SAP ABAP Message Class FTVV_MESSAGES (Reporting Financial Assets Management)
Basic Data
Hierarchy
☛
EA-FINSERV (Software Component) SAP Enterprise Extension Financial Services
⤷
FIN-FSCM-TRM (Application Component) Treasury and Risk Management
⤷
FTVV (Package) TR - Objects from FVV in both Loans/Securities areas
⤷
⤷
Attributes
| Message class | FTVV_MESSAGES | |
| Short Description | Reporting Financial Assets Management | |
| Changed On | 20130531 | |
| Last Changed At | 105616 |
Messages
| # | Message | Message Short Text | Documentation status | Authorization check |
|---|---|---|---|---|
| 1 | ********** General messages *********************** | |||
| 2 | Loan no. &1 does not exist in company code &2 | Space: object requires documentation | ||
| 3 | Loan no. &1 is already available in company code &2 | Space: object requires documentation | ||
| 4 | Data inconsistency in table & (key missing) | |||
| 5 | Position the cursor on a valid entry | Space: object requires documentation | ||
| 6 | Choose a processing option | Space: object requires documentation | ||
| 7 | No loan partner exists for loan no. & | |||
| 8 | Loan no. is not between & and & | |||
| 9 | Loan number not numerical | Space: object requires documentation | ||
| 10 | No change made to loan no. & | |||
| 11 | Product type &1 is not permitted for product category &2 | Space: object requires documentation | ||
| 12 | Product type & is not a loan product type | |||
| 13 | No data entered | |||
| 14 | Select one entry only | Space: object requires documentation | ||
| 15 | For prod. type &1, number range interval &2 entered does not exist | Space: object requires documentation | ||
| 16 | Error during number assignment | |||
| 17 | Internal number assignment to be used for product type &1 | |||
| 18 | Loan no. &1 is in company code &2 | |||
| 19 | Borrower &1 does not exist | Space: object requires documentation | ||
| 20 | Loan no. &1 belongs to product category &2 | Space: object requires documentation | ||
| 21 | Enter data in full | Space: object requires documentation | ||
| 22 | Create main loan partner | Space: object requires documentation | ||
| 23 | Create a collateral object for the loan | Space: object requires documentation | ||
| 24 | Create encumbrance on real estate for loan on | Space: object requires documentation | ||
| 25 | Create a condition | Space: object requires documentation | ||
| 26 | Enter valid OK-code | Space: object requires documentation | ||
| 27 | Check run was terminated - no data saved | |||
| 28 | Check run was terminated | |||
| 29 | Status was changed - Check run will be carried out | |||
| 30 | You are not authorized for this action | |||
| 31 | Error during creation in table &1 | |||
| 32 | Encumbr.on real estate and objects have to be copied together | |||
| 33 | Date is in the future | |||
| 34 | Enter loan number | Space: object requires documentation | ||
| 35 | Error in number assignment for object &1, group &2, sy-subrc = &3 | Space: object requires documentation | ||
| 36 | No partner was selected | |||
| 37 | The loan number assigned is already in the critical area | |||
| 38 | Loan cannot be created. Last number has been assigned | |||
| 39 | No loan found | |||
| 40 | Partner and role type do not match up (natural or legal person) | |||
| 41 | &1 with role &2 already exists | |||
| 42 | No main loan partner exists for investment no. &1 | Space: object requires documentation | ||
| 43 | Create main loan partner first | Space: object requires documentation | ||
| 44 | No object exists for loan no. &1 | |||
| 45 | No collateral exists for loan no. &1 | |||
| 46 | Define field selection | Space: object requires documentation | ||
| 47 | Loan has not been released, data will be saved | |||
| 48 | Loan no. & has not yet been released | |||
| 49 | Object no. & for loan has not been released | |||
| 50 | Partner & for loan has not been released | |||
| 51 | The loan number assigned is already in the critical area | |||
| 52 | Number range object &1 with interval &2 is not defined | Space: object requires documentation | ||
| 53 | Number range object &1 with interval &2 has to be internal | |||
| 54 | Loan number &1 not found in company code &2 | |||
| 55 | Internal error &1 when changing loan &2 &3 | |||
| 56 | Acct assignment ref. do not exist, posting is not possible | |||
| 57 | Acct assignment reference could not be determined | Space: object requires documentation | ||
| 58 | Maintain reason for restraint on disposal | Space: object requires documentation | ||
| 59 | Contracts belong to different product types | Space: object requires documentation | ||
| 60 | Sample loan does not belong to product type &1 | |||
| 61 | No number range for sample loans is assigned to the product type &1 | |||
| 62 | Sample loan no. &1 not available | Space: object requires documentation | ||
| 63 | A sample loan must be created without any sample references | |||
| 64 | No sample loans exist for CoCd &1 and product category &2 | Space: object requires documentation | ||
| 65 | Manual rollover processing is not possible | |||
| 66 | Loan has been entered in the rollover file & & & & | |||
| 67 | Partner &1 is not assigned to contract &2 | |||
| 68 | Application date cannot be after approval date | |||
| 69 | Approval date cannot be after commitment date | |||
| 70 | Error &1 whilst inserting a record for subsidies (&2) | |||
| 71 | Error &1 whilst changing a record for subsidies (&2) | |||
| 72 | Error &1 whilst deleting a record for subsidies (&2) | |||
| 73 | Error &1 whilst locking the table for subsidies | |||
| 74 | Table for subsidies locked by &1 | |||
| 75 | Select an entry | Space: object requires documentation | ||
| 76 | &1 is not maintained as &2 | |||
| 77 | You have no authorization for this loan | |||
| 78 | No records with PN / available in conditions | |||
| 79 | Record is &1 | |||
| 80 | Enter a movement type | Space: object requires documentation | ||
| 81 | Warning: Loan repaid on schedule | Space: object requires documentation | ||
| 82 | Loan is completely settled | Space: object requires documentation | ||
| 83 | Amount cannot be larger than commitment capital (&1 &2) | |||
| 84 | Data for account assignment reference determination not maintained | Space: object requires documentation | ||
| 85 | Neither planned nor actual principle selected | Space: object requires documentation | ||
| 86 | Disbursement not possible. Create interest conditions first | Space: object requires documentation | ||
| 87 | You are not authorized to maintain the regulatory reporting data | |||
| 88 | Customer number of main loan partner cannot be determined | Space: object requires documentation | ||
| 89 | No withholding amount for incidental costs with alternative payee | |||
| 90 | Conversion &1 &2 on &3 not possible | |||
| 91 | Conversion ratio from currency &1 to &2 on &3 is not maintained | |||
| 92 | Original doc. &1 for residual item &2 cannot be read or is invalid | Space: object requires documentation | ||
| 93 | Maintain the name of flow type &1 in the configuration menu. | Space: object requires documentation | ||
| 94 | Product type &1 not maintained in the configuration menu | Space: object requires documentation | ||
| 95 | Product type &1 not maintained for company code &2 | Space: object requires documentation | ||
| 96 | Release object &1 not defined in the configuration menu | Space: object requires documentation | ||
| 97 | Maintain usage type &1 for rental unit in configuration menu | Space: object requires documentation | ||
| 98 | Activity category must not be maintained for this product type | Space: object requires documentation | ||
| 99 | Status must not be maintained for this product type | Space: object requires documentation | ||
| 100 | Condition change for loan &1 was saved | |||
| 101 | Transaction code &1 not entered in table TDA10 | Space: object requires documentation | ||
| 102 | Entry & & & is missing in table TDA11 | |||
| 103 | Table &1 not maintained | Space: object requires documentation | ||
| 104 | General ledger account from table T037S unknown | |||
| 105 | No entry for business type &1 exists in table &2 | |||
| 106 | & & saved | |||
| 107 | & & was created in company code & | |||
| 108 | Error in management of locking objects | |||
| 109 | Contract no. & is blocked by user & at present | |||
| 110 | Order no. & created for contract no. & | |||
| 111 | & no. & was reversed or deleted | |||
