & already exists | ||
205 | ![]() |
Fixed until date/notice date of lender < Eff. from date (cond. header) | Space: object requires documentation | |
206 | ![]() |
Error in condition table | ||
207 | ![]() |
Maintain table for flow types | Space: object requires documentation | |
208 | ![]() |
Product type is assigned to the wrong condition group | ||
209 | ![]() |
Different currency for commitment capital and payment amount | ||
210 | ![]() |
Commitment capital is less than amount already disbursed | ||
211 | ![]() |
Up to now, & offers exist | ||
212 | ![]() |
Condition header and corresponding items were deleted | ||
213 | ![]() |
Offer no. & transferred to contract | ||
214 | ![]() |
No other offers exist | ||
215 | ![]() |
Entry was deleted. Offers were renumbered | Space: object requires documentation | |
216 | ![]() |
Error during deletion of offer | ||
217 | ![]() |
Different 'Fixed From' dates in the offers | ||
218 | ![]() |
Process current offer first | Space: object requires documentation | |
219 | ![]() |
Enter data for 'end of term' or 'fixed until' date | Space: object requires documentation | |
220 | ![]() |
Minimum amount in assignments may not be larger than commitment capital | Space: object requires documentation | |
221 | ![]() |
Calculation not possible | ||
222 | ![]() |
Calculation not possible | ||
223 | ![]() |
Enter settlement date | ||
224 | ![]() |
The maximum nominal amount is & & | ||
225 | ![]() |
Enter an effective interest method | Space: object requires documentation | |
226 | ![]() |
Enter an interest method | Space: object requires documentation | |
227 | ![]() |
No condition 'Repayment' is assigned to the business type & | ||
228 | ![]() |
No historical rates available | ||
229 | ![]() |
No historical condition items exist | ||
230 | ![]() |
There are no changes which are relevant for effective interest | ||
231 | ![]() |
Maintain type of discount witholding | Space: object requires documentation | |
232 | ![]() |
No offer selected | ||
233 | ![]() |
'Valid from' (&) is before 'Fixed to' (&) | ||
234 | ![]() |
Capital reduction not possible | ||
235 | ![]() |
The maximum deduction amount is & & | ||
236 | ![]() |
Not possible to delete entry | ||
237 | ![]() |
No offers available | ||
238 | ![]() |
Date 'Offer until' before 'Offer on' | ||
239 | ![]() |
Date 'Reserved until' before 'Reserved on' | ||
240 | ![]() |
Amount cannot be larger than commitment capital (&1 &2) | ||
241 | ![]() |
Enter a condition type | Space: object requires documentation | |
242 | ![]() |
A deduction has already been made on & | ||
243 | ![]() |
Date is after current date & | ||
244 | ![]() |
Select an offer condition | Space: object requires documentation | |
245 | ![]() |
Date is before fixed period end (&) | ||
246 | ![]() |
Flow type & already exists on & | ||
247 | ![]() |
& later than & | ||
248 | ![]() |
& earlier than & | ||
249 | ![]() |
& is after current date | ||
250 | ![]() |
Function will be installed at a later date | ||
251 | ![]() |
*************** Objects **************************** | ||
252 | ![]() |
At least 1 object must be assigned | ||
253 | ![]() |
Assign object to mortgage loan | Space: object requires documentation | |
254 | ![]() |
The selected object was transferred | ||
255 | ![]() |
Address parity in several objects | ||
256 | ![]() |
Create a land register and then save the object | Space: object requires documentation | |
257 | ![]() |
Object &1 was &2 | Space: object requires documentation | |
258 | ![]() |
Object number & was deleted | ||
259 | ![]() |
Enter a land register for the object first | Space: object requires documentation | |
260 | ![]() |
Enter a valid object number in the field <Joint liability for> | Space: object requires documentation | |
261 | ![]() |
Select an object class before creating an encumbrance (lien) | Space: object requires documentation | |
262 | ![]() |
Object & is already assigned to loan | ||
263 | ![]() |
Complete the object data first | Space: object requires documentation | |
264 | ![]() |
Object &1 cannot be deleted, as real estate encumbrances still exist. | Space: object requires documentation | |
265 | ![]() |
Object class cannot be changed since reference object | ||
266 | ![]() |
Reference object & is not a main or additional object | ||
267 | ![]() |
Object number & not available | ||
268 | ![]() |
Only create one main object | Space: object requires documentation | |
269 | ![]() |
Specify the main object | Space: object requires documentation | |
270 | ![]() |
Specify search criteria | Space: object requires documentation | |
271 | ![]() |
****************** Object plausibilities *********** | ||
272 | ![]() |
Create an object address | Space: object requires documentation | |
273 | ![]() |
Complete the land register data | Space: object requires documentation | |
274 | ![]() |
No changes were made to object | Space: object requires documentation | |
275 | ![]() |
Save the object before branching to the real estate register | Space: object requires documentation | |
276 | ![]() |
Property with number & already exists | ||
277 | ![]() |
Object has not yet been released | ||
278 | ![]() |
More than three entries in the real estate register | Space: object requires documentation | |
279 | ![]() |
Master number assignment is not clear and unmistakeable | ||
280 | ![]() |
Enter a number for the real estate register | Space: object requires documentation | |
281 | ![]() |
"Calculation from" and "Calculation to" have to be entered | ||
282 | ![]() |
Object no. & is at present blocked by user & | ||
283 | ![]() |
Object & is already being processed | ||
284 | ![]() |
It is not possible to branch to land register management | ||
285 | ![]() |
Encumbrance on real estate is already assigned | ||
286 | ![]() |
You will leave the object copy and return to the original object | ||
287 | ![]() |
An object is already assigned to the loan | ||
288 | ![]() |
Allocation to object &1 already completed | Space: object requires documentation | |
289 | ![]() |
Object cannot be deleted, select "Exit assignment" | Space: object requires documentation | |
290 | ![]() |
Commitment capital is too low | Space: object requires documentation | |
291 | ![]() |
************** Disbursements / Postings *********************** | ||
292 | ![]() |
Disbursement obligation must not be negative | ||
293 | ![]() |
Update VDBEKI document & with field RZEBEL & incorrect | ||
294 | ![]() |
No disbursement possible (customer account missing for main loan partner) | Space: object requires documentation | |
295 | ![]() |
No disbursement possible (contract status & does not allow posting) | ||
296 | ![]() |
Name not maintained for country &1 in language &2 | Space: object requires documentation | |
297 | ![]() |
Enter a "fixed-from" date | Space: object requires documentation | |
298 | ![]() |
No order exists for contract &1 that can be changed | Space: object requires documentation | |
299 | ![]() |
