SAP ABAP Message Class 9J Message Number 198 (Incorrect entry for calendar week)
Hierarchy
☛
ECC-DIMP (Software Component) DIMP
⤷ IS-EC-CEM (Application Component) Construction Equipment Management
⤷ J3GP (Package) CEM Module Pools
⤷ IS-EC-CEM (Application Component) Construction Equipment Management
⤷ J3GP (Package) CEM Module Pools
Attribute
Message class | 9J | ||
Short Description | |||
Message Number | 198 | ||
Documentation status | |||
Authorization check Error Message | |||
Changed On |
Message Text
Incorrect entry for calendar week
Help Document
Diagnosis
The calendar week has been entered in an incorrect format (YYYYWW) or with an incorrect week (smaller than 00 or greater than 52 or 53).
System Response
Procedure
History
Last changed on/by | 20131127 | SAP | |
SAP Release Created in |