| 112 | Reactivation of & no. & saved | |||
| 113 | Order settlement for contract no. & was saved | |||
| 114 | Disbursement was posted and saved | |||
| 115 | No entry for product type & with ref. acct. ass. & in tab. & | |||
| 116 | Flow type &1 not permitted for this transaction | |||
| 117 | Reservation no. & was activated | |||
| 118 | Payment block was set | |||
| 119 | $ flows for an activity will be updated | Space: object requires documentation | ||
| 120 | Invalid selection | |||
| 121 | No bank details ID found | Space: object requires documentation | ||
| 122 | No bank details ID selected | Space: object requires documentation | ||
| 123 | Partner not found | |||
| 124 | Incoming payment created | |||
| 125 | Check bank details ID | Space: object requires documentation | ||
| 126 | Customer does not exist | |||
| 127 | Account is incorrect | Space: object requires documentation | ||
| 128 | Chart of accounts not found | |||
| 129 | Company code not found | Space: object requires documentation | ||
| 130 | Account not found | |||
| 131 | Customer number not found | |||
| 132 | Acct assignment not found | |||
| 133 | An incoming payment has already been created | Space: object requires documentation | ||
| 134 | Status for product type & not defined | Space: object requires documentation | ||
| 135 | Impermissible control of withholding indicator in incid.expenses | |||
| 136 | No interest calculation type in LC or FC selected | Space: object requires documentation | ||
| 137 | Bank details ID not yet maintained | Space: object requires documentation | ||
| 138 | Select a role category | Space: object requires documentation | ||
| 139 | Pmnt method &1 is for incoming payments - maintain bank details ID | Space: object requires documentation | ||
| 140 | Net disbursement amount is negative. Correct this. | Space: object requires documentation | ||
| 141 | No display/selection of loans for which there is no authorization | Space: object requires documentation | ||
| 142 | Prio.level 99 requires flow type with cancel.IP-ID 03 or 04 | |||
| 143 | Transaction was cancelled | |||
| 144 | 'Date from' cannot be after 'Date to' | |||
| 145 | Internal error. Repeat your action | Space: object requires documentation | ||
| 146 | Internal error; table & unknown | |||
| 147 | Table & could not be & | |||
| 148 | No items to pay interest on were selected | |||
| 149 | Conditions will be displayed | |||
| 150 | Define a dunning block for posting to a customer account | Space: object requires documentation | ||
| 151 | ********* Status error messages ****************************** | |||
| 152 | Loan & not in status & | |||
| 153 | Select a new status | Space: object requires documentation | ||
| 154 | The & has a delete flag | |||
| 155 | The & has a delete flag | |||
| 156 | The necessary subsequent status is not possible | |||
| 157 | Loan & transferred to status & | |||
| 158 | Status & does not exist | |||
| 159 | Status &1 does not belong to loans given | |||
| 160 | Release records to be released | |||
| 161 | Loan cannot be overredeemed on &1 for capital available on &2 | Space: object requires documentation | ||
| 162 | Application has already been approved - only display function possible | Space: object requires documentation | ||
| 163 | Reductions can only be entered in contract status | |||
| 164 | Function is not permitted for the product type & | |||
| 165 | The non-acceptance reason is not allowed | |||
| 166 | The loan is no longer active. Function not possible | Space: object requires documentation | ||
| 167 | The loan is flagged for deletion | |||
| 168 | Offers/Contracts already exist for this application | |||
| 169 | Loan & is still active | |||
| 170 | No customer is assigned to the main loan partner / issuer | Space: object requires documentation | ||
| 171 | Check calculation basis (&1) for repayment | Space: object requires documentation | ||
| 172 | Data is missing for repayment clearing | |||
| 173 | Data is missing for interest adjustment | |||
| 174 | Uns. repayment more than/equal to rem. cap. & => & | |||
| 175 | Immediate settlement selected in spite of settlement item | |||
| 176 | Commitment capital is zero | |||
| 177 | Payment method &1 not permitted for this partner | Space: object requires documentation | ||
| 178 | Payment method &: Bank details required for the partner | |||
| 179 | No bank details with direct debit authorization exist for partner | |||
| 180 | No direct debit authorization exists for bank details & | |||
| 181 | The main loan partner does not have a customer acct: Posting not possible | Space: object requires documentation | ||
| 182 | Payment method &1 is not available in this country | Space: object requires documentation | ||
| 183 | No customer is assigned to the partner | Space: object requires documentation | ||
| 184 | Partners who are not main loan partners require a payment method | Space: object requires documentation | ||
| 185 | Old account assignment reference &1 will be replaced by &2 | Space: object requires documentation | ||
| 186 | Cash flow could not be generated: No customer account available | Space: object requires documentation | ||
| 187 | Client &: posting cont. & in flow type & not allowed (change customizing) | |||
| 188 | Client &: posting control & in cond. & not allowed (change customizing) | |||
| 189 | Client &, condition group &: condition type & does not exist | |||
| 190 | Client &, CoCd &, contract &: condition type & does not exist | |||
| 191 | Client &1, CoCd &2, contract &3, cond.type &: posting control not allowed | |||
| 192 | Date is before order number &1 (reverse/delete this first) | Space: object requires documentation | ||
| 193 | Calculation date is before acc./def. posting of &1 (reverse first) | Space: object requires documentation | ||
| 194 | No discount was calculated | |||
| 195 | Functions for capital reductions are not permitted | Space: object requires documentation | ||
| 196 | Loan has already been repaid - only display function possible | Space: object requires documentation | ||
| 197 | The loan is not yet disbursed | |||
| 198 | Condition cannot be deleted/deactivated | |||
| 199 | Rollover exists - no changes which affect the capital are permitted | Space: object requires documentation | ||
| 200 | Condition header is already inactive | Space: object requires documentation | ||
| 201 | Enter an amount | Space: object requires documentation | ||
| 202 | Term end is before term start | |||
| 203 | No conditions exist for & no. & | |||
| 204 | Condition with contract no. & already exists | |||
| 205 | Fixed until date/notice date of lender < Eff. from date (cond. header) | Space: object requires documentation | ||
| 206 | Error in condition table | |||
| 207 | Maintain table for flow types | Space: object requires documentation | ||
| 208 | Product type is assigned to the wrong condition group | |||
| 209 | Different currency for commitment capital and payment amount | |||
| 210 | Commitment capital is less than amount already disbursed | |||
| 211 | Up to now, & offers exist | |||
| 212 | Condition header and corresponding items were deleted | |||
| 213 | Offer no. & transferred to contract | |||
| 214 | No other offers exist | |||
| 215 | Entry was deleted. Offers were renumbered | Space: object requires documentation | ||
| 216 | Error during deletion of offer | |||
| 217 | Different 'Fixed From' dates in the offers | |||
| 218 | Process current offer first | Space: object requires documentation | ||
| 219 | Enter data for 'end of term' or 'fixed until' date | Space: object requires documentation | ||
| 220 | Minimum amount in assignments may not be larger than commitment capital | Space: object requires documentation | ||
| 221 | Calculation not possible | |||
| 222 | Calculation not possible | |||
| 223 | Enter settlement date | |||
| 224 | The maximum nominal amount is & & | |||
| 225 | Enter an effective interest method | Space: object requires documentation | ||
| 226 | Enter an interest method | Space: object requires documentation | ||
| 227 | No condition 'Repayment' is assigned to the business type & | |||
| 228 | No historical rates available | |||
| 229 | No historical condition items exist | |||
| 230 | There are no changes which are relevant for effective interest | |||
| 231 | Maintain type of discount witholding | Space: object requires documentation | ||
| 232 | No offer selected | |||
