SAP ABAP Message Class AUR Message Number 050 (The simulation periods do not match contract &1)
Hierarchy
☛
IS-UT (Software Component) SAP Utilities/Telecommunication
⤷
IS-U-BI (Application Component) Contract Billing
⤷
EE20 (Package) IS-U: Billing

⤷

⤷

Attribute
Message class | ![]() |
AUR | |
Short Description | ![]() |
Unbilled Revenue Reporting and Mass Simulation | |
Message Number | ![]() |
050 | |
Documentation status | ![]() |
||
Authorization check Error Message | |||
Changed On | ![]() |
20050224 |
Message Text
The simulation periods do not match contract &1
Help Document
Diagnosis
You have chosen simulation period to for contract . This simulation period is not permissible for one of the following reasons:
- The start of the simulation period is after the end of the simulation period
- The start of the simulation period is before the move-in date for the contract
- The end of the simulation period is after the move-out date for the contract
System Response
The contract cannot be simulated.
Procedure
The simulation period was calculated by method SIM_METHOD_DETERMINE of Business Add-In ISU_BI_MASS_SIMUL. Correct the coding of your BADI implementation.
Procedure for System Administration
History
Last changed on/by | ![]() |
20130531 | SAP |
SAP Release Created in | 463 |