Contract data can only be changed in contract processing | Space: object requires documentation | |
300 | ![]() |
First, select another contract from the finance project for postings | Space: object requires documentation | |
301 | ![]() |
First, select another contract for the borrower for postings | Space: object requires documentation | |
302 | ![]() |
Specify a bank identification number | Space: object requires documentation | |
303 | ![]() |
Enter a bank account number | Space: object requires documentation | |
304 | ![]() |
Enter a bank country | Space: object requires documentation | |
305 | ![]() |
Enter a country key | Space: object requires documentation | |
306 | ![]() |
Enter at least city and name | Space: object requires documentation | |
307 | ![]() |
Enter an address or delete the bank details | Space: object requires documentation | |
308 | ![]() |
Bank number or bank account incorrect in form | ||
309 | ![]() |
Payment method not intended for disbursements | ||
310 | ![]() |
Disbursement with earlier or same date already exists | ||
311 | ![]() |
Drawing amount is larger than payment amount | ||
312 | ![]() |
Payment amount is not identical to disposal amount | ||
313 | ![]() |
Payment amount is already fully distributed | ||
314 | ![]() |
No drawings available | ||
315 | ![]() |
No disbursements available yet for loan & | ||
316 | ![]() |
Only & & can still be disbursed | ||
317 | ![]() |
No disbursements available yet | ||
318 | ![]() |
Payment amount is too high | ||
319 | ![]() |
The loan & is already fully disbursed | ||
320 | ![]() |
The loan is already partly disbursed | ||
321 | ![]() |
The flow type is not a disbursement | ||
322 | ![]() |
Table TZB0B does not contain an entry for disbursements | ||
323 | ![]() |
Enter a flow type | Space: object requires documentation | |
324 | ![]() |
Enter a date | Space: object requires documentation | |
325 | ![]() |
Enter a buying rate or nominal amount | Space: object requires documentation | |
326 | ![]() |
No disbursements to be released for loan & | ||
327 | ![]() |
Enter either only the amount or only the percentage rate | Space: object requires documentation | |
328 | ![]() |
Enter the amount or the percentage rate | Space: object requires documentation | |
329 | ![]() |
Enter the base amount and percentage rate | Space: object requires documentation | |
330 | ![]() |
Payment date or interest value date is before current date | ||
331 | ![]() |
Posted disbursements cannot be & | ||
332 | ![]() |
Enter bank data | Space: object requires documentation | |
333 | ![]() |
No bank data available | ||
334 | ![]() |
Bank data not found | ||
335 | ![]() |
Local currency is identical to currency of payment amount | Space: object requires documentation | |
336 | ![]() |
All disbursements already posted; only display function possible | ||
337 | ![]() |
Single payment is not planned for the payment method | ||
338 | ![]() |
Save data for the disbursement just changed first | Space: object requires documentation | |
339 | ![]() |
The settlement can only be changed during the last disbursement | ||
340 | ![]() |
Error during assignment of the activity number | ||
341 | ![]() |
For customer &, only the following payment methods are valid: $ | ||
342 | ![]() |
Only one disbursement exists | ||
343 | ![]() |
Only the last disbursement can be & | ||
344 | ![]() |
Payment methods for customer &1 not defined | Space: object requires documentation | |
345 | ![]() |
Enter a payment method and define a default value | Space: object requires documentation | |
346 | ![]() |
House bank & is not defined in company code & | ||
347 | ![]() |
Customer &1 has no bank details of the bank details ID &2 | Space: object requires documentation | |
348 | ![]() |
No customer is assigned to the loan yet | ||
349 | ![]() |
Flow type already exists | ||
350 | ![]() |
Line cannot be changed | ||
351 | ![]() |
* Partner messages | ||
352 | ![]() |
Main contract partner cannot be deleted | ||
353 | ![]() |
Enter a partner number | Space: object requires documentation | |
354 | ![]() |
Amounts already withheld upto & | ||
355 | ![]() |
At least one partner must be assigned to the activity | Space: object requires documentation | |
356 | ![]() |
Only one main contractual partner should exist | ||
357 | ![]() |
At least one main contractual partner must be available | ||
358 | ![]() |
Partner is not a & | ||
359 | ![]() |
Assign &1 to the file | Space: object requires documentation | |
360 | ![]() |
Assign &1 to the loan | Space: object requires documentation | |
361 | ![]() |
The partner number is not available as agent | ||
362 | ![]() |
The partner number is not available as issuer | ||
363 | ![]() |
Partner cannot be created as customer | ||
364 | ![]() |
Payment date is different to interest value date | ||
365 | ![]() |
Payment block & has to be manually reset | ||
366 | ![]() |
Condition-dependent items cannot be deleted. Execute using a waiver | Space: object requires documentation | |
367 | ![]() |
Disbursement will be deleted and contract will be saved | ||
368 | ![]() |
No role type was assigned to the business partner | Space: object requires documentation | |
369 | ![]() |
Select a role | Space: object requires documentation | |
370 | ![]() |
A & is already assigned to an order. | ||
371 | ![]() |
No historical partner data available | ||
372 | ![]() |
The file is not assigned to a & | ||
373 | ![]() |
Contract has already been created | Space: object requires documentation | |
374 | ![]() |
Partner data of person entitled to dispose was transferred | ||
375 | ![]() |
No partner data for persons entitled to dispose was transferred | ||
376 | ![]() |
Current field contents will be overwritten when a partner is selected | ||
377 | ![]() |
Current field contents will be overwritten when a disposition is selected | ||
378 | ![]() |
Data about the selected disposition was transferred | ||
379 | ![]() |
Customer & has open items | ||
380 | ![]() |
Dunning block not stored in table TZPAB | ||
381 | ![]() |
Disbursement not possible because order management is active | Space: object requires documentation | |
382 | ![]() |
Posted disbursements in the future exist for for contract & | Space: object requires documentation | |
383 | ![]() |
Business partner relationship does not exist | Space: object requires documentation | |
384 | ![]() |
Other loans have already been selected for posting charges | Space: object requires documentation | |
385 | ![]() |
No loan for posting charges exists for summarization level &1 | Space: object requires documentation | |
386 | ![]() |
Enter the counterparty first | Space: object requires documentation | |
387 | ![]() |
Payment methods must be entered for a payment request | Space: object requires documentation | |
388 | ![]() |
No payment details defined for partner &1 / currency &2 / direction &3 | Space: object requires documentation | |
389 | ![]() |
No payment details defined for product type & | Space: object requires documentation | |
390 | ![]() |