| 233 | 'Valid from' (&) is before 'Fixed to' (&) | |||
| 234 | Capital reduction not possible | |||
| 235 | The maximum deduction amount is & & | |||
| 236 | Not possible to delete entry | |||
| 237 | No offers available | |||
| 238 | Date 'Offer until' before 'Offer on' | |||
| 239 | Date 'Reserved until' before 'Reserved on' | |||
| 240 | Amount cannot be larger than commitment capital (&1 &2) | |||
| 241 | Enter a condition type | Space: object requires documentation | ||
| 242 | A deduction has already been made on & | |||
| 243 | Date is after current date & | |||
| 244 | Select an offer condition | Space: object requires documentation | ||
| 245 | Date is before fixed period end (&) | |||
| 246 | Flow type & already exists on & | |||
| 247 | & later than & | |||
| 248 | & earlier than & | |||
| 249 | & is after current date | |||
| 250 | Function will be installed at a later date | |||
| 251 | *************** Objects **************************** | |||
| 252 | At least 1 object must be assigned | |||
| 253 | Assign object to mortgage loan | Space: object requires documentation | ||
| 254 | The selected object was transferred | |||
| 255 | Address parity in several objects | |||
| 256 | Create a land register and then save the object | Space: object requires documentation | ||
| 257 | Object &1 was &2 | Space: object requires documentation | ||
| 258 | Object number & was deleted | |||
| 259 | Enter a land register for the object first | Space: object requires documentation | ||
| 260 | Enter a valid object number in the field <Joint liability for> | Space: object requires documentation | ||
| 261 | Select an object class before creating an encumbrance (lien) | Space: object requires documentation | ||
| 262 | Object & is already assigned to loan | |||
| 263 | Complete the object data first | Space: object requires documentation | ||
| 264 | Object &1 cannot be deleted, as real estate encumbrances still exist. | Space: object requires documentation | ||
| 265 | Object class cannot be changed since reference object | |||
| 266 | Reference object & is not a main or additional object | |||
| 267 | Object number & not available | |||
| 268 | Only create one main object | Space: object requires documentation | ||
| 269 | Specify the main object | Space: object requires documentation | ||
| 270 | Specify search criteria | Space: object requires documentation | ||
| 271 | ****************** Object plausibilities *********** | |||
| 272 | Create an object address | Space: object requires documentation | ||
| 273 | Complete the land register data | Space: object requires documentation | ||
| 274 | No changes were made to object | Space: object requires documentation | ||
| 275 | Save the object before branching to the real estate register | Space: object requires documentation | ||
| 276 | Property with number & already exists | |||
| 277 | Object has not yet been released | |||
| 278 | More than three entries in the real estate register | Space: object requires documentation | ||
| 279 | Master number assignment is not clear and unmistakeable | |||
| 280 | Enter a number for the real estate register | Space: object requires documentation | ||
| 281 | "Calculation from" and "Calculation to" have to be entered | |||
| 282 | Object no. & is at present blocked by user & | |||
| 283 | Object & is already being processed | |||
| 284 | It is not possible to branch to land register management | |||
| 285 | Encumbrance on real estate is already assigned | |||
| 286 | You will leave the object copy and return to the original object | |||
| 287 | An object is already assigned to the loan | |||
| 288 | Allocation to object &1 already completed | Space: object requires documentation | ||
| 289 | Object cannot be deleted, select "Exit assignment" | Space: object requires documentation | ||
| 290 | Commitment capital is too low | Space: object requires documentation | ||
| 291 | ************** Disbursements / Postings *********************** | |||
| 292 | Disbursement obligation must not be negative | |||
| 293 | Update VDBEKI document & with field RZEBEL & incorrect | |||
| 294 | No disbursement possible (customer account missing for main loan partner) | Space: object requires documentation | ||
| 295 | No disbursement possible (contract status & does not allow posting) | |||
| 296 | Name not maintained for country &1 in language &2 | Space: object requires documentation | ||
| 297 | Enter a "fixed-from" date | Space: object requires documentation | ||
| 298 | No order exists for contract &1 that can be changed | Space: object requires documentation | ||
| 299 | Contract data can only be changed in contract processing | Space: object requires documentation | ||
| 300 | First, select another contract from the finance project for postings | Space: object requires documentation | ||
| 301 | First, select another contract for the borrower for postings | Space: object requires documentation | ||
| 302 | Specify a bank identification number | Space: object requires documentation | ||
| 303 | Enter a bank account number | Space: object requires documentation | ||
| 304 | Enter a bank country | Space: object requires documentation | ||
| 305 | Enter a country key | Space: object requires documentation | ||
| 306 | Enter at least city and name | Space: object requires documentation | ||
| 307 | Enter an address or delete the bank details | Space: object requires documentation | ||
| 308 | Bank number or bank account incorrect in form | |||
| 309 | Payment method not intended for disbursements | |||
| 310 | Disbursement with earlier or same date already exists | |||
| 311 | Drawing amount is larger than payment amount | |||
| 312 | Payment amount is not identical to disposal amount | |||
| 313 | Payment amount is already fully distributed | |||
| 314 | No drawings available | |||
| 315 | No disbursements available yet for loan & | |||
| 316 | Only & & can still be disbursed | |||
| 317 | No disbursements available yet | |||
| 318 | Payment amount is too high | |||
| 319 | The loan & is already fully disbursed | |||
| 320 | The loan is already partly disbursed | |||
| 321 | The flow type is not a disbursement | |||
| 322 | Table TZB0B does not contain an entry for disbursements | |||
| 323 | Enter a flow type | Space: object requires documentation | ||
| 324 | Enter a date | Space: object requires documentation | ||
| 325 | Enter a buying rate or nominal amount | Space: object requires documentation | ||
| 326 | No disbursements to be released for loan & | |||
| 327 | Enter either only the amount or only the percentage rate | Space: object requires documentation | ||
| 328 | Enter the amount or the percentage rate | Space: object requires documentation | ||
| 329 | Enter the base amount and percentage rate | Space: object requires documentation | ||
| 330 | Payment date or interest value date is before current date | |||
| 331 | Posted disbursements cannot be & | |||
| 332 | Enter bank data | Space: object requires documentation | ||
| 333 | No bank data available | |||
| 334 | Bank data not found | |||
| 335 | Local currency is identical to currency of payment amount | Space: object requires documentation | ||
| 336 | All disbursements already posted; only display function possible | |||
| 337 | Single payment is not planned for the payment method | |||
| 338 | Save data for the disbursement just changed first | Space: object requires documentation | ||
| 339 | The settlement can only be changed during the last disbursement | |||
| 340 | Error during assignment of the activity number | |||
| 341 | For customer &, only the following payment methods are valid: $ | |||
| 342 | Only one disbursement exists | |||
| 343 | Only the last disbursement can be & | |||
| 344 | Payment methods for customer &1 not defined | Space: object requires documentation | ||
| 345 | Enter a payment method and define a default value | Space: object requires documentation | ||
| 346 | House bank & is not defined in company code & | |||
| 347 | Customer &1 has no bank details of the bank details ID &2 | Space: object requires documentation | ||
| 348 | No customer is assigned to the loan yet | |||
| 349 | Flow type already exists | |||
| 350 | Line cannot be changed | |||
| 351 | * Partner messages | |||
| 352 | Main contract partner cannot be deleted | |||
| 353 | Enter a partner number | Space: object requires documentation | ||
| 354 | Amounts already withheld upto & | |||
