Hierarchy

⤷

⤷

Attribute
Message class | ![]() |
F2 | |
Short Description | ![]() |
Master Data Maintenance: Customer, Vendor | |
Message Number | ![]() |
411 | |
Documentation status | ![]() |
||
Authorization check Error Message | |||
Changed On | ![]() |
20131127 |
Message Text
Help Document
Diagnosis
You have changed the IBAN from to but have not changed the validity begin.
In your system the IBAN (TIBAN-IBAN) and/or its validity begin (TIBAN-VALID_FROM) are defined as sensitive data and therefore, each change to the respective field must be confirmed by a second user (dual control principle). To ensure that the changed IBAN data is not used until it has been confirmed, before saving the validity begin must be changed to the maximum date and can only be set to the correct date when confirmation takes place.
In this change, you have changed the IBAN from to but have not changed the validity begin. This means that the old validity begin is used for the new IBAN.
System Response
The validity begin (TIBAN-VALID_FROM) of the new IBAN is saved with the maximum date before confirmation and with the correct date when confirmation takes place.
Procedure
If IBAN is to have a different validity begin to , you have to enter the relevant date.
Procedure for System Administration
Effects on Customizing
You can define when this system message is to be issued in accordance with your requirements.
You do this in Customizing as follows: Cross-Application Components -> Bank Directory -> Change Message Control.
The application area and message number can be taken from the technical documentation.
History
Last changed on/by | ![]() |
20131127 | SAP |
SAP Release Created in |