Payment details not found | Space: object requires documentation | |
391 | ![]() |
Withholding for flow &1 could not be created | Space: object requires documentation | |
392 | ![]() |
Partner & does not exist | Space: object requires documentation | |
393 | ![]() |
Partner &1 does not exist as a counterparty | Space: object requires documentation | |
394 | ![]() |
Enter a contract number | Space: object requires documentation | |
395 | ![]() |
Error during update | Space: object requires documentation | |
396 | ![]() |
Condition &1 has payment method &2 (instead of &3) | Space: object requires documentation | |
397 | ![]() |
You are not authorized for these loans | Space: object requires documentation | |
398 | ![]() |
No alternative payee allowed in document for customer &1 | Space: object requires documentation | |
399 | ![]() |
No finance project number defined: Dunning summarization FP not possible | Space: object requires documentation | |
400 | ![]() |
Postings resulting from the loan conditions already exist | Space: object requires documentation | |
401 | ![]() |
*************** Filed documents ********************* | ||
402 | ![]() |
File number does not exist: You can create a file number | Space: object requires documentation | |
403 | ![]() |
File ID not available | ||
404 | ![]() |
File ID already available | ||
405 | ![]() |
The file ID cannot be changed | ||
406 | ![]() |
File cannot be deleted since it is still being used | ||
407 | ![]() |
Enter file number | Space: object requires documentation | |
408 | ![]() |
You have no authorization for & & | Space: object requires documentation | |
409 | ![]() |
Enter a file number | Space: object requires documentation | |
410 | ![]() |
File number cannot be changed: Documents exist for the loan | Space: object requires documentation | |
411 | ![]() |
No file number for loan entered | ||
412 | ![]() |
The file entered for the loan is not available. Create a file | Space: object requires documentation | |
413 | ![]() |
Function no longer permitted due to withholding of overdue items | ||
414 | ![]() |
Admin.costs: Line &1: Amount input not possible, no annual gross yield | Space: object requires documentation | |
415 | ![]() |
Admin.costs: Line &1: Differing amount and percentage entries | Space: object requires documentation | |
416 | ![]() |
Dunning summarization for finance project; specify finance project number | Space: object requires documentation | |
417 | ![]() |
Only loan with dunning summarization level &: Activate posting of charges | Space: object requires documentation | |
418 | ![]() |
Enter the date of the dunning run | Space: object requires documentation | |
419 | ![]() |
Enter the dunning level | Space: object requires documentation | |
420 | ![]() |
Only enter one date and one dunning area | Space: object requires documentation | |
421 | ![]() |
Order cannot be reversed before doc.reversal: Order no. & already settled | Space: object requires documentation | |
422 | ![]() |
Settlement not possible: Order number &1 not yet posted | Space: object requires documentation | |
423 | ![]() |
No condition change possible, since a planned disbursement exists | Space: object requires documentation | |
424 | ![]() |
No waiver possible, since a planned disbursement exists | Space: object requires documentation | |
425 | ![]() |
Dunning summarization for finance project; specify finance project number | Space: object requires documentation | |
426 | ![]() |
Dunning summarization for borrower; partner number was not found | Space: object requires documentation | |
427 | ![]() |
Error occurred while determining the contract for posting charges | Space: object requires documentation | |
428 | ![]() |
Partner blocked by dunning run; relevant dunning data cannot be changed | Space: object requires documentation | |
429 | ![]() |
Change in investment type causes inconsistency in key figure R5/97-App.10 | Space: object requires documentation | |
430 | ![]() |
No entry found matching selection | Space: object requires documentation | |
431 | ![]() |
The documents are not available | ||
432 | ![]() |
No documents available in the file & | ||
433 | ![]() |
Status for product type not permitted | ||
434 | ![]() |
Product type not permitted in company code entered | ||
435 | ![]() |
The file ID to product type allocation is not permitted | ||
436 | ![]() |
No product type entered yet | ||
437 | ![]() |
No account assignment reference exists: Settlement not possible | Space: object requires documentation | |
438 | ![]() |
Order management not available for loans taken | Space: object requires documentation | |
439 | ![]() |
Rollover statistics not availabe for loans taken | Space: object requires documentation | |
440 | ![]() |
Capital amounts could not be determined | Space: object requires documentation | |
441 | ![]() |
Loan &1 already has 'active' status | Space: object requires documentation | |
442 | ![]() |
Commitment capital already disbursed. Purchase order no longer possible | Space: object requires documentation | |
443 | ![]() |
The planned records could not be regenerated | Space: object requires documentation | |
444 | ![]() |
Planned records were written during the simulation | Space: object requires documentation | |
445 | ![]() |
Payment to third party: Partner is main borrower | Space: object requires documentation | |
446 | ![]() |
Order number &1 already exists for the same day | Space: object requires documentation | |
447 | ![]() |
Enter the house bank and house bank account | Space: object requires documentation | |
448 | ![]() |
No direction is defined for flow type &1 (payment is not possible) | Space: object requires documentation | |
449 | ![]() |
No direction defined for flow type & (standing instructions not possible) | Space: object requires documentation | |
450 | ![]() |
House bank account changed based on entries in the payment details | Space: object requires documentation | |
451 | ![]() |
No changes have been made | ||
452 | ![]() |
All loans within an IPD level must be in the same currency | Space: object requires documentation | |
453 | ![]() |
No change - due to error in Customizing (condition type for reduction) | Space: object requires documentation | |
454 | ![]() |
Payment details taken from SI for partner &1 and flow type &2 | Space: object requires documentation | |
455 | ![]() |
The payment details have not been changed - please check | Space: object requires documentation | |
456 | ![]() |
Currency changed from &1 to &2: Please check the payment details | Space: object requires documentation | |
457 | ![]() |
No transaction found for this combination of status/mode/product category | Space: object requires documentation | |
458 | ![]() |
No conditions exist: Cash flow not possible | Space: object requires documentation | |
459 | ![]() |
Select the required order | Space: object requires documentation | |
460 | ![]() |
You do not have authorization for this activity for product category &1 | Space: object requires documentation | |