| 355 | At least one partner must be assigned to the activity | Space: object requires documentation | ||
| 356 | Only one main contractual partner should exist | |||
| 357 | At least one main contractual partner must be available | |||
| 358 | Partner is not a & | |||
| 359 | Assign &1 to the file | Space: object requires documentation | ||
| 360 | Assign &1 to the loan | Space: object requires documentation | ||
| 361 | The partner number is not available as agent | |||
| 362 | The partner number is not available as issuer | |||
| 363 | Partner cannot be created as customer | |||
| 364 | Payment date is different to interest value date | |||
| 365 | Payment block & has to be manually reset | |||
| 366 | Condition-dependent items cannot be deleted. Execute using a waiver | Space: object requires documentation | ||
| 367 | Disbursement will be deleted and contract will be saved | |||
| 368 | No role type was assigned to the business partner | Space: object requires documentation | ||
| 369 | Select a role | Space: object requires documentation | ||
| 370 | A & is already assigned to an order. | |||
| 371 | No historical partner data available | |||
| 372 | The file is not assigned to a & | |||
| 373 | Contract has already been created | Space: object requires documentation | ||
| 374 | Partner data of person entitled to dispose was transferred | |||
| 375 | No partner data for persons entitled to dispose was transferred | |||
| 376 | Current field contents will be overwritten when a partner is selected | |||
| 377 | Current field contents will be overwritten when a disposition is selected | |||
| 378 | Data about the selected disposition was transferred | |||
| 379 | Customer & has open items | |||
| 380 | Dunning block not stored in table TZPAB | |||
| 381 | Disbursement not possible because order management is active | Space: object requires documentation | ||
| 382 | Posted disbursements in the future exist for for contract & | Space: object requires documentation | ||
| 383 | Business partner relationship does not exist | Space: object requires documentation | ||
| 384 | Other loans have already been selected for posting charges | Space: object requires documentation | ||
| 385 | No loan for posting charges exists for summarization level &1 | Space: object requires documentation | ||
| 386 | Enter the counterparty first | Space: object requires documentation | ||
| 387 | Payment methods must be entered for a payment request | Space: object requires documentation | ||
| 388 | No payment details defined for partner &1 / currency &2 / direction &3 | Space: object requires documentation | ||
| 389 | No payment details defined for product type & | Space: object requires documentation | ||
| 390 | Payment details not found | Space: object requires documentation | ||
| 391 | Withholding for flow &1 could not be created | Space: object requires documentation | ||
| 392 | Partner & does not exist | Space: object requires documentation | ||
| 393 | Partner &1 does not exist as a counterparty | Space: object requires documentation | ||
| 394 | Enter a contract number | Space: object requires documentation | ||
| 395 | Error during update | Space: object requires documentation | ||
| 396 | Condition &1 has payment method &2 (instead of &3) | Space: object requires documentation | ||
| 397 | You are not authorized for these loans | Space: object requires documentation | ||
| 398 | No alternative payee allowed in document for customer &1 | Space: object requires documentation | ||
| 399 | No finance project number defined: Dunning summarization FP not possible | Space: object requires documentation | ||
| 400 | Postings resulting from the loan conditions already exist | Space: object requires documentation | ||
| 401 | *************** Filed documents ********************* | |||
| 402 | File number does not exist: You can create a file number | Space: object requires documentation | ||
| 403 | File ID not available | |||
| 404 | File ID already available | |||
| 405 | The file ID cannot be changed | |||
| 406 | File cannot be deleted since it is still being used | |||
| 407 | Enter file number | Space: object requires documentation | ||
| 408 | You have no authorization for & & | Space: object requires documentation | ||
| 409 | Enter a file number | Space: object requires documentation | ||
| 410 | File number cannot be changed: Documents exist for the loan | Space: object requires documentation | ||
| 411 | No file number for loan entered | |||
| 412 | The file entered for the loan is not available. Create a file | Space: object requires documentation | ||
| 413 | Function no longer permitted due to withholding of overdue items | |||
| 414 | Admin.costs: Line &1: Amount input not possible, no annual gross yield | Space: object requires documentation | ||
| 415 | Admin.costs: Line &1: Differing amount and percentage entries | Space: object requires documentation | ||
| 416 | Dunning summarization for finance project; specify finance project number | Space: object requires documentation | ||
| 417 | Only loan with dunning summarization level &: Activate posting of charges | Space: object requires documentation | ||
| 418 | Enter the date of the dunning run | Space: object requires documentation | ||
| 419 | Enter the dunning level | Space: object requires documentation | ||
| 420 | Only enter one date and one dunning area | Space: object requires documentation | ||
| 421 | Order cannot be reversed before doc.reversal: Order no. & already settled | Space: object requires documentation | ||
| 422 | Settlement not possible: Order number &1 not yet posted | Space: object requires documentation | ||
| 423 | No condition change possible, since a planned disbursement exists | Space: object requires documentation | ||
| 424 | No waiver possible, since a planned disbursement exists | Space: object requires documentation | ||
| 425 | Dunning summarization for finance project; specify finance project number | Space: object requires documentation | ||
| 426 | Dunning summarization for borrower; partner number was not found | Space: object requires documentation | ||
| 427 | Error occurred while determining the contract for posting charges | Space: object requires documentation | ||
| 428 | Partner blocked by dunning run; relevant dunning data cannot be changed | Space: object requires documentation | ||
| 429 | Change in investment type causes inconsistency in key figure R5/97-App.10 | Space: object requires documentation | ||
| 430 | No entry found matching selection | Space: object requires documentation | ||
| 431 | The documents are not available | |||
| 432 | No documents available in the file & | |||
| 433 | Status for product type not permitted | |||
| 434 | Product type not permitted in company code entered | |||
| 435 | The file ID to product type allocation is not permitted | |||
| 436 | No product type entered yet | |||
| 437 | No account assignment reference exists: Settlement not possible | Space: object requires documentation | ||
| 438 | Order management not available for loans taken | Space: object requires documentation | ||
| 439 | Rollover statistics not availabe for loans taken | Space: object requires documentation | ||
| 440 | Capital amounts could not be determined | Space: object requires documentation | ||
| 441 | Loan &1 already has 'active' status | Space: object requires documentation | ||
| 442 | Commitment capital already disbursed. Purchase order no longer possible | Space: object requires documentation | ||
| 443 | The planned records could not be regenerated | Space: object requires documentation | ||
| 444 | Planned records were written during the simulation | Space: object requires documentation | ||
| 445 | Payment to third party: Partner is main borrower | Space: object requires documentation | ||
| 446 | Order number &1 already exists for the same day | Space: object requires documentation | ||
| 447 | Enter the house bank and house bank account | Space: object requires documentation | ||
| 448 | No direction is defined for flow type &1 (payment is not possible) | Space: object requires documentation | ||
| 449 | No direction defined for flow type & (standing instructions not possible) | Space: object requires documentation | ||
| 450 | House bank account changed based on entries in the payment details | Space: object requires documentation | ||
| 451 | No changes have been made | |||
