SAP ABAP Message Class CNVMBTPEM (PEM (Process Execution Manager))
Basic Data
Hierarchy
DMIS (Software Component) DMIS 2011_1
   CA-EUR (Application Component) European Monetary Union: Euro
     CNV_MBT_PCL (Package) Components of PCL to be imported into PCL system
Attributes
Message class CNVMBTPEM
Short Description PEM (Process Execution Manager)  
Changed On 20141030 
Last Changed At 035634 
Messages
# Message Message Short Text Documentation status Authorization check
1 001 Writing PEM state entry failed Space: object requires documentation
2 002 No state entry exist Space: object requires documentation
3 003 Updating state failed Space: object requires documentation
4 004 Not allowed to execute Dialog Blocks Space: object requires documentation
5 005 Object type expected &1 but gotten &2 Space: object requires documentation
6 006 Background job with status &1 Space: object requires documentation
7 007 Execution already with status FINISHED Space: object requires documentation
8 008 Start date &1 is in the past Space: object requires documentation
9 009 &1 already executed and restart is not allowed Space: object requires documentation
10 010 Maximum number of allowed restarts is &1 and already reached Space: object requires documentation
11 011 Block execution failed because of '&1'. Space: object requires documentation
12 014 Start mode for &1 is manually but executed in background. Space: object requires documentation
13 015 No active group could be determined Space: object requires documentation
14 016 Create block failed with error '&1' Space: object requires documentation
15 017 The ID &1 is not a block Space: object requires documentation
16 018 &1 started on &2 at &3 Space: object requires documentation
17 019 &1 finished Space: object requires documentation
18 020 &1 has not finished predecessors Space: object requires documentation
19 021 Create &1 object failed with message &2 Space: object requires documentation
20 022 &1 finished on &2 at &3 Space: object requires documentation
21 024 Execution stopped by setting parameter &1 Space: object requires documentation
22 025 &1 execution not possible. &1 already locked (foreign lock). Space: object requires documentation
23 026 Could not set an enqueue for the &1. Space: object requires documentation
24 027 Set enqueue for &1 successful. Space: object requires documentation
25 028 Called dequeue for &1. Space: object requires documentation
26 029 Maximum number 9999 of &1 executions reached. Space: object requires documentation
27 030 Action cancelled by program and caused by error. Space: object requires documentation
28 031 Start date is in the future Space: object requires documentation
29 032 PEM Plan updated. Get latest PEM Plan. Space: object requires documentation
30 033 Starting dialog activity &1 with PIFD variant Space: object requires documentation
History
Last changed on/by 20141030  SAP 
SAP Release Created in   2010_1_620