SAP ABAP Message Class 63 Message Number 589 (Settlement variants or validity contradict existing cost collectors)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ FVVI (Package) R/3 appl.dev. for Financial Assets Management: Real estate
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ FVVI (Package) R/3 appl.dev. for Financial Assets Management: Real estate
Attribute
Message class | 63 | ||
Short Description | Messages for Real Estate Management | ||
Message Number | 589 | ||
Documentation status | Space: object requires documentation | ||
Authorization check Error Message | |||
Changed On | 20030110 |
Message Text
Settlement variants or validity contradict existing cost collectors
Help Document
Diagnosis
You have changed the assignment of the settlement variants to the settlement unit or the validity period in such a way that the resulting settlement periods are inconsistent with the cost collectors already generated.
System Response
The system does not allow such a change.
Procedure
Change the settlement variant back to the original assignment.
If you have changed the validity period of a settlement unit such that the end date of the settlement unit is before a generated and posted cost collector, that cost collector may not be deleted.
History
Last changed on/by | 19970609 | SAP | |
SAP Release Created in |