461 | ![]() |
Start of fixed period cannot be after & (posting exists) | Space: object requires documentation | |
462 | ![]() |
Disbursement & is deleted and the contract is saved | Space: object requires documentation | |
463 | ![]() |
A payoff already exists for &1 | Space: object requires documentation | |
464 | ![]() |
For contract 1& an entered payoff exists on &2 | Space: object requires documentation | |
465 | ![]() |
For contact &1 there is an activated or posted payoff on &2 | Space: object requires documentation | |
466 | ![]() |
An entered borrower change exists for contract & | Space: object requires documentation | |
467 | ![]() |
An executed borrower change exists for contract & | Space: object requires documentation | |
468 | ![]() |
&1 data records deleted (tables TWL1T and VZSTXT) | The short text describes the object sufficiently | |
469 | ![]() |
***** Regulatory reporting ***** | Space: object requires documentation | |
470 | ![]() |
Data not consistent for partner &1 | Space: object requires documentation | |
471 | ![]() |
Data saved | Space: object requires documentation | |
472 | ![]() |
Limit the selection to by partner or name | Space: object requires documentation | |
473 | ![]() |
Erros occured when saving data | Space: object requires documentation | |
474 | ![]() |
Data of sender &1 is missing | The short text describes the object sufficiently | |
475 | ![]() |
No manager loans selected | ||
476 | ![]() |
No multi-million credit selected | ||
477 | ![]() |
No loans selected | ||
478 | ![]() |
******** Continued: Disbursement ************ | Space: object requires documentation | |
479 | ![]() |
Gross amount is fixed, since only a maximum of &1 % can be disbursed | Space: object requires documentation | |
480 | ![]() |
Select an evaluation type | Space: object requires documentation | |
481 | ![]() |
Restrict the reporting period | Space: object requires documentation | |
482 | ![]() |
Delete the selection fields | Space: object requires documentation | |
483 | ![]() |
Enter the key date | Space: object requires documentation | |
484 | ![]() |
Flow type &1 is not permitted | Space: object requires documentation | |
485 | ![]() |
***************** Collateral value ************************** | ||
486 | ![]() |
& & saved | ||
487 | ![]() |
& & deleted | ||
488 | ![]() |
No changes made in & & | ||
489 | ![]() |
Collateral value & is fixed and cannot be deleted | The short text describes the object sufficiently | |
490 | ![]() |
Market value may not be smaller than the collateral value proposal | ||
491 | ![]() |
& & does not exist | The short text describes the object sufficiently | |
492 | ![]() |
Not everything can be included for building structural changes | Space: object requires documentation | |
493 | ![]() |
& & is currently locked by user & | The short text describes the object sufficiently | |
494 | ![]() |
Internal number assignment intended for &1 | The short text describes the object sufficiently | |
495 | ![]() |
Object number is only required during creation | The short text describes the object sufficiently | |
496 | ![]() |
Select an entry | Space: object requires documentation | |
497 | ![]() |
Deduction from & is more than proposal from & | ||
498 | ![]() |
Warning, sale value is larger than market value | ||
499 | ![]() |
Warning, object value is larger than market value | ||
500 | ![]() |
Warning, status can only be changed by altering the setting to 3 | ||
501 | ![]() |
Overflow in counter fields - Entry was reset - Check | The short text describes the object sufficiently | |
502 | ![]() |
You are not authorized to carry out activity &1 &2 | Space: object requires documentation | |
503 | ![]() |
User &1 who sets collateral val. cannot be last person &2 to make changes | The short text describes the object sufficiently | |
504 | ![]() |
Error whilst writing release information from &1 | Space: object requires documentation | |
505 | ![]() |
& & is not released | The short text describes the object sufficiently | |
506 | ![]() |
Save the object first | The short text describes the object sufficiently | |
507 | ![]() |
******************** General master data ******************************** | Space: object requires documentation | |
508 | ![]() |
The Customizing settings for assigning processing staff are incomplete | Space: object requires documentation | |
509 | ![]() |
In Customizing, activity type &1 is defined as not to be displayed | Space: object requires documentation | |
510 | ![]() |
Enter the commitment capital and the 'fixed from' date first | Space: object requires documentation | |
511 | ![]() |
******************** Interested parties ******************************** | ||
512 | ![]() |
Interested party not available yet | ||
513 | ![]() |
No partner data created or assigned | ||
514 | ![]() |
Interested party & & successfully & | ||
515 | ![]() |
Partner & already exists as interested party | ||
516 | ![]() |
No & selected | ||
517 | ![]() |
Interested party is & | ||
518 | ![]() |
Error whilst accessing table & | ||
519 | ![]() |
Error in partner data editing | ||
520 | ![]() |
& & is currently locked by user & | ||
521 | ![]() |
Resubmission sent successfully | ||
522 | ![]() |
Format error during entry for resubmission | ||
523 | ![]() |
Recipient does not exist | ||
524 | ![]() |
Resubmission not sent (docu. text available ?) | ||
525 | ![]() |
Mail text not available (-> Docu. = 'X') | ||
526 | ![]() |
&1 was cancelled externally | ||
527 | ![]() |
Interested party was already applicant | ||
528 | ![]() |
& successfully printed | ||
529 | ![]() |
Correspondence parameter error & | ||
530 | ![]() |
The rejection date is before the application date | ||
531 | ![]() |
Date for conditions reservation is before the application date | Space: object requires documentation | |
532 | ![]() |
Error in the partner data update | ||
533 | ![]() |
Error during memo pad update | Space: object requires documentation | |
534 | ![]() |
Purpose of loan is not maintained in Customizing | Space: object requires documentation | |
535 | ![]() |
************************* Credit standing checks *********************** | ||
536 | ![]() |
& successfully & | ||
537 | ![]() |
No form data available yet | ||
538 | ![]() |
No items for form header available | ||
539 | ![]() |
These form details are already fixed | ||
540 | ![]() |
Form category or form type incorrectly selected | ||
541 | ![]() |
Debit type &1 is not in table TDBL | Space: object requires documentation | |
542 | ![]() |
Debits exceed the income -> = 0 | Space: object requires documentation | |
543 | ![]() |
Set the forms already created first | Space: object requires documentation | |
544 | ![]() |
No income entered | ||
545 | ![]() |
No expenditure entered | ||
546 | ![]() |
You do not have the necessary authorization for this activity | Space: object requires documentation | |
547 | ![]() |
Invalid totals reference in table TDBL | ||