| 452 | All loans within an IPD level must be in the same currency | Space: object requires documentation | ||
| 453 | No change - due to error in Customizing (condition type for reduction) | Space: object requires documentation | ||
| 454 | Payment details taken from SI for partner &1 and flow type &2 | Space: object requires documentation | ||
| 455 | The payment details have not been changed - please check | Space: object requires documentation | ||
| 456 | Currency changed from &1 to &2: Please check the payment details | Space: object requires documentation | ||
| 457 | No transaction found for this combination of status/mode/product category | Space: object requires documentation | ||
| 458 | No conditions exist: Cash flow not possible | Space: object requires documentation | ||
| 459 | Select the required order | Space: object requires documentation | ||
| 460 | You do not have authorization for this activity for product category &1 | Space: object requires documentation | ||
| 461 | Start of fixed period cannot be after & (posting exists) | Space: object requires documentation | ||
| 462 | Disbursement & is deleted and the contract is saved | Space: object requires documentation | ||
| 463 | A payoff already exists for &1 | Space: object requires documentation | ||
| 464 | For contract 1& an entered payoff exists on &2 | Space: object requires documentation | ||
| 465 | For contact &1 there is an activated or posted payoff on &2 | Space: object requires documentation | ||
| 466 | An entered borrower change exists for contract & | Space: object requires documentation | ||
| 467 | An executed borrower change exists for contract & | Space: object requires documentation | ||
| 468 | &1 data records deleted (tables TWL1T and VZSTXT) | The short text describes the object sufficiently | ||
| 469 | ***** Regulatory reporting ***** | Space: object requires documentation | ||
| 470 | Data not consistent for partner &1 | Space: object requires documentation | ||
| 471 | Data saved | Space: object requires documentation | ||
| 472 | Limit the selection to by partner or name | Space: object requires documentation | ||
| 473 | Erros occured when saving data | Space: object requires documentation | ||
| 474 | Data of sender &1 is missing | The short text describes the object sufficiently | ||
| 475 | No manager loans selected | |||
| 476 | No multi-million credit selected | |||
| 477 | No loans selected | |||
| 478 | ******** Continued: Disbursement ************ | Space: object requires documentation | ||
| 479 | Gross amount is fixed, since only a maximum of &1 % can be disbursed | Space: object requires documentation | ||
| 480 | Select an evaluation type | Space: object requires documentation | ||
| 481 | Restrict the reporting period | Space: object requires documentation | ||
| 482 | Delete the selection fields | Space: object requires documentation | ||
| 483 | Enter the key date | Space: object requires documentation | ||
| 484 | Flow type &1 is not permitted | Space: object requires documentation | ||
| 485 | ***************** Collateral value ************************** | |||
| 486 | & & saved | |||
| 487 | & & deleted | |||
| 488 | No changes made in & & | |||
| 489 | Collateral value & is fixed and cannot be deleted | The short text describes the object sufficiently | ||
| 490 | Market value may not be smaller than the collateral value proposal | |||
| 491 | & & does not exist | The short text describes the object sufficiently | ||
| 492 | Not everything can be included for building structural changes | Space: object requires documentation | ||
| 493 | & & is currently locked by user & | The short text describes the object sufficiently | ||
| 494 | Internal number assignment intended for &1 | The short text describes the object sufficiently | ||
| 495 | Object number is only required during creation | The short text describes the object sufficiently | ||
| 496 | Select an entry | Space: object requires documentation | ||
| 497 | Deduction from & is more than proposal from & | |||
| 498 | Warning, sale value is larger than market value | |||
| 499 | Warning, object value is larger than market value | |||
| 500 | Warning, status can only be changed by altering the setting to 3 | |||
| 501 | Overflow in counter fields - Entry was reset - Check | The short text describes the object sufficiently | ||
| 502 | You are not authorized to carry out activity &1 &2 | Space: object requires documentation | ||
| 503 | User &1 who sets collateral val. cannot be last person &2 to make changes | The short text describes the object sufficiently | ||
| 504 | Error whilst writing release information from &1 | Space: object requires documentation | ||
| 505 | & & is not released | The short text describes the object sufficiently | ||
| 506 | Save the object first | The short text describes the object sufficiently | ||
| 507 | ******************** General master data ******************************** | Space: object requires documentation | ||
| 508 | The Customizing settings for assigning processing staff are incomplete | Space: object requires documentation | ||
| 509 | In Customizing, activity type &1 is defined as not to be displayed | Space: object requires documentation | ||
| 510 | Enter the commitment capital and the 'fixed from' date first | Space: object requires documentation | ||
| 511 | ******************** Interested parties ******************************** | |||
| 512 | Interested party not available yet | |||
| 513 | No partner data created or assigned | |||
| 514 | Interested party & & successfully & | |||
| 515 | Partner & already exists as interested party | |||
| 516 | No & selected | |||
| 517 | Interested party is & | |||
| 518 | Error whilst accessing table & | |||
| 519 | Error in partner data editing | |||
| 520 | & & is currently locked by user & | |||
| 521 | Resubmission sent successfully | |||
| 522 | Format error during entry for resubmission | |||
| 523 | Recipient does not exist | |||
| 524 | Resubmission not sent (docu. text available ?) | |||
| 525 | Mail text not available (-> Docu. = 'X') | |||
| 526 | &1 was cancelled externally | |||
| 527 | Interested party was already applicant | |||
| 528 | & successfully printed | |||
| 529 | Correspondence parameter error & | |||
| 530 | The rejection date is before the application date | |||
| 531 | Date for conditions reservation is before the application date | Space: object requires documentation | ||
| 532 | Error in the partner data update | |||
| 533 | Error during memo pad update | Space: object requires documentation | ||
| 534 | Purpose of loan is not maintained in Customizing | Space: object requires documentation | ||
| 535 | ************************* Credit standing checks *********************** | |||
| 536 | & successfully & | |||
| 537 | No form data available yet | |||
| 538 | No items for form header available | |||
| 539 | These form details are already fixed | |||
| 540 | Form category or form type incorrectly selected | |||
| 541 | Debit type &1 is not in table TDBL | Space: object requires documentation | ||
| 542 | Debits exceed the income -> = 0 | Space: object requires documentation | ||
| 543 | Set the forms already created first | Space: object requires documentation | ||
| 544 | No income entered | |||
| 545 | No expenditure entered | |||
| 546 | You do not have the necessary authorization for this activity | Space: object requires documentation | ||
| 547 | Invalid totals reference in table TDBL | |||
| 548 | Totals reference may not be smaller than the debit type | |||
| 549 | Reference to a charge type is required for mark-ups/discounts | Space: object requires documentation | ||
| 550 | Division result too large | |||
| 551 | Form types not maintained | Space: object requires documentation | ||
| 552 | No form selected | |||
| 553 | No form data exists | Space: object requires documentation | ||
| 554 | Texts for form items not defined | Space: object requires documentation | ||
| 555 | ***************** Transfer postings *********************** | |||
| 556 | Transfer flow type is missing | |||
| 557 | Status not permitted for contract & | |||
| 558 | Currency not permitted for contract & | |||
| 559 | Transfer amnt > Disbursement obligation in loan & | |||
| 560 | The loan number & has been entered many times | |||
| 561 | The posting date is not permitted | |||
| 562 | Transfer larger than capital available in loan & | |||
