SAP ABAP Message Class CE Message Number 525 (Operation & caused overflow)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   PP-BD-CAP (Application Component) Computer Aided Process Planning
     CEV (Package) R/3 Applic. development: PPS CAPP standard times calculation
Attribute
Message class CE  
Short Description CAPP messages    
Message Number 525  
Documentation status      
Authorization check Error Message      
Changed On    
Message Text
Operation & caused overflow
Help Document

Diagnosis

Standard values have been calculated for operation . When the results were transferred to the operation, an overflow occurred.

This may be because you have assigned smaller units to the standard values in the operation (for example, minutes) than to one of the methods calculated (for example, hours).

System Response

The standard values for which an overflow occurred were set to the maximum value.

Procedure

Please check your calculations. If necessary, recalculate the methods again.

History
Last changed on/by 19970821  SAP 
SAP Release Created in