548 | ![]() |
Totals reference may not be smaller than the debit type | ||
549 | ![]() |
Reference to a charge type is required for mark-ups/discounts | Space: object requires documentation | |
550 | ![]() |
Division result too large | ||
551 | ![]() |
Form types not maintained | Space: object requires documentation | |
552 | ![]() |
No form selected | ||
553 | ![]() |
No form data exists | Space: object requires documentation | |
554 | ![]() |
Texts for form items not defined | Space: object requires documentation | |
555 | ![]() |
***************** Transfer postings *********************** | ||
556 | ![]() |
Transfer flow type is missing | ||
557 | ![]() |
Status not permitted for contract & | ||
558 | ![]() |
Currency not permitted for contract & | ||
559 | ![]() |
Transfer amnt > Disbursement obligation in loan & | ||
560 | ![]() |
The loan number & has been entered many times | ||
561 | ![]() |
The posting date is not permitted | ||
562 | ![]() |
Transfer larger than capital available in loan & | ||
563 | ![]() |
Old error message | ||
564 | ![]() |
Select a valid row | Space: object requires documentation | |
565 | ![]() |
Postings already exist for the loan & | ||
566 | ![]() |
Posting date after fixed period end/term in loan & | ||
567 | ![]() |
Error during transfer of loan & | ||
568 | ![]() |
You have not entered a loan to be transferred | Space: object requires documentation | |
569 | ![]() |
Transfer successfully completed | ||
570 | ![]() |
Transfer was cancelled due to & | ||
571 | ![]() |
Date of balance sheet transfer must not be in the future | ||
572 | ![]() |
No contract data maintained for loan &1 | Space: object requires documentation | |
573 | ![]() |
Enter the mandatory fields first | Space: object requires documentation | |
574 | ![]() |
Acct assignment reference for loan & not yet available | ||
575 | ![]() |
No G/L acct exists for account assignment reference & | ||
576 | ![]() |
Contract & has different ID "Automat. customer" | ||
577 | ![]() |
No authorization for company code and/or product type for &1 | Space: object requires documentation | |
578 | ![]() |
Error during determination of the remaining investment loan & | ||
579 | ![]() |
Loan &1 is not yet disbursed | Space: object requires documentation | |
580 | ![]() |
Loan & has not yet been released | ||
581 | ![]() |
There is still transition data to be released for loan & | ||
582 | ![]() |
Error & during creation of release data | ||
583 | ![]() |
Error & during creation of transition data | ||
584 | ![]() |
Transfer data saved | ||
585 | ![]() |
Transfer data deleted | ||
586 | ![]() |
Loan & is being rolled over | ||
587 | ![]() |
Error in the rollover check & | ||
588 | ![]() |
*************** Decision ***************************** | ||
589 | ![]() |
The loan number is not in the application status | ||
590 | ![]() |
No main object available for application & | ||
591 | ![]() |
No land register data available for object & | ||
592 | ![]() |
No address exists for object & | ||
593 | ![]() |
Enter a product type | Space: object requires documentation | |
594 | ![]() |
Contract & has already been created | ||
595 | ![]() |
No & created | ||
596 | ![]() |
Error & in the release of & | ||
597 | ![]() |
Application & successfully released | ||
598 | ![]() |
Total loan sum is larger than the application loan amount | ||
599 | ![]() |
No data from the credit standing check exists for this partner | Space: object requires documentation | |
600 | ![]() |
Release cancelled for application & | ||
601 | ![]() |
Release inactive at present | ||
602 | ![]() |
Object type &1 not defined | Space: object requires documentation | |
603 | ![]() |
No data exists from collateral value determination | Space: object requires documentation | |
604 | ![]() |
'Decision' function not available for product types for loans taken (&1) | Space: object requires documentation | |
605 | ![]() |
*************** Parts of building overview and entry **************** | ||
606 | ![]() |
No building part exists | ||
607 | ![]() |
Building part number & already assigned | ||
608 | ![]() |
Building part & was changed | ||
609 | ![]() |
Building part & deleted | ||
610 | ![]() |
No building part available for object | ||
611 | ![]() |
Totals overflow; Addition for all buildings not possible | ||
612 | ![]() |
Totals overflow: Addition to total area not possible | ||
613 | ![]() |
Enter the usage type | Space: object requires documentation | |
614 | ![]() |
No previous building part exists | Space: object requires documentation | |
615 | ![]() |
& was & | ||
616 | ![]() |
Overflow occurred while calculating the new commitment | Space: object requires documentation | |
617 | ![]() |
Overflow occurred while calculating the existing commitment | Space: object requires documentation | |
618 | ![]() |
Overflow occurred while calculating the total granted | Space: object requires documentation | |
619 | ![]() |
************** Transfer postings (continued from message 632) ********* | ||
620 | ![]() |
Loan & already repaid | ||
621 | ![]() |
Advance payment for loan &, transfer not allowed | ||
622 | ![]() |
Credit memo record available for loan &, transfer not permitted | ||
623 | ![]() |
Interest repayment-relevant posting exists after key date for loan & | Space: object requires documentation | |
624 | ![]() |
Discount accrued incorrect for loan & | ||
625 | ![]() |
Interest repmnt-relevant planned record exists after key date for loan & | Space: object requires documentation | |
626 | ![]() |
Loan &: Discount transfer posting amount is greater than permitted | Space: object requires documentation | |
627 | ![]() |
Error in the transfer posting | Space: object requires documentation | |
628 | ![]() |
No acct assignment ref. change since the last transfer posting | ||
629 | ![]() |
No acct assignment ref. change since the loan exists | ||
630 | ![]() |
No transfer flags exist for the selected loans | Space: object requires documentation | |
631 | ![]() |
The loan &1 is flagged for the balance sheet transfer run | Space: object requires documentation | |
632 | ![]() |
Reversal of transfer of capital was posted | ||
633 | ![]() |
Reversal of capital transfer was terminated due to error & | Space: object requires documentation | |
634 | ![]() |
Posting terminated as a result of user entry | Space: object requires documentation | |
635 | ![]() |
New condition exists after key-date for loan & | ||
636 | ![]() |
Posting error in final payment settlement | Space: object requires documentation | |
637 | ![]() |
Loan &: Premium transfer > Permitted prem. - Guaranteed prem. | ||
638 | ![]() |
Loan with premium and discount in one transfer | Space: object requires documentation | |
639 | ![]() |
Loans given und loans taken in one transfer posting | ||
640 | ![]() |
Posting date is before the posting date of the documents to be reversed | Space: object requires documentation | |
641 | ![]() |
No amount entered for loan & | ||
642 | ![]() |