| 563 | Old error message | |||
| 564 | Select a valid row | Space: object requires documentation | ||
| 565 | Postings already exist for the loan & | |||
| 566 | Posting date after fixed period end/term in loan & | |||
| 567 | Error during transfer of loan & | |||
| 568 | You have not entered a loan to be transferred | Space: object requires documentation | ||
| 569 | Transfer successfully completed | |||
| 570 | Transfer was cancelled due to & | |||
| 571 | Date of balance sheet transfer must not be in the future | |||
| 572 | No contract data maintained for loan &1 | Space: object requires documentation | ||
| 573 | Enter the mandatory fields first | Space: object requires documentation | ||
| 574 | Acct assignment reference for loan & not yet available | |||
| 575 | No G/L acct exists for account assignment reference & | |||
| 576 | Contract & has different ID "Automat. customer" | |||
| 577 | No authorization for company code and/or product type for &1 | Space: object requires documentation | ||
| 578 | Error during determination of the remaining investment loan & | |||
| 579 | Loan &1 is not yet disbursed | Space: object requires documentation | ||
| 580 | Loan & has not yet been released | |||
| 581 | There is still transition data to be released for loan & | |||
| 582 | Error & during creation of release data | |||
| 583 | Error & during creation of transition data | |||
| 584 | Transfer data saved | |||
| 585 | Transfer data deleted | |||
| 586 | Loan & is being rolled over | |||
| 587 | Error in the rollover check & | |||
| 588 | *************** Decision ***************************** | |||
| 589 | The loan number is not in the application status | |||
| 590 | No main object available for application & | |||
| 591 | No land register data available for object & | |||
| 592 | No address exists for object & | |||
| 593 | Enter a product type | Space: object requires documentation | ||
| 594 | Contract & has already been created | |||
| 595 | No & created | |||
| 596 | Error & in the release of & | |||
| 597 | Application & successfully released | |||
| 598 | Total loan sum is larger than the application loan amount | |||
| 599 | No data from the credit standing check exists for this partner | Space: object requires documentation | ||
| 600 | Release cancelled for application & | |||
| 601 | Release inactive at present | |||
| 602 | Object type &1 not defined | Space: object requires documentation | ||
| 603 | No data exists from collateral value determination | Space: object requires documentation | ||
| 604 | 'Decision' function not available for product types for loans taken (&1) | Space: object requires documentation | ||
| 605 | *************** Parts of building overview and entry **************** | |||
| 606 | No building part exists | |||
| 607 | Building part number & already assigned | |||
| 608 | Building part & was changed | |||
| 609 | Building part & deleted | |||
| 610 | No building part available for object | |||
| 611 | Totals overflow; Addition for all buildings not possible | |||
| 612 | Totals overflow: Addition to total area not possible | |||
| 613 | Enter the usage type | Space: object requires documentation | ||
| 614 | No previous building part exists | Space: object requires documentation | ||
| 615 | & was & | |||
| 616 | Overflow occurred while calculating the new commitment | Space: object requires documentation | ||
| 617 | Overflow occurred while calculating the existing commitment | Space: object requires documentation | ||
| 618 | Overflow occurred while calculating the total granted | Space: object requires documentation | ||
| 619 | ************** Transfer postings (continued from message 632) ********* | |||
| 620 | Loan & already repaid | |||
| 621 | Advance payment for loan &, transfer not allowed | |||
| 622 | Credit memo record available for loan &, transfer not permitted | |||
| 623 | Interest repayment-relevant posting exists after key date for loan & | Space: object requires documentation | ||
| 624 | Discount accrued incorrect for loan & | |||
| 625 | Interest repmnt-relevant planned record exists after key date for loan & | Space: object requires documentation | ||
| 626 | Loan &: Discount transfer posting amount is greater than permitted | Space: object requires documentation | ||
| 627 | Error in the transfer posting | Space: object requires documentation | ||
| 628 | No acct assignment ref. change since the last transfer posting | |||
| 629 | No acct assignment ref. change since the loan exists | |||
| 630 | No transfer flags exist for the selected loans | Space: object requires documentation | ||
| 631 | The loan &1 is flagged for the balance sheet transfer run | Space: object requires documentation | ||
| 632 | Reversal of transfer of capital was posted | |||
| 633 | Reversal of capital transfer was terminated due to error & | Space: object requires documentation | ||
| 634 | Posting terminated as a result of user entry | Space: object requires documentation | ||
| 635 | New condition exists after key-date for loan & | |||
| 636 | Posting error in final payment settlement | Space: object requires documentation | ||
| 637 | Loan &: Premium transfer > Permitted prem. - Guaranteed prem. | |||
| 638 | Loan with premium and discount in one transfer | Space: object requires documentation | ||
| 639 | Loans given und loans taken in one transfer posting | |||
| 640 | Posting date is before the posting date of the documents to be reversed | Space: object requires documentation | ||
| 641 | No amount entered for loan & | |||
| 642 | You have not pressed 'enter' so no checks were run | Space: object requires documentation | ||
| 643 | Advance payment test: Transfer posting not possible | Space: object requires documentation | ||
| 644 | Corresponding reference entry for & missing | Space: object requires documentation | ||
| 645 | You can only reverse this flow by reversing a capital transfer | Space: object requires documentation | ||
| 646 | Reversal referencing error; loan &1 in company code &2 | Space: object requires documentation | ||
| 647 | The contracts entered have different product types | Space: object requires documentation | ||
| 648 | Loans with 'net' posting sys. and rate gain determ. cannot be transferred | Space: object requires documentation | ||
| 649 | IPD block can only be reset manually | Space: object requires documentation | ||
| 650 | ** Disbursements/ Postings/ Pmnt adv.not.mainten./ Pmnt splitting *** | |||
| 651 | Customer &1 has no bank details of the bank details ID &2 | Space: object requires documentation | ||
| 652 | No bank details available for customer & | |||
| 653 | Enter the bank data in the bank directory | Space: object requires documentation | ||
| 654 | Error whilst reading customer & in company code & | |||
| 655 | TZB06 not maintained for key & & & & (no amount witheld) | |||
| 656 | Enter at least the flow type, date and amount | Space: object requires documentation | ||
| 657 | An entry with the same date already exists | |||
| 658 | Local currency amount and rate of exchange reset | |||
| 659 | Flow type & is not permitted for loans | |||
| 660 | Flow type & is not permitted for maintaining pmnt advice notice | |||
| 661 | No pmnt advice notice data exists | |||
| 662 | Flow cannot be saved | |||
| 663 | Main loan partner could not be determined | Space: object requires documentation | ||
| 664 | Reference flow type missing for flow type & (TZB06) | |||
| 665 | Withholding amount was cancelled since customer is alternative payer | Space: object requires documentation | ||
| 666 | No suitable line items found (VDBEPI) & & | |||
| 667 | Check incidental expenses since changes have probably been lost | Space: object requires documentation | ||
| 668 | Gross amount and percentage rate could not be determined | |||
| 669 | Check condition-dependent incidental costs | Space: object requires documentation | ||
| 670 | Check allocation of incidental costs due to modified payment date | Space: object requires documentation | ||
| 671 | & overdue items have been deselected | |||
| 672 | Not possible to reset overdue items | |||
| 673 | No customer assigned to partner &1 | Space: object requires documentation | ||
| 674 | You are creating a disbursement for a period that is already posted | Space: object requires documentation | ||
| 675 | No corresponding flow data exists for release | Space: object requires documentation | ||
