SAP ABAP Message Class AUR Message Number 050 (The simulation periods do not match contract &1)
Hierarchy
IS-UT (Software Component) SAP Utilities/Telecommunication
   IS-U-BI (Application Component) Contract Billing
     EE20 (Package) IS-U: Billing
Attribute
Message class AUR  
Short Description Unbilled Revenue Reporting and Mass Simulation    
Message Number 050  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20050224   
Message Text
The simulation periods do not match contract &1
Help Document

Diagnosis

You have chosen simulation period to for contract . This simulation period is not permissible for one of the following reasons:

  • The start of the simulation period is after the end of the simulation period
  • The start of the simulation period is before the move-in date for the contract
  • The end of the simulation period is after the move-out date for the contract

System Response

The contract cannot be simulated.

Procedure

The simulation period was calculated by method SIM_METHOD_DETERMINE of Business Add-In ISU_BI_MASS_SIMUL. Correct the coding of your BADI implementation.

Procedure for System Administration

History
Last changed on/by 20130531  SAP 
SAP Release Created in   463