You have not pressed 'enter' so no checks were run | Space: object requires documentation | |
643 | ![]() |
Advance payment test: Transfer posting not possible | Space: object requires documentation | |
644 | ![]() |
Corresponding reference entry for & missing | Space: object requires documentation | |
645 | ![]() |
You can only reverse this flow by reversing a capital transfer | Space: object requires documentation | |
646 | ![]() |
Reversal referencing error; loan &1 in company code &2 | Space: object requires documentation | |
647 | ![]() |
The contracts entered have different product types | Space: object requires documentation | |
648 | ![]() |
Loans with 'net' posting sys. and rate gain determ. cannot be transferred | Space: object requires documentation | |
649 | ![]() |
IPD block can only be reset manually | Space: object requires documentation | |
650 | ![]() |
** Disbursements/ Postings/ Pmnt adv.not.mainten./ Pmnt splitting *** | ||
651 | ![]() |
Customer &1 has no bank details of the bank details ID &2 | Space: object requires documentation | |
652 | ![]() |
No bank details available for customer & | ||
653 | ![]() |
Enter the bank data in the bank directory | Space: object requires documentation | |
654 | ![]() |
Error whilst reading customer & in company code & | ||
655 | ![]() |
TZB06 not maintained for key & & & & (no amount witheld) | ||
656 | ![]() |
Enter at least the flow type, date and amount | Space: object requires documentation | |
657 | ![]() |
An entry with the same date already exists | ||
658 | ![]() |
Local currency amount and rate of exchange reset | ||
659 | ![]() |
Flow type & is not permitted for loans | ||
660 | ![]() |
Flow type & is not permitted for maintaining pmnt advice notice | ||
661 | ![]() |
No pmnt advice notice data exists | ||
662 | ![]() |
Flow cannot be saved | ||
663 | ![]() |
Main loan partner could not be determined | Space: object requires documentation | |
664 | ![]() |
Reference flow type missing for flow type & (TZB06) | ||
665 | ![]() |
Withholding amount was cancelled since customer is alternative payer | Space: object requires documentation | |
666 | ![]() |
No suitable line items found (VDBEPI) & & | ||
667 | ![]() |
Check incidental expenses since changes have probably been lost | Space: object requires documentation | |
668 | ![]() |
Gross amount and percentage rate could not be determined | ||
669 | ![]() |
Check condition-dependent incidental costs | Space: object requires documentation | |
670 | ![]() |
Check allocation of incidental costs due to modified payment date | Space: object requires documentation | |
671 | ![]() |
& overdue items have been deselected | ||
672 | ![]() |
Not possible to reset overdue items | ||
673 | ![]() |
No customer assigned to partner &1 | Space: object requires documentation | |
674 | ![]() |
You are creating a disbursement for a period that is already posted | Space: object requires documentation | |
675 | ![]() |
No corresponding flow data exists for release | Space: object requires documentation | |
676 | ![]() |
No posting object has been selected | Space: object requires documentation | |
677 | ![]() |
Not all of the required values have been entered | Space: object requires documentation | |
678 | ![]() |
Error while importing the release data | Space: object requires documentation | |
679 | ![]() |
********* Special arrangements-Overview and entry ********************** | ||
680 | ![]() |
No special arrangement exists | ||
681 | ![]() |
Special arrangement: Changes were saved | ||
682 | ![]() |
Special arrangement: Deletion stored | ||
683 | ![]() |
Type of restraint on drawing & not in table TZV05 | Space: object requires documentation | |
684 | ![]() |
You need to specify currency when entering an amount | Space: object requires documentation | |
685 | ![]() |
Error whilst reading the special arrangements & | ||
686 | ![]() |
Entry of special arrangement cancelled externally | Space: object requires documentation | |
687 | ![]() |
Error in the processing of special arrangement &1 | Space: object requires documentation | |
688 | ![]() |
************** Conditions ************************* | Space: object requires documentation | |
689 | ![]() |
Position the cursor on a valid condition header | Space: object requires documentation | |
690 | ![]() |
************** Collateral ************************* | Space: object requires documentation | |
691 | ![]() |
Land registry & does not exist | Space: object requires documentation | |
692 | ![]() |
Encumbrance does not exist | ||
693 | ![]() |
Loan collateral does not exist | ||
694 | ![]() |
Land register, section III not available | ||
695 | ![]() |
Encumbrance no. & created for object & | ||
696 | ![]() |
Encumbrance number &1 changed for object &2 | Space: object requires documentation | |
697 | ![]() |
There are still joint liability objects to be processed | ||
698 | ![]() |
Section III-Number already assigned | ||
699 | ![]() |
Selection not permitted (only joint liability objects allowed) | Space: object requires documentation | |
700 | ![]() |
Encumbrance still missing for referenced main object | ||
701 | ![]() |
Encumbrance created for joint liability object &1 | Space: object requires documentation | |
702 | ![]() |
Encumbrance no. & released for object & | ||
703 | ![]() |
Release collateral with joint liability objects first | Space: object requires documentation | |
704 | ![]() |
Release only permitted for encumbrances saved in system | ||
705 | ![]() |
Encumbrance changed for joint liability object &1 | Space: object requires documentation | |
706 | ![]() |
& & has been created | ||
707 | ![]() |
& & has been changed | ||
708 | ![]() |
Contract end is before contract date | ||
709 | ![]() |
Contribution is greater than or equal to the value | Space: object requires documentation | |
710 | ![]() |
An entry already exists on this date | ||
711 | ![]() |
Collateral is already assigned | ||
712 | ![]() |
Assignment amount exceeds the total value of the collateral | ||
713 | ![]() |
Assignment amount and total value have different currencies | ||
714 | ![]() |
Set index-linked indicator | Space: object requires documentation | |
715 | ![]() |
Selection criteria does not correspond with the collateral type | Space: object requires documentation | |
716 | ![]() |
Selection carried out only for criteria in selection block 2 | ||
717 | ![]() |
Entry & does not exist | ||
718 | ![]() |
Entry & is not maintained as an encumbrance | ||
719 | ![]() |
No encumbrances exist for the assignment | Space: object requires documentation | |
720 | ![]() |
Collateral type is not entered as main collateral | ||
721 | ![]() |
Enter the company code first | Space: object requires documentation | |
722 | ![]() |
***************** Accruals/deferrals / Waiver/ Non-acceptance *** | ||
723 | ![]() |
Date cannot be later than the end of the fixed period | Space: object requires documentation | |
724 | ![]() |