| 676 | No posting object has been selected | Space: object requires documentation | ||
| 677 | Not all of the required values have been entered | Space: object requires documentation | ||
| 678 | Error while importing the release data | Space: object requires documentation | ||
| 679 | ********* Special arrangements-Overview and entry ********************** | |||
| 680 | No special arrangement exists | |||
| 681 | Special arrangement: Changes were saved | |||
| 682 | Special arrangement: Deletion stored | |||
| 683 | Type of restraint on drawing & not in table TZV05 | Space: object requires documentation | ||
| 684 | You need to specify currency when entering an amount | Space: object requires documentation | ||
| 685 | Error whilst reading the special arrangements & | |||
| 686 | Entry of special arrangement cancelled externally | Space: object requires documentation | ||
| 687 | Error in the processing of special arrangement &1 | Space: object requires documentation | ||
| 688 | ************** Conditions ************************* | Space: object requires documentation | ||
| 689 | Position the cursor on a valid condition header | Space: object requires documentation | ||
| 690 | ************** Collateral ************************* | Space: object requires documentation | ||
| 691 | Land registry & does not exist | Space: object requires documentation | ||
| 692 | Encumbrance does not exist | |||
| 693 | Loan collateral does not exist | |||
| 694 | Land register, section III not available | |||
| 695 | Encumbrance no. & created for object & | |||
| 696 | Encumbrance number &1 changed for object &2 | Space: object requires documentation | ||
| 697 | There are still joint liability objects to be processed | |||
| 698 | Section III-Number already assigned | |||
| 699 | Selection not permitted (only joint liability objects allowed) | Space: object requires documentation | ||
| 700 | Encumbrance still missing for referenced main object | |||
| 701 | Encumbrance created for joint liability object &1 | Space: object requires documentation | ||
| 702 | Encumbrance no. & released for object & | |||
| 703 | Release collateral with joint liability objects first | Space: object requires documentation | ||
| 704 | Release only permitted for encumbrances saved in system | |||
| 705 | Encumbrance changed for joint liability object &1 | Space: object requires documentation | ||
| 706 | & & has been created | |||
| 707 | & & has been changed | |||
| 708 | Contract end is before contract date | |||
| 709 | Contribution is greater than or equal to the value | Space: object requires documentation | ||
| 710 | An entry already exists on this date | |||
| 711 | Collateral is already assigned | |||
| 712 | Assignment amount exceeds the total value of the collateral | |||
| 713 | Assignment amount and total value have different currencies | |||
| 714 | Set index-linked indicator | Space: object requires documentation | ||
| 715 | Selection criteria does not correspond with the collateral type | Space: object requires documentation | ||
| 716 | Selection carried out only for criteria in selection block 2 | |||
| 717 | Entry & does not exist | |||
| 718 | Entry & is not maintained as an encumbrance | |||
| 719 | No encumbrances exist for the assignment | Space: object requires documentation | ||
| 720 | Collateral type is not entered as main collateral | |||
| 721 | Enter the company code first | Space: object requires documentation | ||
| 722 | ***************** Accruals/deferrals / Waiver/ Non-acceptance *** | |||
| 723 | Date cannot be later than the end of the fixed period | Space: object requires documentation | ||
| 724 | Date cannot be before the start of the fixed period | Space: object requires documentation | ||
| 725 | Accruals/deferrals were posted | |||
| 726 | Enter the posting date | Space: object requires documentation | ||
| 727 | No accruals/deferrals amounts determined | |||
| 728 | Amount cannot be larger than disbursement obligation | Space: object requires documentation | ||
| 729 | Loan has already been disbursed | |||
| 730 | Select what you want to accrue/defer -(discount)premium - others | Space: object requires documentation | ||
| 731 | Only select one accrual/deferral type (discount)premium - others | Space: object requires documentation | ||
| 732 | It is not possible to release the disbursement | |||
| 733 | Enter a flow type | Space: object requires documentation | ||
| 734 | Enter only valid flow types | Space: object requires documentation | ||
| 735 | Flow type you entered is not relevant to accrual/deferral. | |||
| 736 | Flow types not relevant to acc./def. or don't match with acc./def. type | Space: object requires documentation | ||
| 737 | For discount/premium accrual/deferral, enter only correspond. flow types | Space: object requires documentation | ||
| 738 | Make entries in all fields | Space: object requires documentation | ||
| 739 | One offer must be available for a partial waiver | |||
| 740 | Posting date lies in the future | |||
| 741 | Posting date is before the accrual/deferral key date | |||
| 742 | Posting date of reset is before the accrual/deferral key date | |||
| 743 | No accrual/deferral flow types have been customized | |||
| 744 | No posted accrual/deferral flows exist for processing | |||
| 745 | Error when VDBEPI read for customer & | |||
| 746 | Internal error during determination of reference flow type for &1 | Space: object requires documentation | ||
| 747 | Entry & is greater than the amount in arrears & | |||
| 748 | VDBEPP record has no SREFBEW, RZEBEL is & | |||
| 749 | Error: Posting date of records to be reversed is after reversal post.date | Space: object requires documentation | ||
| 750 | Costs could not be saved | Space: object requires documentation | ||
| 751 | Posting date for reset is before accrual/deferral posting date | Space: object requires documentation | ||
| 752 | ************* DEADLINE MONITORING ************************************ * | |||
| 753 | & deadline reminder(s) were found | |||
| 754 | Report RFVDSTDA is out of date, use report RFVDFAVI | Space: object requires documentation | ||
| 755 | More than one sender is maintained; system applies company code &1 | The short text describes the object sufficiently | ||
| 756 | ************* Account statements and other lists *********** | Space: object requires documentation | ||
| 757 | Error occurred while hiding flow types | Space: object requires documentation | ||
| 758 | No payment usage found for loan document & | Space: object requires documentation | ||
| 759 | No data exists | Space: object requires documentation | ||
| 760 | Document date of reset is before accrual/deferral posting date | Space: object requires documentation | ||
| 761 | Document date of reversal is before posting date of flow | Space: object requires documentation | ||
| 762 | Open items exist for a customer who is not the main borrower | Space: object requires documentation | ||
| 763 | Download is not supported on your client | The short text describes the object sufficiently | ||
| 764 | Unable to save file | The short text describes the object sufficiently | ||
| 765 | User interface refused file transfer | The short text describes the object sufficiently | ||
| 766 | Borrower number of partner &1 is not maintained | The short text describes the object sufficiently | ||
| 767 | Borrower entity number of partner &1 is not maintained | The short text describes the object sufficiently | ||
| 768 | Approach used for partner &1 is not maintained | The short text describes the object sufficiently | ||
| 769 | Risk classification for partner &1 is not maintained | The short text describes the object sufficiently | ||
| 770 | Creditor ID for company code &1 is not maintained | The short text describes the object sufficiently | ||
| 771 | Flow types cannot be hidden | Space: object requires documentation | ||
| 772 | 'Entry date' after 'System date' | Space: object requires documentation | ||
| 773 | Date 'From' or date 'To' is missing | |||
| 774 | The values displayed cannot be changed | |||
| 775 | No active loans selected | |||
| 776 | No postings exist | |||
| 777 | No FI document number exists | |||
| 778 | Output incomplete due to lack of authorizations | Space: object requires documentation | ||
| 779 | Only one company code is permitted per report run | Space: object requires documentation | ||
