SAP ABAP Message Class CE Message Number 545 (Operation &, sub-operation & caused overflow)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PP-BD-CAP (Application Component) Computer Aided Process Planning
⤷ CEV (Package) R/3 Applic. development: PPS CAPP standard times calculation
⤷ PP-BD-CAP (Application Component) Computer Aided Process Planning
⤷ CEV (Package) R/3 Applic. development: PPS CAPP standard times calculation
Attribute
Message class | CE | ||
Short Description | CAPP messages | ||
Message Number | 545 | ||
Documentation status | |||
Authorization check Error Message | |||
Changed On |
Message Text
Operation &, sub-operation & caused overflow
Help Document
Diagnosis
Standard values have been calculated for operation , sub-operation .
When the results were transferred to the operation, an overflow occurred.
System Response
The results of the standard values were set to the maximum value possible in the corresponding fields, for example, 9999999.
Procedure
Please check your calculations. If necessary, assign new values to the method characteristics.
The overflow could also be due to the fact that you have specified smaller units for the standard values in the operation (for example, minutes) than in the corresponding methods (for example, hours).
History
Last changed on/by | 19970821 | SAP | |
SAP Release Created in |