SAP ABAP Message Class AUR Message Number 036 (Simulation period &1 is inconsistent)
Hierarchy
☛
IS-UT (Software Component) SAP Utilities/Telecommunication
⤷
IS-U-BI (Application Component) Contract Billing
⤷
EE20 (Package) IS-U: Billing

⤷

⤷

Attribute
Message class | ![]() |
AUR | |
Short Description | ![]() |
Unbilled Revenue Reporting and Mass Simulation | |
Message Number | ![]() |
036 | |
Documentation status | ![]() |
||
Authorization check Error Message | |||
Changed On | ![]() |
20050224 |
Message Text
Simulation period &1 is inconsistent
Help Document
Diagnosis
The simulation periods from to for the identification of the simulation period is inconsistent for one of the following reasons:
- The simulation period does not begin on the first day of a month.
- The simulation period does not end on the last day of a month.
- The start of the simulation period is not before the end of the simulation period.
System Response
You cannot use this simulation period.
Procedure
Correct the start date and end date of the simulation period.
Procedure for System Administration
History
Last changed on/by | ![]() |
20130531 | SAP |
SAP Release Created in | 463 |