Date cannot be before the start of the fixed period | Space: object requires documentation | |
725 | ![]() |
Accruals/deferrals were posted | ||
726 | ![]() |
Enter the posting date | Space: object requires documentation | |
727 | ![]() |
No accruals/deferrals amounts determined | ||
728 | ![]() |
Amount cannot be larger than disbursement obligation | Space: object requires documentation | |
729 | ![]() |
Loan has already been disbursed | ||
730 | ![]() |
Select what you want to accrue/defer -(discount)premium - others | Space: object requires documentation | |
731 | ![]() |
Only select one accrual/deferral type (discount)premium - others | Space: object requires documentation | |
732 | ![]() |
It is not possible to release the disbursement | ||
733 | ![]() |
Enter a flow type | Space: object requires documentation | |
734 | ![]() |
Enter only valid flow types | Space: object requires documentation | |
735 | ![]() |
Flow type you entered is not relevant to accrual/deferral. | ||
736 | ![]() |
Flow types not relevant to acc./def. or don't match with acc./def. type | Space: object requires documentation | |
737 | ![]() |
For discount/premium accrual/deferral, enter only correspond. flow types | Space: object requires documentation | |
738 | ![]() |
Make entries in all fields | Space: object requires documentation | |
739 | ![]() |
One offer must be available for a partial waiver | ||
740 | ![]() |
Posting date lies in the future | ||
741 | ![]() |
Posting date is before the accrual/deferral key date | ||
742 | ![]() |
Posting date of reset is before the accrual/deferral key date | ||
743 | ![]() |
No accrual/deferral flow types have been customized | ||
744 | ![]() |
No posted accrual/deferral flows exist for processing | ||
745 | ![]() |
Error when VDBEPI read for customer & | ||
746 | ![]() |
Internal error during determination of reference flow type for &1 | Space: object requires documentation | |
747 | ![]() |
Entry & is greater than the amount in arrears & | ||
748 | ![]() |
VDBEPP record has no SREFBEW, RZEBEL is & | ||
749 | ![]() |
Error: Posting date of records to be reversed is after reversal post.date | Space: object requires documentation | |
750 | ![]() |
Costs could not be saved | Space: object requires documentation | |
751 | ![]() |
Posting date for reset is before accrual/deferral posting date | Space: object requires documentation | |
752 | ![]() |
************* DEADLINE MONITORING ************************************ * | ||
753 | ![]() |
& deadline reminder(s) were found | ||
754 | ![]() |
Report RFVDSTDA is out of date, use report RFVDFAVI | Space: object requires documentation | |
755 | ![]() |
More than one sender is maintained; system applies company code &1 | The short text describes the object sufficiently | |
756 | ![]() |
************* Account statements and other lists *********** | Space: object requires documentation | |
757 | ![]() |
Error occurred while hiding flow types | Space: object requires documentation | |
758 | ![]() |
No payment usage found for loan document & | Space: object requires documentation | |
759 | ![]() |
No data exists | Space: object requires documentation | |
760 | ![]() |
Document date of reset is before accrual/deferral posting date | Space: object requires documentation | |
761 | ![]() |
Document date of reversal is before posting date of flow | Space: object requires documentation | |
762 | ![]() |
Open items exist for a customer who is not the main borrower | Space: object requires documentation | |
763 | ![]() |
Download is not supported on your client | The short text describes the object sufficiently | |
764 | ![]() |
Unable to save file | The short text describes the object sufficiently | |
765 | ![]() |
User interface refused file transfer | The short text describes the object sufficiently | |
766 | ![]() |
Borrower number of partner &1 is not maintained | The short text describes the object sufficiently | |
767 | ![]() |
Borrower entity number of partner &1 is not maintained | The short text describes the object sufficiently | |
768 | ![]() |
Approach used for partner &1 is not maintained | The short text describes the object sufficiently | |
769 | ![]() |
Risk classification for partner &1 is not maintained | The short text describes the object sufficiently | |
770 | ![]() |
Creditor ID for company code &1 is not maintained | The short text describes the object sufficiently | |
771 | ![]() |
Flow types cannot be hidden | Space: object requires documentation | |
772 | ![]() |
'Entry date' after 'System date' | Space: object requires documentation | |
773 | ![]() |
Date 'From' or date 'To' is missing | ||
774 | ![]() |
The values displayed cannot be changed | ||
775 | ![]() |
No active loans selected | ||
776 | ![]() |
No postings exist | ||
777 | ![]() |
No FI document number exists | ||
778 | ![]() |
Output incomplete due to lack of authorizations | Space: object requires documentation | |
779 | ![]() |
Only one company code is permitted per report run | Space: object requires documentation | |
780 | ![]() |
Column entry is missing in flow type &1 | Space: object requires documentation | |
781 | ![]() |
No reversal postings could be hidden | ||
782 | ![]() |
Only one flow exists | Space: object requires documentation | |
783 | ![]() |
Error occurred while determining the overpayment | Space: object requires documentation | |
784 | ![]() |
Altogether, & records were selected | ||
785 | ![]() |
****** Interest Certificate and External Account Statement ************** | ||
786 | ![]() |
Evaluation gap between last key date (&1) and 'date from' (&2) | Space: object requires documentation | |
787 | ![]() |
No copy can be made of last acct statement because it is not created yet | ||
788 | ![]() |
Start date is after the key date of account statement | ||
789 | ![]() |
'Date from' (&1) adjusted to last key date (&2) | Space: object requires documentation | |
790 | ![]() |
Interest certificate already created for this period | Space: object requires documentation | |
791 | ![]() |
Start date of account statement < than date of first entry | ||
792 | ![]() |
You do not have authorization | Space: object requires documentation | |
793 | ![]() |
Processing type: 'Manual' defined. | Space: object requires documentation | |
794 | ![]() |
Processing type: 'Do not generate IC' defined | Space: object requires documentation | |
795 | ![]() |
No postings relevant to interest certificate in the evaluation period | Space: object requires documentation | |
796 | ![]() |
Customizing: Internal flow type &1 is not assigned | Space: object requires documentation | |
797 | ![]() |
Special postings (IVA): No interest certificate | Space: object requires documentation | |
798 | ![]() |
Customizing: Display '&1' not permitted | Space: object requires documentation | |
799 | ![]() |
Customizing: Assignment to column &1 not permitted | Space: object requires documentation | |
800 | ![]() |
Customizing: External flow type &1 not maintained | Space: object requires documentation | |