| 780 | Column entry is missing in flow type &1 | Space: object requires documentation | ||
| 781 | No reversal postings could be hidden | |||
| 782 | Only one flow exists | Space: object requires documentation | ||
| 783 | Error occurred while determining the overpayment | Space: object requires documentation | ||
| 784 | Altogether, & records were selected | |||
| 785 | ****** Interest Certificate and External Account Statement ************** | |||
| 786 | Evaluation gap between last key date (&1) and 'date from' (&2) | Space: object requires documentation | ||
| 787 | No copy can be made of last acct statement because it is not created yet | |||
| 788 | Start date is after the key date of account statement | |||
| 789 | 'Date from' (&1) adjusted to last key date (&2) | Space: object requires documentation | ||
| 790 | Interest certificate already created for this period | Space: object requires documentation | ||
| 791 | Start date of account statement < than date of first entry | |||
| 792 | You do not have authorization | Space: object requires documentation | ||
| 793 | Processing type: 'Manual' defined. | Space: object requires documentation | ||
| 794 | Processing type: 'Do not generate IC' defined | Space: object requires documentation | ||
| 795 | No postings relevant to interest certificate in the evaluation period | Space: object requires documentation | ||
| 796 | Customizing: Internal flow type &1 is not assigned | Space: object requires documentation | ||
| 797 | Special postings (IVA): No interest certificate | Space: object requires documentation | ||
| 798 | Customizing: Display '&1' not permitted | Space: object requires documentation | ||
| 799 | Customizing: Assignment to column &1 not permitted | Space: object requires documentation | ||
| 800 | Customizing: External flow type &1 not maintained | Space: object requires documentation | ||
| 801 | Reversal indicator &1 not taken into consideration for postings | Space: object requires documentation | ||
| 802 | Evaluation already made for part of period | Space: object requires documentation | ||
| 803 | Key date could not be updated | Space: object requires documentation | ||
| 804 | Key date was not updated due to error message | Space: object requires documentation | ||
| 805 | No loan selected | Space: object requires documentation | ||
| 806 | The key date (date until) is after or the same as the current date | Space: object requires documentation | ||
| 807 | Debit/credit indicator not maintained in table TZBOK | |||
| 808 | Period was changed because copy of the last ext. acct stmnt was generated | Space: object requires documentation | ||
| 809 | Date from is after date until | |||
| 810 | No external acct statement-relevant postings in the evaluation period | |||
| 811 | Special postings (IVA). No external account statement possible | Space: object requires documentation | ||
| 812 | Key date must after start date | |||
| 813 | Start date of account statement is after the commitment date of loan | |||
| 814 | Key date of current account statement is after the current date | Space: object requires documentation | ||
| 815 | Key date of curr. account statement is identical with current date | |||
| 816 | Generation frequency for this loan is 7 (no generation) | |||
| 817 | Curr. account statement already exists -> only copy of last one possible | Space: object requires documentation | ||
| 818 | Start of period may be changed if account statement already exists | |||
| 819 | Periods are ignored, as copy of last account statement is generated | |||
| 820 | ************* Order *********************************** | |||
| 821 | Date 'Value date up to' is before the date 'Value date from' | |||
| 822 | No preemption conditions have been created on this date | |||
| 823 | Rate will be adjusted in accordance with preemption conditions | Space: object requires documentation | ||
| 824 | Enter account assignment reference | Space: object requires documentation | ||
| 825 | No orders available | |||
| 826 | Remaining investment is & | |||
| 827 | Choose & | Space: object requires documentation | ||
| 828 | Selected order has already been executed - only display function possible | Space: object requires documentation | ||
| 829 | Order creation not possible; capital no longer available | |||
| 830 | Only & & available for the order | |||
| 831 | Execution not possible. There are still orders with an earlier date | |||
| 832 | Reverse all the documents, starting with document &1 of the order | Space: object requires documentation | ||
| 833 | Delete/reverse all subsequent orders first | Space: object requires documentation | ||
| 834 | & is not a contract | |||
| 835 | Calculation date before period start & | |||
| 836 | General exception while reading values from the screen before PAI | Space: object requires documentation | ||
| 837 | *** Messages for posting area ******************************************* | |||
| 838 | ************* Reports from posting area ********************************* | |||
| 839 | The flow type & is not available in table TZB0A | |||
| 840 | No manual posting available (memo records) for loan no. & | |||
| 841 | Flow type & entered is not available or not permitted | |||
| 842 | Select dunning charges or interest on arrears | Space: object requires documentation | ||
| 843 | No plannned or suspense data exists for loan number &1 | Space: object requires documentation | ||
| 844 | No actual records exist for loan &1 | Space: object requires documentation | ||
| 845 | No manual posting available on key date & | |||
| 846 | Enter the key date | Space: object requires documentation | ||
| 847 | Cancel payment block in document | Space: object requires documentation | ||
| 848 | Enter valid value (X) | Space: object requires documentation | ||
| 849 | Only select one document | Space: object requires documentation | ||
| 850 | Select one company code only | Space: object requires documentation | ||
| 851 | On the following screen, carry out the reversal using the function "Save" | Space: object requires documentation | ||
| 852 | A condition could be created via repayment. Check | Space: object requires documentation | ||
| 853 | No manual postings exist | Space: object requires documentation | ||
| 854 | Suspense data has already been written. Function not possible | Space: object requires documentation | ||
| 855 | No data was selected | Space: object requires documentation | ||
| 856 | Only enter one repayment | Space: object requires documentation | ||
| 857 | Enter date in correct form | Space: object requires documentation | ||
| 858 | Release object not found | Space: object requires documentation | ||
| 859 | No overdue items exist | Space: object requires documentation | ||
| 860 | Taxes will be posted as well | Space: object requires documentation | ||
| 861 | If it cannot be solved automatically, edit the conditions | Space: object requires documentation | ||
| 862 | It is not possible to reduce installments for this repayment type | Space: object requires documentation | ||
| 863 | Position cursor on posting text | Space: object requires documentation | ||
| 864 | Invalid value | Space: object requires documentation | ||
| 865 | Records from the conditions cannot be deleted | Space: object requires documentation | ||
| 866 | Postings which are not based on conditions cannot be reversed | |||
| 867 | The item is not cleared | Space: object requires documentation | ||
| 868 | Enter a reason for reversal | Space: object requires documentation | ||
| 869 | An unsch. repayment already exists for a later date. Reverse this first | Space: object requires documentation | ||
| 870 | No address exists for loan no. & | Space: object requires documentation | ||
| 871 | No loan collateral acc. to PRF list 04 exists for loan no. & | Space: object requires documentation | ||
| 872 | No collateral in securities (PRF list 05, subs. 01) exists for loan no. & | Space: object requires documentation | ||
| 873 | No collateral in reg. bonds (PRF list 05, subs. 2) exists for loan no. & | Space: object requires documentation | ||
| 874 | No collateral in cash (PRF list 05, subs. 03) exists for loan no. & | Space: object requires documentation | ||
| 875 | No collateral in life insurance (PRF list 07) exists for loan no. & | Space: object requires documentation | ||
| 876 | & & & & | |||
| 877 | & & & |
History
| Last changed on/by | 20130531 | SAP | |
| SAP Release Created in | 110 |