801 | ![]() |
Reversal indicator &1 not taken into consideration for postings | Space: object requires documentation | |
802 | ![]() |
Evaluation already made for part of period | Space: object requires documentation | |
803 | ![]() |
Key date could not be updated | Space: object requires documentation | |
804 | ![]() |
Key date was not updated due to error message | Space: object requires documentation | |
805 | ![]() |
No loan selected | Space: object requires documentation | |
806 | ![]() |
The key date (date until) is after or the same as the current date | Space: object requires documentation | |
807 | ![]() |
Debit/credit indicator not maintained in table TZBOK | ||
808 | ![]() |
Period was changed because copy of the last ext. acct stmnt was generated | Space: object requires documentation | |
809 | ![]() |
Date from is after date until | ||
810 | ![]() |
No external acct statement-relevant postings in the evaluation period | ||
811 | ![]() |
Special postings (IVA). No external account statement possible | Space: object requires documentation | |
812 | ![]() |
Key date must after start date | ||
813 | ![]() |
Start date of account statement is after the commitment date of loan | ||
814 | ![]() |
Key date of current account statement is after the current date | Space: object requires documentation | |
815 | ![]() |
Key date of curr. account statement is identical with current date | ||
816 | ![]() |
Generation frequency for this loan is 7 (no generation) | ||
817 | ![]() |
Curr. account statement already exists -> only copy of last one possible | Space: object requires documentation | |
818 | ![]() |
Start of period may be changed if account statement already exists | ||
819 | ![]() |
Periods are ignored, as copy of last account statement is generated | ||
820 | ![]() |
************* Order *********************************** | ||
821 | ![]() |
Date 'Value date up to' is before the date 'Value date from' | ||
822 | ![]() |
No preemption conditions have been created on this date | ||
823 | ![]() |
Rate will be adjusted in accordance with preemption conditions | Space: object requires documentation | |
824 | ![]() |
Enter account assignment reference | Space: object requires documentation | |
825 | ![]() |
No orders available | ||
826 | ![]() |
Remaining investment is & | ||
827 | ![]() |
Choose & | Space: object requires documentation | |
828 | ![]() |
Selected order has already been executed - only display function possible | Space: object requires documentation | |
829 | ![]() |
Order creation not possible; capital no longer available | ||
830 | ![]() |
Only & & available for the order | ||
831 | ![]() |
Execution not possible. There are still orders with an earlier date | ||
832 | ![]() |
Reverse all the documents, starting with document &1 of the order | Space: object requires documentation | |
833 | ![]() |
Delete/reverse all subsequent orders first | Space: object requires documentation | |
834 | ![]() |
& is not a contract | ||
835 | ![]() |
Calculation date before period start & | ||
836 | ![]() |
General exception while reading values from the screen before PAI | Space: object requires documentation | |
837 | ![]() |
*** Messages for posting area ******************************************* | ||
838 | ![]() |
************* Reports from posting area ********************************* | ||
839 | ![]() |
The flow type & is not available in table TZB0A | ||
840 | ![]() |
No manual posting available (memo records) for loan no. & | ||
841 | ![]() |
Flow type & entered is not available or not permitted | ||
842 | ![]() |
Select dunning charges or interest on arrears | Space: object requires documentation | |
843 | ![]() |
No plannned or suspense data exists for loan number &1 | Space: object requires documentation | |
844 | ![]() |
No actual records exist for loan &1 | Space: object requires documentation | |
845 | ![]() |
No manual posting available on key date & | ||
846 | ![]() |
Enter the key date | Space: object requires documentation | |
847 | ![]() |
Cancel payment block in document | Space: object requires documentation | |
848 | ![]() |
Enter valid value (X) | Space: object requires documentation | |
849 | ![]() |
Only select one document | Space: object requires documentation | |
850 | ![]() |
Select one company code only | Space: object requires documentation | |
851 | ![]() |
On the following screen, carry out the reversal using the function "Save" | Space: object requires documentation | |
852 | ![]() |
A condition could be created via repayment. Check | Space: object requires documentation | |
853 | ![]() |
No manual postings exist | Space: object requires documentation | |
854 | ![]() |
Suspense data has already been written. Function not possible | Space: object requires documentation | |
855 | ![]() |
No data was selected | Space: object requires documentation | |
856 | ![]() |
Only enter one repayment | Space: object requires documentation | |
857 | ![]() |
Enter date in correct form | Space: object requires documentation | |
858 | ![]() |
Release object not found | Space: object requires documentation | |
859 | ![]() |
No overdue items exist | Space: object requires documentation | |
860 | ![]() |
Taxes will be posted as well | Space: object requires documentation | |
861 | ![]() |
If it cannot be solved automatically, edit the conditions | Space: object requires documentation | |
862 | ![]() |
It is not possible to reduce installments for this repayment type | Space: object requires documentation | |
863 | ![]() |
Position cursor on posting text | Space: object requires documentation | |
864 | ![]() |
Invalid value | Space: object requires documentation | |
865 | ![]() |
Records from the conditions cannot be deleted | Space: object requires documentation | |
866 | ![]() |
Postings which are not based on conditions cannot be reversed | ||
867 | ![]() |
The item is not cleared | Space: object requires documentation | |
868 | ![]() |
Enter a reason for reversal | Space: object requires documentation | |
869 | ![]() |
An unsch. repayment already exists for a later date. Reverse this first | Space: object requires documentation | |
870 | ![]() |
No address exists for loan no. & | Space: object requires documentation | |
871 | ![]() |
No loan collateral acc. to PRF list 04 exists for loan no. & | Space: object requires documentation | |
872 | ![]() |
No collateral in securities (PRF list 05, subs. 01) exists for loan no. & | Space: object requires documentation | |
873 | ![]() |
No collateral in reg. bonds (PRF list 05, subs. 2) exists for loan no. & | Space: object requires documentation | |
874 | ![]() |
No collateral in cash (PRF list 05, subs. 03) exists for loan no. & | Space: object requires documentation | |
875 | ![]() |
No collateral in life insurance (PRF list 07) exists for loan no. & | Space: object requires documentation | |
876 | ![]() |
& & & & | ||
877 | ![]() |
& & & |
History
Last changed on/by | ![]() |
20130531 | SAP |
SAP Release Created in | 110 |